Cyclepoint: a NedRailways concept. Leeds Cyclepoint. A New Way of Continuing the Journey

Similar documents
Part 3: Active travel and public transport planning in new housing developments

Our Cycle Promise. northernrailway.co.uk. Produced in partnership with Sustrans. July 2017

Abellio s sustainable door-to-door Approach

Bristol City Council has produced a draft Bristol Transport Strategy document.

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

Abellio s Cycle Strategy

University of Leeds Travel Plan

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

Leeds CyclePoint YOUR GUIDE TO. Welcome to CyclePoint. CyclePoint offers five services in one unique environment

WEST YORKSHIRE LTP CYCLE PROSPECTUS

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

London Cycle Network Annual Report 2000

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

GETTING WHERE WE WANT TO BE

ABERDEEN: CITY OF THE FUTURE

Final Plan 20 December 2016

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

Local Sustainable Transport Fund

Our journey a 20 year Transport Manifesto for the North East

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Section 9. Implementation

FASTER. EASIER. COOLER.

LEEDS BECKETT UNIVERSITY. Transport Strategy

Launceston's Transport Futures. Greater travel options for the people of Launceston

2. Context. Existing framework. The context. The challenge. Transport Strategy

interchange audit ABERDEEN Introduction Purpose of the Interchange Audit Interchange Audit Linking cycling with public transport

ENFIELD TOWN THE REVISED DESIGN

The most innovative bike hire scheme in the UK

9. Parking Supporting Statement

Nottingham Cycle City Frequently Asked Questions

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Cambridgeshire Local Transport Plan Policies and Strategy

National Transport Awards Cambridge Park & Ride

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

DOE Climate Change Proposals

COMBINING THE POWER OF BICYCLE USE AND PUBLIC TRANSPORT: IMPLEMENTING THE BIKE-TRAIN SYSTEM IN THE NEW ZEALAND CONTEXT

Transportation Master Plan Advisory Task Force

Living Streets response to the Draft London Plan

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

Appendix N(b): Portishead Station Outline Travel Plan

Caltrain Bicycle Parking Management Plan

The Role of Bike Centres in the Urban Transportation Environment. Adrian Witte, M.Sc., PTP, Bunt & Associates, Vancouver, BC.

GD 0043/18 ACTIVE TRAVEL STRATEGY

CPISRA RACERUNNING DEVELOPMENT PLAN

AGENDA. Stakeholder Workshop

NS Fiets BV Management of bicycle parking at Dutch railway stations

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Cycling Action Plan for Nottingham. Towards creating a more cycle friendly city October 2012

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Active Travel Strategy Dumfries and Galloway

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

Scotland s consultancy for sustainable transport.

CHAPTER 7.0 IMPLEMENTATION

Public Bicycle Sharing Scheme

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Bike share success factors

Nottingham, the great cycle city

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

The definition of system size This makes it possible to subsequently define the appropriate number of bicycles to be used in the system.

A bicycle map depicts the local bicycle lane network. It also gives recommendations for routes,

Strategic Plan for Sevens Rugby. September 2006

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES

Irish Hockey Four Year Strategic Plan

Easton Safer Streets - Final Project Report BRISTOL

York Scarborough Bridge Economic Appraisal Update Technical Note

Bike Libraries. Getting involved. More people cycling more often.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

The seamless journey The seamless journey: Public transport links with walking and cycling

BIKEPLUS Public Bike Share Users Survey Results 2017

Report to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

EUROPEAN TRANSPORT CONFERENCE 2006 ROAD SAFETY IN LONDON PAST SUCCESSES AND FUTURE INNOVATIONS

Berkeley Strategic Transportation Plan A-76

Case study Dublin (IE)

Central London Bus Services Review

1. UK policy context

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

North West Non-Technical Summary of the Transport Assessment September 2011

TRANSPORT AND MOVEMENT

Douglas Land Use and Transportation Study

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Capacity of transport infrastructure networks

Space for Cycling. A guide for decision makers

PLACE CONCEPT! DESIGNS. Simplified crossroads junction to take traffic away from the heart of Picardy Place

A Strategy for Increasing Walking and Cycling

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015

Executive Summary Leadership Cincinnati Class 34. Project: Cinci Bikes

association of TRain operating ComPanieS CyCle-Rail ToolkiT

Transcription:

Cyclepoint: a NedRailways concept Leeds Cyclepoint A New Way of Continuing the Journey

