Aligning EDIS with Guidance Note 3

Similar documents
C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

15 Appendix 15 Notes on periodic inspecting and testing

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Inspection and Testing

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

Inspection and Testing Pocket Notes

Landlord Report Operational limitations including the reasons (see page No. ) N/A

General maintenance engineering applications

Health & Safety Policy & Plan. Rightway Roofing.

Maintaining electrical equipment/systems

General maintenance engineering applications

Electrical Shore Connections

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

Portable Appliance Testing

IGEM/GM/7A Edition 2 Communication 1803 Electrical connections for gas metering equipment

Status Date Prepared Reviewed Endorsed Approved

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Electrical Machines & Drives Group Safety Policy 2018/2019

Lock Out - Tag Out Safety Program

Aeronautical studies and Safety Assessment

MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY

Lifting Operation & Lifting Equipment Procedure

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

Health & Safety: Electrical safety

SLOP RECEPTION AND PROCESSING FACILITIES

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT)

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

PAT Testing Procedures WYMONDHAM RUGBY FOOTBALL CLUB. Wymondham RFC PAT Testing Procedure Version 1 Revision 3 Wednesday, 27 July 2016 Page 1

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

CCSSL35 Carry out the wiring and testing of electrical circuits and equipment

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

Health and Safety Inspection Procedure

ES18 Security Theory/Regulations Answer Schedule

6 lockout operations every electrician MUST perform and respect

Electrical Equipment Protocol

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

Electrical Safety in the Food Industry

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

Electrical Safety (Portable Electric Equipment) Policy

An Update on IEC TC 81 (Lightning Protection)

Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

CONTRACTOR SAFETY INDUCTION HANDBOOK

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

LOCKOUT SYSTEM AND POLICIES

Plant Isolation Lock out/tag out Procedure

UK ADC Ltd. Association of Diving Contractors. Inland / Inshore Diving Supervisors Certification Scheme

MP 3.4 SWIMMING POOL BARRIERS. Table of Contents

Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment

IALA World-Wide Academy. Model Course For. Aids to Navigation. Level 2 Technician Training

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

PSSI 1 High Voltage Switching

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

In Vessel Composter Installation & Commissioning Manual

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY

CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE

BCGA GUIDANCE NOTE 17

Hampstead Hill School Health and Safety Policy: Play Equipment

VI.D AIR DISCONNECT SWITCHES

Recent changes in workplace safety regulations have heightened the awareness of hazards associated with electrical arcs.

LEGIONELLA MANAGEMENT PROCEDURE

THE FOOTBALL ASSOCIATION OF IRELAND

QPEO2/033N Credit Value: 14 QCF Level: 2 GLH: 64 Wiring and testing electrical equipment and circuits

University of Vermont Department of Physical Plant Burlington, Vermont

Project & Task Work Health and Safety Risk Management Procedure

DK46 - DK800 Supplementary instructions

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

BODY OF KNOWLEDGE TANK ENTRY SUPERVISOR CERTIFICATION PROGRAM Revision 2, October 2013

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

SEMME2135 Assisting in modifying and adding electrical circuits in yachts and boats

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

PRESSURE SYSTEMS POLICY

Blue Whale Spa :- Site Preparation and Delivery

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

In-Service Inspection and Testing of Electrical Equipment Certificate

Lockout/Tagout Program

Arran LED Floodlight Luminaire

ATEX, IECEx and MET (Class I, Division 1) Safety Instructions icam502

User Information Sheet 015

SEMEEE36 Checking the compliance of electrical equipment against the specification

TRANSPORTABLE BUILDING PERIODIC INSPECTION REPORT

Lockout/Tagout Safety Policy

Full-Time Cup Competitions Version 5.0

SEMEEE3-34 Carrying out functional tests on electrical equipment

Testing and Inspection. eurosafesolutions.com

Transcription:

EDIS USER GUIDE Aligning EDIS with Guidance Note 3 Using EDIS to adhere to Guidance Note 3: Inspection & Testing (Electrical Regulations), incorporating amendment 3 2015 Doc Version: 27 Feb 2017 www.electricalcertificates.co.uk (EDIS is the Electrical Distribution Information System) www.electrical certificates.co.uk

After reading this document you should be able to: Use the EDIS system to adhere to the requirements in Guidance Note 3, BS7671 2008, Amendment 3, 2015 Contents Purpose of the document 3 EDIS Prerequisites 3 GN3 - Purpose of periodic inspection and testing 3 Inspection frequencies 4 Selecting samples 6 Selecting boards and circuits to test 7 Classifying observations and re commendations 7 How EDIS uses the Maximum Zs values 8 EDIS PROCEDURES (E.P.) 8 EP1 Selecting circuits for testing in EDIS 8 EP2-Setting the Default Inspection Frequencies in EDIS 10 EP3 - Recording the Risk Assessment in EDIS 12 EP4 - Recording limitations and deviations for tests 13 EP5 - Certifying certificates and the resulting update of the distribution board details 13 2/15 Save 23/01/2017

