SGN Natural Gas Postalised Exit Capacity Charges for the Gas to the West Area. 30th August 2016

Similar documents
Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments.

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013

The future of UK Gas Security. Findings of a survey of major energy users conducted on behalf of:

APPLICATION FOR BOOKMAKERS ON-COURSE BETTING PERMIT

Cost Recovery Annual Report Trawl Rationalization Program

Transportation Charging Statement (Principles and Methodology)

The Euro 2016 Competition In support of

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Natural Gas Emergency Plan Version 4

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Constitution of Ukraine

I HAVE A QUERY. Putting you in touch with the RIGHT people

Network Transmission System Gas Supply Emergency / Gas SCR Overview

HORSERACE BETTING LEVY BOARD FIFTY-FIRST LEVY SCHEME 1st April 2012 to 31st March 2013 FORM OF DECLARATION ( FOD )

The new CNG/LNG Regulatory Framework

Gas Interruptions. customer guide

Financial Services Guide

I HAVE A QUERY FOR GAS TRANSMISSION QUERIES ONLY FOR DOMESTIC GAS QUERIES, PLEASE CONTACT YOUR NETWORK OPERATOR

Withdrawal from an Aegon General Investment Account (GIA) into an existing Aegon ISA

Network Transmission System Gas Supply Emergency / Gas SCR Overview. Jenny Phillips

Submission of Non-PTO Wheeling Data

Gas System Operator Incentives Initial Proposals Consultation 2011/12

Goldfields Gas Pipeline Access Arrangement Comments on Pipeline Capacity Modeling and the Impact of Changing Gas Quality

SGN Natural Gas Connection Policy. Glossary of Terms Introduction Connection Requests Connection Charges...8

Grant for Midwifery Societies: Guidance for Applicants

Assessing Permeation of Gas through Polyethylene Pipe

Connecting Coal Bed Methane to the NTS. Transmission Workstream 1 st July 2010

Natural Gas Connection Policy and Procedures

2018 National Reining Breeders Classic Terms & Conditions

2019 National Reining Breeders Classic Terms & Conditions

The list of governing bodies and the tiers for which they are currently approved by the Home Office is in Appendix M of the Immigration Rules.

University of Bristol Cycle to Work Scheme (Cycle Solutions) Frequently Asked Questions

TITLEIST AND FOOTJOY PGA PROFESSIONAL CHAMPIONSHIP

Deadline Applicant Statistics: January

Q.S.C.A. INC 2011/2012 QLD SSA JUNIOR SEDAN TITLE DRIVER INFORMATION SHEET 3 rd March, 2012

Safety Monitor Requirements. September 2012

Immigration Requirements for the Horseracing Industry in Great Britain

The City of Plymouth ASA Annual Swim Meet 2018

Office of Utilities Regulation

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

Interim Management Statement and Details of change to licensing arrangements for the Betting Exchange in the UK

This sample test provides an indication of the format and structure of the live confirmatory tests that are available.

Rules & Regulations of EBBA and the European Brass Band Championships

M a s t e r A g r e e m e n t

2016 Bali, Indonesia Trip Fast Achievement System (FAS) Tiens Europe Region, Jan 2016

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054

NOTICE OF MOTION MOTION: # X Regulation 2.1 (Definitions)

W E L S H R U G B Y U N I O N LTD

IOWA LOTTERY GAME SPECIFIC RULES LOTTO AMERICA SM

Associated British Ports. Port of Southampton. Competent Harbour Authority & Pilotage Area

Finance Regulations. Capital Football Finance Regulations 4 December 2017

NYU International Hospitality Industry Investment Conference

Terms and Conditions

VENUE HIRE TERMS & CONDITIONS

A Risk-based Audit of the Captive/Privatelyowned Cervid Industry in Michigan

IOWA LOTTERY GAME SPECIFIC RULES MEGA MILLIONS

2017 NRHA Futurity Conditions

Norma Trim, Chief Financial Officer and Commissioner of Corporate Services

Safety Monitor and Firm Gas Monitor Requirements. September 2008

INTERCONNECTION AGREEMENT. (UK-CONTINENT INTERCONNECTOR) Amended and Restated (25 th September 2015) between NATIONAL GRID GAS PLC.