Foreword Cycling plays an important role in supporting sustainable transport and facilitating efficient door to door journeys. In the Netherlands we have long understood the transport benefits of a fully integrated cycle system, as well as the personal benefits to be derived from improved health and even the simple pleasure that cycling brings. It is important now that the rail industry prepares to play its role in serving this growing demand. In keeping with our commitment to innovation and sharing best practice, NedRailways has been exploring opportunities to improve cycle facilities at the cycle/rail interface in UK stations, based on Dutch experience. It is exciting to see that the popularity of cycling in the UK has now reached a tipping point. The Department for Transport has increased its cycle budget by 500%, and TfL has announced 10 million of further investment on 2007/08 levels to accommodate growth of over 90% in the capital since 2000. Cyclepoint is based on a proven Dutch concept which combines manned and secure cycle storage with retail, repair and hire facilities at major stations. I m delighted that the first of these will be piloted at Leeds station by Northern Rail, and I hope this will pave the way for further Cyclepoints at major stations across the UK. Anton Valk Chief Executive, NedRailways Since the Northern Franchise began in 2004, two key areas of focus have been to ensure that we Make it easier to use Northern services through improved access to and from the network Offer the most environmentally friendly, sustainable transport option possible for the UK based on examples of best practice from the cycling nation of the Netherlands. One of the concepts, Cyclepoint, provides a comprehensive facility for cycle users at major destination stations. The time is right to apply this same concept in the UK and this document outlines Northern Rail s plans for its first Cyclepoint which will be piloted at Leeds station. It has long been clear to us that by developing and implementing a comprehensive cycling strategy we could go some way to addressing both these objectives. Our award - winning cycle strategy was extremely well received, and through our Cycle Users Forum we continue to make excellent progress in meeting the needs of cyclists, both at our stations and on our trains. In keeping with this approach we have been working with NedRailways to explore innovative cycle concepts Cyclepoint will not only provide passengers with a new option to continue their journey, but will also give Leeds residents and commuters a high-quality cycle rental and retail facility. The scheme complements perfectly local and national government policies to increase cycle usage. This document reports on progress with the pilot scheme and outlines the benefits that Cyclepoint will bring to our customers and the Leeds City region as a whole. Heidi Mottram Managing Director, Northern

Introduction Northern Rail is committed to delivering a sustainable, integrated means of transport across the whole of the North of England. We work closely with our key stakeholders to ensure that our passengers are able to start and complete their journeys in ways which are right for them, right for local communities and right for the environment. We want to connect people to opportunities by the most sustainable means, and in many instances this is best delivered through integration of our services with facilities for cycling. Northern Rail is well placed to deliver such facilities as we are part-owned by NedRailways, a wholly-owned subsidiary of Dutch Railways (NS). An astonishing 39% of all rail passengers in The Netherlands arrive at their local station by cycle with about 10% leaving their destination station by the same mode. We have looked carefully at the Dutch approach to cycle provision at stations, and this has enabled us to develop our strategies in ways that are tried and tested, but still innovative within the UK rail environment. This new approach has been welcomed by passengers and stakeholders alike in October 2007 we won the Train Operator of the Year title at the National Cycle-Rail Awards....we want to connect people to opportunities by the most sustainable means, and in many instances this is best delivered through integration of our services with facilities for cycling. We continue to develop our cycling strategy through the Northern Rail Cycle Users Forum, which brings together Sustrans, the sustainable transport charity, the Cyclists Touring Club, local cycling clubs, Passenger Transport Executives and Local Authorities. However, we are now developing an established NS concept based on offering cycling opportunities at both origin and destination stations, and the first example of this will be the development of a NedRailways Cyclepoint at Leeds Station. A New Way of Continuing the Journey 3

What is a Cyclepoint? BICYCLE SHARE (in all journeys) NATIONAL FIGURE: Approx (recent years) The Cyclepoint concept is well established in the Netherlands. Although general usage of cycles is higher than in Britain, Dutch Railways knew that an attractive, integrated cycle solution would be required at stations if their passengers were to fully embrace the concept of continuing their journey on a cycle. Their Cyclepoints, which offer secure, staffed storage, rental, repair and sales, met an existing customer need, and have proven to be extremely popular with passengers. The Netherlands 27% Denmark 19% Germany 10% Austria 9% Switzerland 9% Belgium 8% Sweden 7% Italy 5% France 5% Netherland Cyclepoints Top Left: double layer racks Top Right: Dordrecht Middle Left: Leeuwarden Middle Right: Schiedam Bottom Left: Zutphen Ireland 3% Czech Republic 3% Great Britain 2% 4 Leeds Cyclepoint

