ADA Self Evaluation and Transition Plan for Public Rights-of-Way

Similar documents
ADA Retrofits Triggered by Paving: What, When, and Why

Keeping good roads good

Field guide for Accessible Public Rights-of-Way Edition

Paul Vraney Bureau of Project Development 02/11/2016

Accessible Sidewalk Requirements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Curb Ramp Installation Matrix

12A Accessible Sidewalk Requirements. 12A Protruding Objects

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

2018 ROAD MAINTENANCE PROGRAM

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

City Sidewalk Repair and Replacement Program

Why We do Preventive Maintenance

Lake Waterford Community Association Meeting. November 15, 2016

12A Accessible Sidewalk Requirements

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

disabilities to gain access to the center islands in streets. Otherwise, these individuals are forced to

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

City of Davis Pavement Management Program

Michael Parmer, Management Aide, City Manager's Office

MNDOT PAVEMENT DESIGN MANUAL

ADA TRANSITION PLAN 2013

ADA TRANSITION PLAN. For

ODOT Pedestrian and Bicycle Program

ADA TRANSITION PLAN. TOWN OF DeMOTTE

DPW Order No:

PEDESTRIAN CROSSING TREATMENTS

Citywide Sidewalk and Crosswalk Programs

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Pavement Management Program

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

Americans with Disabilities Act and Curb Ramps

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Complete Streets and the Americans with Disabilities Act (ADA) Jennifer E. Ruley, PE Active Transportation Engineer Louisiana Public Health Institute

Town of Wakarusa. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

AMATS Complete Streets Policy

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

ADA & Public Rights of Way

Marshall County. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

ACTIVE TRANSPORTATION

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

The City of Miramar. ADA Self-Evaluation & Transition Plan. August 28, Prepared by: 600 N. Pine Island Road Suite Plantation, FL 33324

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Chapter 4: Funding and Implementation

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

5. RUNNINGWAY GUIDELINES

Town of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

APPENDIX L: COST ESTIMATING TOOLS

2017 Temporary traffic control guidelines for pedestrians. v.2

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

Evolving Roadway Design Policies for Walking and Bicycling

Non-Motorized Transportation 7-1

CITY OF SAN JOSÉ, CALIFORNIA DETAILED ADA TRANSITION PLAN UPDATE FOR SIDEWALKS REVISED DRAFT - MARCH 20, 2008

ADA PRESENTATION (CURB RAMPS)

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Complete Streets Funding Program Project Prioritization Plan

IMPLEMENTATION STRATEGIES

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

The 2012 AASHTO Bike Guide: An Overview

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Annual Listing of Obligated MPO Projects

DISTRICT BICYCLE PROGRAM

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Designing Pedestrian Facilities for Accessibility

Town of Roseland. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Safe Routes to School Action Plan Aberdeen, Idaho

Township of Springwater

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

900 BICYCLE FACILITIES Traffic Engineering Manual

First Annual Colorado Chapter Conference Englewood, CO. Accessible Pedestrian Facilities in the

Building Great Neighbourhoods STRATHEARN

Town of Osceola. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Living Streets Policy

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

VILLAGE OF DOWNERS GROVE ADA TRANSITION PLAN

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CITY MANUALS AND STANDARDS REVIEW

Chapter 3 DESIGN SPECIFICATIONS

INDOT Complete Streets Guideline & Policy

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

City of Saline. Complete Streets Ordinance

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Appendix 3 Roadway and Bike/Ped Design Standards

Steps to Conducting a Complete Streets Assessment

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance

VIII. Project Prioritization & Implementation

ith t Neva Cia Department of Transportation External Civil Rights ADA/504 Section

Improving intersections for people that walk in Minneapolis

Transcription:

ADA Self Evaluation and Transition Plan for Public Rights-of-Way 2014 NWPMA Conference Akmal Siddiqui WSDOT Local Programs 310 Maple Park Avenue SE Olympia, WA 98504 Phone: 360-705-7539 siddiqa@wsdot.wa.gov http://www.wsdot.wa.gov/localprograms/ Traffic/ada.htm October 2014

Objectives Introduce Chapter 29 of the Local Agency Guidelines (LAG) Manual. Provide an understanding of the legal framework. Describe minimum requirements/components of a self-evaluation, a transition plan, and an accessible pedestrian signal (APS) policy. 2

ADA Laws Required of all public entities Section 504 - Rehabilitation Act of 1973 USDOT Implementing Regulations (49 CFR 27) Americans w/disabilities Act of 1990 DOJ Implementing Regulations (28 CFR 35) 3

WSDOT Local Agency Guidelines (LAG) Manual Chapter 29 Provides a Summary of the Laws For projects with federal funding Assurances by recipients & subrecipients Designation of ADA Coordinator Public notice of policy Grievance/complaint procedures Self-evaluation Policy for accessible pedestrian signals (APS) Transition plans 4

Self-Evaluation Required for all public entities Scope 28 CFR 35.105 Public entity shall evaluate policies, programs, services & identify barriers. Public entity shall provide opportunity for interested persons/groups to be engaged in process. Public entity with 50 or more employees shall ensure that the self-evaluation and process used is maintained/available to the public (website). 5

Transition Plan Required for all public entities with 50 or more employees. Purpose & Scope - 28 CFR 35.150(d) Set forth steps necessary to complete structural modifications to existing facilities identified through self-evaluation (those areas not covered in a previously developed plan). Becomes a short-range planning tool ( action plan) for completing modifications. 6