2017 Distance Report. A Review of Driving Distance Introduction

ENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL

Apprentice and conditional jockeys

Market Digest: Aesthetic Lasers and Energy Devices Market 2006 to Americas

POINTS BASED SYSTEM. Application for a Governing Body Endorsement for a Player

MVNO Terms and Conditions

Reserves and Resources Evaluation of the Breagh Gas Field Quad 42 UK North Sea. as at December 31, Executive Summary Report Prepared for:

Charges (Exclusive of VAT) Business Banking Business Banking Plus Business Banking Select

7. Catch Balancing. 7.1 Catch Balancing

Recent Developments in Pressure Management

Charges (Exclusive of VAT) Business Banking Business Banking Plus Business Banking Select

Decision ATCO Gas South. Amendment to Riders A and B with respect to the Town of Stavely. December 22, 2009

Qualification Purpose Statement: 1st4sport Level 3 Certificate in Coaching Judo (QCF)

Sainsbury s 2015 SCHOOL GAMES

Smart Parking Limited ASX:SPZ Full Year Results Presentation. Paul Gillespie, CEO Richard Ludbrook, CFO August 2016

Safety Monitor and Firm Gas Monitor Requirements. September 2007

Please read this document carefully. The terms below apply to use of your Soccer Aid ticket.

European Golf Statistics 2017

This note addresses boats and/or trailers situated within the club s premises (e.g. the boat park).

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

RFU REGULATION 5 FINANCIAL. 5.1 Finance

Southern Lodging Summit Memphis, TN. Presented by Randy Smith Founder Smith Travel Research

Current situation and prospects for copper, nickel, lead and zinc

2016 National Reining Horse Association EUROPEAN FUTURITY * ADDED OPEN * ADDED NON PRO

NSWRHA REINING ENTRY FORM NRHA Affiliate Qualifier

The Golf Related Products Produced by IAR Team Focus Technology Co., Ltd.

North Farm Sousa Street North Lawrence, Ohio

Q.S.C.A. INC 2013/2014 QLD SSA JUNIOR SEDAN TITLE DRIVER INFORMATION SHEET 1 st March 2014

Junior Rally Championship Regulations

16-17 B.I. Hula Hoops National Cup Competition Entry (U18/U20/SWC/SMC)

Our Plan to Restore Manitoba Hydro and Protect Manitobans

Standard Training Agreement

17-18 B.I. Hula Hoops National Cup Competition Entry (U18/U20 National Cups)

Netball NI Workshop Brochure

Water & Sewer Rate Study

Jackpot Rodeo - A Tutorial

England Netball Governing Body Endorsement Requirements

The balance of the charter fee will be paid to Cloud Nine Yacht Charters not less than 28 days before the start of the period of charter.

Transcription:

SGN Natural Gas Postalised Exit Capacity Charges for the Gas to the West Area 30th August 2016

Contents 1 Postalised Exit Capacity Charges... 3 2 Transmission Exit Ratchet... 3 Appendix A - Examples... 4 2