The Netherlands Cyclepoint experience Applied to 40 stations 500 to 3,000 cycles per station Secure smartcard access and comprehensive CCTV coverage Use of double layer cycle racks (more space-efficient) Staffed 06:00 20:00 weekdays / 08:00 18:00 weekends Unstaffed hours access via automated door and CCTV Shop offers: Cycle rental Cycle repair (bring it in the morning, take home in the evening) Cycle and accessories sales Information and demonstration area The Leeds Cyclepoint Northern Rail s established policy of carrying cycles on our services free of charge, without the need for reservations, has proven to be extremely popular. However, we have seen demand for our services grow by 31% since the start of the franchise, and whilst we continue to work with the Department for Transport to deliver future capacity to the Northern network, it is becoming increasingly difficult to accommodate passengers cycles on our trains. Providing secure cycling facilities at origin stations is part of the solution, but we want to offer sustainable options at both the start and end of the journey. The Dutch solution of locating Cyclepoints at major hub stations to facilitate onward travel is equally valid in the UK. Usage of bicycles is lower in Britain than most European Countries, but it is growing significantly. Cyclepoint in Leeds will form a key part of Northern s contribution to increasing usage of cycles. In doing so we will play our part in the delivery of sustainable, affordable and healthy travel in the North of England. A New Way of Continuing the Journey 5

Benefits of the Cyclepoint concept We believe that the Cyclepoint concept is the right approach at the right time. It fully reflects the following considerations: Increased customer consideration of environmental and health issues Increasing congestion problems in and around our city centres Wider government cycling policies Increasing demand / loadings on all Northern rail services Complementary to Northern s wider cycling policy Supports further development of Station Travel Plans The growing incidence of cycle theft from stations We see the Cyclepoint concept working particularly well at larger city centre stations, such as Leeds, Manchester Victoria, Bradford Interchange, Harrogate and Liverpool Lime Street. Why Leeds? Leeds is an ideal first location for the application of the Cyclepoint concept for the following reasons: Very high footfall Leeds is Northern s busiest station, with 110,000 passengers passing through the station on an average weekday. Central location The Cyclepoint at Leeds station will also be attractive to non-rail users, for both retailing and rental. Strong local stakeholder support It is critical that the Cyclepoint is part of a wider local strategy of encouraging the use of cycles. The location and scope of the plan is fully consistent with Local Transport Plan and Leeds station Travel Plan objectives. Existing demand More than 100 cyclists already use Leeds station despite the limited facilities currently offered. These form our initial existing market, and will generate additional usage through word of mouth alone. Use of cycles in Leeds city centre has doubled over the past decade, and continues to increase. Wider regional considerations Complementary satellite cycle points at other nearby Northern stations (such as Bradford, Harrogate and Skipton) could be created to offer an integrated start and finish solution for passengers. Leeds development as a cycling city Plans are in place to introduce radial cycling routes from the suburbs into the city centre by 2011, all aimed at people 3 to 4 miles out of the city centre. The West and South bound routes will touch the station area. The right demographic Leeds is a vibrant, modern city, and a modern cycling solution will be attractive to many of its residents and commuters. For example, Leeds University has over 30,000 students, many of whom already choose to travel by rail and cycle. Further integrating these modes of transport will encourage a greater uptake of public transport by students. Ultimately, Cyclepoint will support a widening of catchments for education, business and retailing. No similar facilities Currently no comparable hire, sales and repairs facilities exist in the city centre. Indeed, there is currently no cycle hire facility of any kind in Leeds at all, and no sales/repair shop within 1.5 miles of the station. Potential smartcard integration As the Cyclepoint concept includes the use of smartcards to access the facilities offered, a real potential exists to integrate this with any future ITSO smartcard schemes delivered on rail or bus services into Leeds station, offering full integration of all aspects of a passenger s journey into the city centre. Station travel plan Leeds station has been selected as a pilot for the Department for Transport s station travel planning intiative. This is aimed at improving station access and egress through stronger integration with other transport modes. 6 Leeds Cyclepoint

