Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5

Similar documents
639 Oilcon Mark 6. Oil Discharge Monitoring & Control Systems

INTERNATIONAL MARITIME ORGANIZATION

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1

LPG, LEG, LNG tankers & Chemical and Product tankers

Installation, operating and maintenance Instructions for Seemag bypass level indicator

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Burner Management System DEMO Operating instructions

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

Guidance on the maintenance and inspection of fixed CO 2 fire-extinguishing systems

USER MANUAL. Intelligent Diagnostic Controller IDC24-A IDC24-AF IDC24-AFL IDC24-F IDP24-A * IDP24-AF * IDP24-AFL * IDP24-F * 1/73

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

BUBBLER CONTROL SYSTEM

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

+Port: LOADPORT Voyage No.: 03 Date: 01-Aug-2016 No. Description Remarks [ ]

Quickstart Installation Checklist (Please refer to operation manual for complete installation instructions)

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

In product vessels, LOT is not normally practiced as the recovered oil is usually discharged to shore reception facilities.

PRICED BID -PACKAGE II Page 1 of 19 Vendor Seal and Signature. Set 103. Set 23 pulse transmitter and Non return valve for 1.5" ethanol line.

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

NORMAL OPERATING PROCEDURES Operating Parameter Information

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up)

Instruction Manual Dräger MSI P7 and MSI P7 plus

Technical Specifications of Hydrogen Isotope Handling and Recovery System

ACV-10 Automatic Control Valve

EXPERIMENT 2 LEVEL CONTROL SYSTEM

Installing a Probe. Typical Installation

AFDXXX(X)AC Series Operators Manual Please read this manual thoroughly before attempting to operate your water maker.

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

Inert Air (N2) Systems Manual

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

User Manual 1 P a g e Rev. V1.6-EN 11/08/2014

Transferring and Storage

Automatic Isokinetic Sampler. ST5 Evo

Chapter 2 Preparations for Tank Cleaning Work

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

Unit 24: Applications of Pneumatics and Hydraulics

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

Port: DISPORT Voyage No.:03 Date: 10-Aug-2016 No. Description Remarks [ ]

TR Electronic Pressure Regulator. User s Manual

Part IV: Troubleshooting

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

FRDS GEN II SIMULATOR WORKBOOK

Stormy Phillips BASICS OF LEASE AUTOMATIC CUSTODY TRANSFER (LACT) SYSTEMS

Protec P3000 (XL) Helium Sniffer Leak Detector

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Digital Range

Industrial Pneumatics

DPC-30 DPC-100. Reference Manual

We re Going Global. Vessel Loss Control. Technical Notes #36

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Piped Air SCBA Refilling System Standard

6800 Maintenance Instruction System Flush Procedure

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

1020 Industrial Drive, Orlinda, TN fax

Rejuvenation Instructions

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Duplex Commercial Softeners

Automatic Isokinetic Sampler. ST5 Evo

Accu-Tab PowerBase 3012AT by Axiall Corporation

SECTION P4 SEPARATION SYSTEMS

Product Manual. Cyl-Tel and Tank-Tel Liquid Level Gauges. Designed and Built by: Chart Inc th Street NW New Prague, MN USA (800)

DK46 - DK800 Supplementary instructions

Autocalibration Systems For In Situ Oxygen Analyzers

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range

LOCKOUT SYSTEM AND POLICIES

FAULT CODE TROUBLESHOOTING INDEX

The Discussion of this exercise covers the following points:

MPC-3000 INSTALLATION MANUAL

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

RAM 4021 Operation Manual

Drag racing system HL190 User Manual and installation guide

PART 1 GENERAL..2 Components of the gas chlorination system include, but are not limited to the following:

MACON R70 FOR 1 OR 2 COMPRESSORS

Accu-Tab Systems 2000 P Series by Axiall Corporation

PRAHER PLC-MP AQUASTAR MANAUL 2009

High-Pressure Boiler Inspection Procedures: A Complete Checklist

CCPaSEC. Procedure for the Quality Control Yearly Equipment Check. July 2018 CCPaSEC Quality Control Team

Simrad GD10P Extended On-site Maintenance

HOW WISE TECHNOLOGY WORKS INFICON Protec P3000 sensor powered by Wise Technology, consists of an evacuated gas cell covered by a quartz membrane.