1 Purpose of the document Guidance Note 3: Inspection & Testing (17th Edition, BS7671: 2008 incorporating amendments 3: 2015) provides information for carrying out inspection and testing on electrical installations. EDIS aligns with these requirements and the content below aims to provide guidance on how EDIS can be used, specifically: Table 3.2 - Recommended initial frequencies of electrical inspection Table 3.3 Range of samples for inspection Table 3.5 Classification of danger and non-compliance (observations and recommendations classification codes) This document should be read in conjunction with the EDIS work instructions for contractors. 2 EDIS Prerequisites This guide provides instructions primarily for electricians, testers and qualifying supervisors on how to use EDIS in a way that enables compliance with Guidance Note 3. The required EDIS system rights and permissions are mostly for electrician and qualifying supervisor, some EDIS compliance management features require building administration rights. If you require building administration rights you should request them, instruction to do so can be found in section 4 of the user permissions guide. 3 GN3 - Purpose of periodic inspection and testing The primary aim of periodic electrical inspection and testing is to confirm that the so far as is 1 reasonably practicable, whether the installation is in a satisfactory condition for continued service. so far as is reasonably practicable is used regulation, it allows for a balance to be struck between, on one hand, the level of risk reduction considered acceptable and on the other hand, the cost, time and effort of reducing the risk to such an acceptable level. 1 so far as is reasonably practicable is defined in the case Edwards v National Coal Board, https://en.wikipedia.org/wiki/edwards_v_national_coal_board 3/15 Save 23/01/2017

4 Inspection frequencies Table 3.2 - Recommended initial frequencies of electrical inspection provides a guide to the initial time interval between initial installation and the next inspection date. For a new installation, the initial inspection frequency guidelines in Table 3.2 can be followed. The challenge faced by compliance manager is in deciding the frequency for subsequent frequencies. The guide states In short, the inspector, being a skilled person, should apply engineering judgement when deciding on intervals and may use Table 3.2 as a starting point for the decision. The frequencies in EDIS are record in the last test and next test dates for each circuit. These dates are set when a Minor Works, New Installation or Condition Report is completed. EDIS suggests a default date which can be overridden by the inspector. The section EP2-Setting the Default Inspection Frequencies in EDIS, shown below, describes the steps to setting default frequencies for the next inspection. 4/15 Save 23/01/2017

TABLE 3.2 - GUIDANCE NOTE 2 5/15 Save 23/01/2017

5 Selecting samples For electrical inspection and testing in buildings where distribution boards and circuits have the same manufactured and installed specification a testing a sample will provide statistically based confidence that the electrical installation meets the required electrical safety standard. To do this a sampling strategy needs to be developed. Guidance note Table 3.3 Range of samples for inspection provides advice on selecting the test sample: Main switchgear (external)- 100% Main switchgear (internal sections and cable connections) 100% where practicable, not less than 10% Main switch gear (internal), inspection of circuit breaker connections and control sections - - ideally 100% not less than 10%. Final circuit distribution boards Ideally 100%, not less than 25% Final circuit accessories Between 10% and 100% Earthing and protective bonding conductors 100% The guidance in Table 3.3 can be broadly summarised as : ITEM Ideal Lowest Typical checks Sample sample size size Inspection of Main switchgear (external) 100% 100% Visual inspection for signs of overheating, aging or damage Inspection of Main switchgear (internal) 100% >10%, (100% where practicable) A visual inspection for signs of overheating, aging or damage, Check tightness of cable connections. Sub-Mains distribution boards 100% >10%, (100% where practicable) 6/15 Save 23/01/2017 The mains distribution boards, i.e a board supplying another board can classed as part of the main switchgear and treated in the same

way Final distribution boards 100% >25% These are the boards that supply the final, or terminating, point of the system, refer note 4 below Final circuit accessories 100% >10% These are sockets, lights or supply to electrical devices, refer note 3 and 4 below Table 3.3 in the Guidance note provide further advice. Note 3, from Guidance Note 3, Table 3.3: Sample sizes for sockets, which are more easily accessible to end users, should be higher than for lighting which are less accessible. Note 4, from Guidance Note 3, Table 3.3: Do not sample samples, if a 10% sample is applied to a sub-main distribution board, then further sampling should not be applied to the final circuit distribution board on these circuits. If a submain has 10 circuits and 1 circuit is inspected and tested, then all the circuits associated with the distribution board supplied by this 1 circuit should be tested. It would be inappropriate to test 1 submain circuit and sample % of the final distribution circuits. An example of a testing specification is provided is in - EDIS Planning and Inspection and Testing Programme.doc available at www.electricalcertificates.co.uk 6 Selecting boards and circuits to test Guidance note 3, 78, states, if a repeat periodic inspection is undertaken using a sampling system, then a different sample, again representative of the installation, must be chose. Therefore previous periodic inspection and test records should be consulted prior to commencement of a sample inspection and test. EDIS Practice EP1 Selecting circuitd for testing provides instructions on how task can be easily achieved. 7 Classifying observations and recommendations Table 3.5 Classification of danger and non-compliance provides guidance classifying the inspection and testing observations and recommendations classification codes. EDIS provides a number of mechanisms to report any non-compliances: 7/15 Save 23/01/2017