Our plans for the Leeds Cyclepoint We are still finalising the implementation plan for Leeds Cyclepoint, but we believe that the scheme will meet the following key objectives: Affordable Accessible isible Affordabl Accessible Visible Secure Fully Integrated ully Integrated Proposed location of Leeds Cyclepoint The location of the Cyclepoint will be at the front of the station, and passengers leaving the station will therefore be offered a clear choice of modes for onward travel, including bus, taxi and cycle rental. It is envisaged that the development will integrate fully with Network Rail s plans to enhance the taxi rank facilities in the area, and the overall scheme will deliver a marked improvement to the appearance of this gateway to the city. Detailed feasibility work is underway to confirm the viability of the location, but alternative nearby locations within the overall station footprint are available should they be needed. A New Way of Continuing the Journey 7

Commercial Considerations A Partnership Approach A Cyclepoint at Leeds Station cannot be delivered by Northern Rail alone. It requires close partnership working with a number of key stakeholders, such as: Network Rail: As landlord of Leeds Station, Network Rail will play a fundamental role in the delivery of the scheme. They will ensure that the scheme is delivered in a manner that is fully consistent with their own plans to develop the exterior of Leeds station. Leeds City Council: The Cyclepoint will provide a central hub for all cyclists within Leeds. The proposition complements the City Council plans to further encourage the use of cycles in the city centre. The Department for Transport: The Cyclepoint fully reflects the Department s aspirations for further integration of all forms of public transport, and supports the wish to encourage greater use of cycles in order to capture the significant environmental and public health benefits. The Department will ensure that this scheme benefits Leeds beyond the end of the current Northern Franchise. CTC, the National Cyclists Association: The Cyclepoint must fully meet the needs of cyclists, and the CTC will be fully engaged to ensure that this is the case. West Yorkshire PTE: Metro s vision is to develop a high quality integrated public transport system that is reliable, easy to understand and use, accessible and attractive to all, affordable, safe, secure and efficient. Leeds station is at the centre of this integrated network, and the Cyclepoint concept offers a high quality complementary addition to the existing public transport opportunities. The Cyclepoint at Leeds will be delivered through close working will all the above groups, and this partnership is already in place and working to deliver the scheme by early 2010. 8 Leeds Cyclepoint

Scalability and Future Revenues Northern Rail is passionate about delivering sustainable, integrated transport across the North of England. Our aspiration to deliver Cyclepoints is primarily driven by a real customer and environmental need. So, whilst this concept has not been developed specifically to generate revenue, it is crucial that Cyclepoints are commercially sustainable beyond the end of the Northern Franchise. In order to ensure this, the initial facility at Leeds will be scaleable, with storage increasing as demand increases. A detailed financial and demand appraisal indicates that, by 2012, operating costs of the Cyclepoint will be covered by revenue generated. This will ensure a secure future for the facility. It is envisaged that the Cyclepoint will be declared a primary franchise asset to reflect this. Investments at the delivery stage of the concept include the following: Cycle Shed, including storage and racks Cycle shop, including stock and rental cycles approx 250k* approx 150k* Ongoing costs will include: Staff for retailing / storage / repairs Maintenance and repair costs Marketing initiatives *robust site specific costs will be available in May 2009 A New Way of Continuing the Journey 9

Summary the Benefits of Leeds Cyclepoint Leeds Cyclepoint will offer a completely new way for passengers to continue their journey from Leeds station. It will not only offer an integrated cycling solution for rail users, but also bus passengers or indeed anybody within the city centre. The Cyclepoint will enable Northern and other Train Operating Companies to offer transport to cyclists in a way that reflects growing demand for rail services. The Cyclepoint will be an attractive addition to the front of Leeds station, brightening this key gateway to the city. The Cyclepoint will offer a modern one stop shop for cyclists, incorporating modern technologies such as smartcards. The Cyclepoint will support Northern s wider, award-winning cycling strategy, and thereby encourage greater use of cycles within the North of England. The Cyclepoint concept is fully consistent with Local Transport Plan objectives. The Leeds Cyclepoint is the first of a planned series of similar initiatives, and can be replicated at a number of other locations. All these benefits and more support Northern s view that the time is right to apply the Cyclepoint concept within the UK. We will now work together with all relevant stakeholders to deliver this important initiative. If you want more copies of this document, in paper or electronic format, contact Stephen Bond Head of Business Development Northern Rail 6th Floor Northern House 9 Rougier Street York YO1 6HZ stephen.bond@northernrail.org 10 Leeds Cyclepoint

Photomontage View from station entrance Ground Floor Plan First Floor Plan