Accu-Tab Systems 1000 Series by Axiall Corporation

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations

Installation Instructions

KJ4000 Operating Instructions & Parts Manual NSN

BLEED DOWN OF THE HIGH GMA PRESSURE

Electro Pneumatic System for Measuring Level in Ballast, Service Cargo Tanks and Vessel Draught

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

Operating instructions Electrical switching facility pco

Commercial Softeners. Installation, Operation & Maintenance Guide. Manual 002.1

Installation Instructions

OC Panel High Limit Aquastat Kit, Manual Reset p/n

NGP-250/500 Nitrogen Generator Quick Start Guide

Key Features & Advantages of JEHA MK IV (5,000 PSI Hydraulic Test Stands)

Transcription:

Page 1 of 5 Vessel Name: Serial number MCU: Serial Number EPU: Serial Number Skid: Mains Supply: V AC @ Hz Software version MCU: Software version EPU: K-factor Cell: K-factor Skid Flowmeter: P/L Maximum capacity of Flowmeter 1: T/hr Maximum Capacity of Flowmeter 2: T/hr Ships volume (DWT): kilo Ton Number of sample points: Introduction / Warning Overboard Valve This procedure will attempt to operate the overboard discharge valve. Permission from the vessel personnel is required too assure that the discharge piping has been blanked and/or manual valves closed and that NO oil is spilled. Slop Tank Running the oil discharge monitor will typically discharge some fresh water into the slop tank. Throughout this procedure, approximately 750 liters of water fresh will be discharged. Permission from the vessel personnel is required to assure that cargo is not contaminated and necessary slop tank space is available. If required, the discharge piping can be disconnected and the water dumped into the bilge instead. Oil This procedure will check the calibration of the optics on fresh water. The oil measuring features will be electrically simulated or manually entered. We will NOT inject the oil at this time. Therefore the discharge of the Oilcon monitor will be clean and OIL FREE. Pump Room This procedure will require that the inspecting engineer be allowed to enter the pump room. Permission is required from the vessel personnel before entry into any enclosed space. Assure that the ventilation is ON and that it is safe to enter.

Page 2 of 5 Physical Inspection Cargo Control Room MCU mounted correctly adequately supported Operating Instructions are available Previous Printout Rolls are stored Communication Cable made out of 1 (one) piece of cable MCU Display s Backlight operates well Global Position System input tested Engine Room EPU (Electro-Pneumatic Unit) and Started Box mounted correctly All cables terminated correctly and placed in correct slots Earth cables installed conform drawings 0806-005-3 and 0806-0005-4 Is oil reservoir of sample pump filled with lubricator Sample pump motor turning freely (by hand) Air lines correctly connected and free of leaks Air supply set to 4 bar minimum Pump Room Skid mounted correctly Piping secured and free of leaks Maximum distance from sample probe to skid less then 26 meters Flow rate of Skid set to 500 liter per minute Fresh water regulator shows 1.5 bar pressure at all times Sample Pump discharge pressure (measured on pressure gauge on the shuttle valve)...mpa Window Wash pump operate properly Detector Cell K-factor on cell tag match the MCU printout DP Transmitter mounted correctly and free of leaks Orifice plate installed correctly