Self-Evaluation and Transition Plan Elements Self-Evaluation 28 CFR 35.105 1. Inventory Identify barriers, rank, and prioritization. 2. ADA Coordinator ADA advocacy groups & the public 3. Grievance / Complaint Procedures Transition Plan 28 CFR 35.150 (d)(3) 1. Corrective measures Remove barriers 2. Implementation Schedule Remove barriers 3. ADA Coordinator ADA Advocacy group & the public 4. APS Policy Reasonable and consistent 7

Review of Requirements New construction Alterations Maintenance 8

Self-Evaluation What to Include In conjunction with Pedestrian Master Plans Barriers within public right-of-way Curbs Sidewalks Pedestrian Crossings Pedestrian Signals Shared Use Trails Parking Lots Bus Stops 9

What are the Barriers? Curbs/Slopes 10

Curb Ramp Must Be Present Curb Ramp Must Be Present Project Limit Paving Limit Curb Ramp Construction/Reconstruction Curb Ramp Construction/Reconstruction Revised Code of Washington RCW 35.68.075(3) 11

What are the Barriers? 12

What are the Barriers? Communication Devices 13

What are the Barriers? Construction Work Zones 14

Self-Evaluation Tools Level (laser, SMART 24 best for sidewalks 48 or less; 48 for larger sidewalks) Measuring tape; GIS equipment WSDOT s 2012 Field Guide for Accessible Public Rights of Way Checklists 15

Transition Plan - Example 16

APS Policy Reasonable & consistent policy for APS stems from general prohibition against discrimination: Title II No qualified individual with a disability shall, on the basis of disability, be excluded from participation in or be denied the benefits of the services, programs, or activities of a public entity, or be subjected to discrimination by any public entity. 17

Reasonable & Consistent Policy for APS Policy should consist of: - APS as individual accommodation upon request - APS in existing locations (transition plan) - APS in new construction/alterations 18

Reasonable & Consistent Policy for APS Maryland SHA New construction/alterations APS to be installed at all signals with pedestrian indications. Signals without pedestrian indications will be designed for future installation of APS. Existing signals with pedestrian indications where no work is planned Consider and address individuals requests for APS. Install APS on priority ranking basis (transition plan). APS committee to establish ranking. 19

July 8 th, 2013 Regardless of whether there is curb-to-curb resurfacing of the roadway, resurfacing a crosswalk (marked or unmarked) triggers curb ramps at that crosswalk 20

The following surface treatments ARE Alterations that trigger curb ramps. o Reconstruction including Full depth reclamation Cold in-place recycling o Rehabilitation including Full slab replacement Slab jacking Widening o HMA resurfacing including - Overlay Mill and Fill Thin lift overlays o Open Graded Friction Course o Microsurfacing o Cape seal (i.e., a chip seal in combination with either a slurry seal or microsurfacing applied over the top) o In-place asphalt recycling 21

The following surface treatments ARE NOT Alterations and are considered MAINTENANCE of the roadway surfaceo Crack sealing o Surface sealing with liquid asphalt o Chip seal (by itself {i.e., not a cape seal}) o Slurry seal (by itself {i.e., not a cape seal}) o Fog seal o Scrub sealing o Joint crack seals (routing prior to crack seal) o Joint repairs on concrete panels o Dowel bar retrofits o Spot high friction treatments o Diamond grinding o Pavement patching (either full or partial depth) 22

Bicycle & Pedestrian Funding Opportunities with FTA and FHWA Funds http://www.fhwa.dot.gov/environment/bicycle_pedestrian/funding/ funding_opportunities.cfm 23

Resources 28 CFR Part 35 http://www.law.cornell.edu/cfr/text/28/part-35 49 CFR Part 27 http://www.law.cornell.edu/cfr/text/49/part-27 LAG Manual Chapter 29 http://www.wsdot.wa.gov/publications/manuals/fulltext/m36-63/lag29.pdf NCHRP Report 20-7 (232) http://www.wsdot.wa.gov/nr/rdonlyres/d4dd8837-adc4-486e- AB93-BCA9719E15EB/0/ADATransitionPlansReportMay2009.pdf FHWA Companion Guide to Self-Evaluation Video http://www.fhwa.dot.gov/federalaidessentials/companionresources/33self%20evaluation.pdf FHWA Companion Guide to Transition Plan Video http://www.fhwa.dot.gov/federalaidessentials/companionresources/32transitionplans.pdf 24

Resources (continued) DOJ-FHWA Joint Technical Assistance on Alterations http://www.fhwa.dot.gov/civilrights/programs/doj_fhwa_ta.cfm Public Right-of-Way Accessibility Guidelines http://www.access-board.gov/guidelines-and-standards/streetssidewalks/public-rights-of-way/proposed-rights-of-way-guidelines Planning & Design Resources for LPAs http://www.wsdot.wa.gov/localprograms/planning/ada.htm Rancho Cordova, CA ADA Transition Plan http://www.cityofranchocordova.org/index.aspx?page=133 City of Zillah, WA ADA Self-Evaluation/Transition Plan http://www.cityofzillah.us/ada%20self- Evaluation%20and%20Transition%20Plan%2012-2-2013.pdf City of Bellevue, WA Self-Evaluation Report http://www.ci.bellevue.wa.us/accessibility-reports.htm 25

The End Questions Contact Information for Akmal Siddiqui: Phone: 360-705-7539 siddiqa@wsdot.wa.gov http://www.wsdot.wa.gov/localprograms/traffic/ada.htm 26