1 Postalised Exit Capacity Charges Gas Suppliers delivering gas to the SGN Natural Gas Ltd. distribution network are treated as utilising capacity in the Scotland to Northern Ireland Pipeline (SNIP),West Transmission Ltd pipeline) and the GNI (UK) transmission pipeline systems. In relation to the utilisation by Gas Suppliers of Exit capacity in these transmission pipeline systems, SGN Natural Gas is responsible for the payment of Postalised Exit capacity charges in accordance with the terms of Transmission Pipeline Operator s Transportation Codes. For the purposes of recovering the Postalised Exit capacity charge from Gas Suppliers, SGN Natural Gas makes a commodity charge on Gas Suppliers on a monthly basis. SGN Natural Gas forecasts that commodity charge at the start of the gas year using the total volume forecast for the SGN Natural Gas Licence Area used to determine the NI Transmission Networks tariffs. This Postalised Exit capacity charge is charged to Gas Suppliers on the basis of their monthly distribution commodity and is subject to an annual reconciliation using actual Distribution volumes. The Postalised Exit capacity charge payable by Gas Suppliers operating in the SGN Natural Gas licensed area for the period 1st October 2016 to 30th September 2017 is as follows: Pence per kwh Pence per therm Postalised Exit Capacity Charge 0.0952 2.7906 2 Transmission Exit Ratchet Under the terms of the PTL Transportation Code, SGN Natural Gas is also required to pay on behalf of Gas Suppliers any Transmission Exit Ratchet which would apply when the total amount of capacity utilised by Gas Suppliers at the relevant Transmission Exit points exceeds the Postalised Exit Capacity held by SGN Natural Gas on their behalf. As per Section B7.4 of the SGN Natural Gas Distribution Network Code, SGN Natural Gas is permitted to recover these costs from Gas Suppliers using the following methodology: Charges associated with the Transmission Exit Ratchet levied on SGN Natural Gas by PTL will be passed to Gas Suppliers in the month in which they are incurred by SGN Natural Gas. The amount owing by each Gas Supplier will be determined on their percentage of total distribution throughput for the number of months for which the penalty associated with the Ratchet Amount applies. 3 8 th 30th August 2016

Appendix A - Examples Detailed below is an example of how the process will apply: Example Assumptions: Ratchet amount = 10,000 kwh Exit Capacity Tariff (as published) = 0.24082 per kwh per day Month Capacity Ratchet occurs = January Number of months Ratchet applicable for = 4 (Oct to Jan) Gas Supplier distribution throughput Oct to Jan = 100,000,000 kwh Proportion of total throughput attributable to each Gas Supplier Oct to Jan: Gas Supplier 1: 55% Gas Supplier 2: 25% Gas Supplier 3: 20% Transmission Exit Ratchet Penalty Calculation: Therefore the Transmission Exit Ratchet penalty payable by SGN Natural Gas to PTL is: Ratchet amount X Transmission Exit Capacity Tariff /12 X Number of months Ratchet Charge payable by SGN Natural Gas = 10,000 X 0.24082/12 X 4 = 802.73 The Transmission Exit Ratchet Charge recoverable by SGN Natural Gas from each Gas Supplier is: Gas Supplier 1: 802.73X 55% = 441.50 Gas Supplier 2: 802.73X 25% = 200.68 Gas Supplier 3: 802.73X 20% = 160.55 Increased Postalised Exit Capacity for remainder of Gas Year: SGN Natural Gas will pay PTL each month for the Transmission Exit Capacity booking increased by the Ratchet Amount for the remaining months of the gas year. Gas Suppliers will continue to pay SGN Natural Gas for the Transmission Exit Capacity using the Postalised Exit Capacity charge as published prior to the start of the Gas Year. Any additional monies paid by SGN Natural Gas for the Transmission Exit Capacity will be recovered from Gas Suppliers as part of the normal annual reconciliation process. 4 8 th 30th August 2016

Recalculation of the Postalised Exit Capacity Charge during the Gas Year If as a result of the application of Transmission Exit Ratchets, SGN Natural Gas determines that the costs associated with the increase in the Postalised Exit Capacity booking would potentially result in a negative impact on its cash flow of greater than twenty five percent (25%) by Gas Year end, then SGN Natural Gas reserves the right at the Gas Year mid-year point to adjust and re-publish the Postalised Exit Capacity tariff it uses to recover costs from Gas Suppliers. SGN Natural Gas will only undertake such a review of the Postalised Exit Capacity tariff following consultation with the Northern Ireland Authority for Utility Regulation. 5 8 th 30th August 2016