1. Where there is a deviation from the guidance note or regulation, the details of the deviation needs to be recorded and retained in the condition report risk assessment. (Refer EP3 - Recording the Risk Assessment in EDIS) 2. Where the value of the earth loop impedance cannot not be measured, a value of LIM should have been entered into the field and an Observation Code of C3 (Improvement recommended) should be associated with the circuit along with a comment stating the reason for the limitation, r efer EP4 - Recording limitations and deviations for tests. 3. Where the limitation is judged to be a danger, due to other considerations an Observation Code FI (Further investigation) should be assigned. The FI code indicates that the assessed risk of not doing the tests is high and further work needs to be undertaken in order to measure the earth loop impedance to assess the risk, refer EP4 - Recording limitations and deviations for tests. 8 How EDIS uses the Maximum Zs values One of the key tests is to ensure that the circuit disconnection time complies with BS7671. This is achieved by measuring the maximum Zs value and comparing it to the Zs for the circuit breaker. EDIS uses the Zs value to determine whether the the last/next test date for the circuit should be updated - a value in the measured Zs field will result in the Last/Next test date for a circuit being updated when the certificate is completed. Care should be taken when completing the certificate that the correct option is selected in order to ensure the distribution board and circuit details are correctly updated, EP5 - Certifying certificates and the resulting update of the distribution board details. 9 EDIS PROCEDURES (E.P.) 9.1 EP1 Selecting circuits for testing in EDIS The easiest way to determine which circuits need to be tested and which circuits were previously tested is to download a Building. This report needs to be requested from the EDIS Building 8/15 Save 23/01/2017

Administrator. It provides a list of the last test/next test dates and provides a quick way to identify circuits that need to be tested. If you do have building administration rights for the estate, ou can download the report: From the main menu select Manage compliance, select create then select the building the figure below provides the guidance. After selecting the building the last text next test dates are displayed an example is shown below: 9/15 Save 23/01/2017

All the reports can be downloaded in Excel. 9.2 EP2-Setting the Default Inspection Frequencies in EDIS The default date is 5 years OR is set by selecting a Board Type. The number of years to the next test date can be controlled by defining the Board Risk Type. The board risk types are setup via the Site Administration / Manage Board Risk Types menu option. The period associated with the board risk type is then used to determine the next test date. So, if a high-risk boards are set to have a 3 year period to the next test, then the next test date will be calculated as follows: Most recent test date + 3 years. Therefore for this example the last test will be equal to the most recent test date and the next test date will be equal to the last test date plus 3 years. The screenshots below show the steps to setting the Board Risk Type. 10/15 Save 23/01/2017

Figure: Selecting the Board Risk Type menu option and updating the Board Risk Types The board risk type can then be selected when editing a board. It is then stored in the Board Type field. 11/15 Save 23/01/2017

Figure: Board Type field is the Boards list and edited via the edit boards forms 12/15 Save 23/01/2017

9.3 EP3 - Recording the Risk Assessment in EDIS The RISK ASSESSMENT associated with the electrical infrastructure can be documented and attached to the EDIS certificate. Entering free text into the Additional Comments form, accessed while editing the certificate, will result in the Risk Assessment being included at the end of the PDF of the certificate. Enter EDIS additional comments field, accessed by editing the certificate EDIS Certificate PDF, includes the text from the Additional Comments field. 9.4 EP4 - Recording limitations and deviations for tests When testing a board and a circuit there are two text fields that can be used to record comments on the cost, difficulty, practicality of carrying out the test. 1. For each board there is a general comment area Details of circuits and/or installed equipment vulnerable to damage when testing. 2. For each circuit there is a remarks text area, 13/15 Save 23/01/2017

The inclusion of the LIM in the Zs value results in two updates in EDIS: 1. The last/next test date for the circuit is updated. 2. The list of Actions Required (Observations and Recommendations) is is updated 9.5 EP5 - Certifying certificates and the resulting update of the distribution board details When a certificate is ready to sign-off the electrician needs to select one of the 4 options listed in the table below. The most commonly used options are 1 and 3, it should be noted that the last/next test date value will only ever be updated if the Zs >0, i.e a Zs measure must be taken. The same rule applies to EICR, New Installation and MW certificates. ` Change applied on completing the certificate Based on the option selected Option Changes to circuit details applied in Boards and Circuits Schedule Changes to Last test / Next test dates Notes 1 If Zs>0 If Zs=LIM If Zs>0 The default case 2 none If ZS>0 or LIM 3 Regardless of Zs If ZS>0 This allows circuit details to be updated regardless of Zs value, however the last test/next test date is not updated of Zs<=0 14/15 Save 23/01/2017

4 In every case In every case This allows all circuit details to be updated regardless of Zs value On signing off the certificate the electrician should select one of the options on the page 5. The screenshot for the options is shown below: 15/15 Save 23/01/2017