Page 3 of 5 OPERATION Before the test is carried out the following conditions should be met: Control air supply is on Fresh water supply is on Electrical supplies are on EPU and MCU are switched on All manual valve in the system are open Under no circumstances must the sample pump run without liquid. The pump casing must be filled with liquid first otherwise the pump will seize and damage will occur. Prior to testing switch MCU key switch to OFF position, Main switch on the back side of the MCU to OFF and switch off the 24VDC back up supply. Wait for 30 seconds. Make sure the EPU in engine room is switched On. Switch ON the Main switch on the back of the MCU. Switch the key switch to Control (CTRL). Wait 1 minute and write down any alarm which comes up. Acknowledge the alarm by pressing ALARM RESET wait again for one minute and write down any alarms come up. List of alarm which were triggered during the above procedure: Overboard Valve Simulation 1. Switch the MCU to CTRL (Control) position. 2. Press [>] to begin SETUP mode. Press [ENTER] until Total Oil Limit is displayed. Press [CHANGE] and enter Total Oil Limit of 40 L. Press [ENTER] to display Reset Oil Total?. Press [CHANGE] and [CLEAR] to reset the Oil Total to zero. 3. Press [ENTER] until Sips speed input is selected. Change mode to manual and enter 15 knots. 4. Press [ENTER] until Flow rate Input is selected. Change mode to manual and enter 1000T/H. 5. Press [ENTER] until Oil contents input is selected. Change mode to manual and enter 400ppm. 6. Press [ENTER] until end of SETUP mode is reached. 7. Press [ENTER] and system will go to IDLE mode (Flushing cycle will be skipped). 8. Press [>] to start the SAMPLE MODE. 9. After approximately 2 minutes, the command to open the overboard valve and to shut the slop tank valve will be given. Confirm that the display indicate it by the change of COM and POS from C to O and page containing following is produced by the printer: a. DISCH RATE 26 L/NM b. Overboard Valve COMMAND OPEN c. Overboard Valve POSITION OPEN 10. Check that the valves have in fact operated. 11. Press [STOP MONITORING]. The system will return to IDLE mode and the signal to close overboard valve and open the slop tank valve will be given. On the display of the MCU this is indicated by change of COM/POS from O to C 12. Press [CHANGE] to enter extra setup mode. 13. Press [ENTER] until Flow rate Input is selected. Change flow rate to 2000T/H.

Page 4 of 5 14. Wait till system is back in IDLE mode (15 seconds after last keyboard action) 15. Press [>] to start SAMPLE MODE. The MCU should generate DISCHARGE RATIO alarm showed on display as DISCH. FLT L/NM. The overboard discharge valve will remain closed (wait at least 3 minutes). System operated as described 16. Press [CHANGE] to enter extra setup mode. 17. Press [ENTER] until Flow rate Input is selected. Change flow rate to 1000T/H. 18. Wait till system is back in SAMPLE MODE mode (15 seconds after last keyboard action). 19. After approximately 2 minutes, the signal to open the overboard valve and to shut the slop tank valve will be given. Confirm MCU indicates as follows: a. DISCH RATE 26 L/NM b. Overboard Valve COMMAND OPEN c. Overboard Valve POSITION OPEN d. TOT OIL will increase till 40 L e. After 40L reached MCU generate TOT.OIL FLT alarm f. Overboard Discharge Valve will close 20. Verify that the valves have in fact operated 21. Press [STOP MONITORING] to select IDLE mode. 22. Press [STOP MONITORING] to select SHUT DOWN mode. Wait until system returns to the STANDBY mode. Zero Check 1. Switch all the input to AUTO: a. Press [>] to select set up mode b. Press [ENTER] until Ship s speed input is selected. Change to auto mode c. Press [ENTER] until Flow rate input is selected. Change to auto mode d. Press [ENTER] until Oil content input is selected. Change to auto mode e. Press [ENTER] until end of set up mode is reached. 2. Press [ENTER] to start FLUSH mode 3. Wait until system complete the calibration cycle and switch to IDLE mode a. The calibration cycle ended without alarm b. List any alarm which came up Read Oil 1. Start the cargo pump (the MCU will divert the flow into the slop tank). 2. Confirm that water circulate in discharge pipes by checking the flow rate indication on the MCU. 3. With the MCU in IDLE mode, press [>] to start the SAMPLE MODE a. Verify that the PPM indication on the MCU display is changing b. Verify that Flow Rate indication on the MCU changing 4. Press [STOP MONITORING] and select the next sample valve (if any). 5. Press [>] to start sampling a. Verify that the correct sample point is indicated on the MCU b. Verify that the correct sample probe is selected

Page 5 of 5 c. Verify that the PPM indication on MCU is changing d. Verify that the Flow Rate indication is changing 6. Press [STOP MONITORING] to select IDLE mode 7. Repeat steps 4 and 5 for each sample point a. Sample point # ; Results satisfactory b. Sample point # ; Results satisfactory c. Sample point # ; Results satisfactory d. Sample point # ; Results satisfactory Overall Results Ballast Monitor portion of ODME working satisfactory? Valve Control portion of ODME working satisfactory? Crew Training Is the crew familiar with the system operation? Is the crew familiar with the valve location? System Recommendations 1. Indicate Items that should be done by Service Engineer in near future: 2. Indicate items that should be done by vessel s crew in near future: Date: - - Service Engineer Ship s Officer signature & stamp: