Quiet Zones: Silencing Train Horns at Railroad Crossings

Similar documents
Salem City Council November 9, 2009

Regional Transportation Committee (RTC) 10-Year Project Milestone Policy. Transportation and Trinity River Project Committee October 26, 2015

Is Train Horn Noise a Problem in your Town? By: John P. Redden, P.E., senior railroad engineer, Hanson Professional Services Inc.

Is Train Horn Noise a Problem in your Town?

Will Kempton, Chief Executive Officer. Update on Proposed Implementation of a Wayside Horn System Along the San Clemente Beach Trail

Ann Arbor, Michigan Quiet Zone Assessment

Rapid City Quiet Zone Assessment

8 th Annual Spring Transportation. April 9, 2010

Cotton Belt Corridor PE/EIS

Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

TECHNICAL COMMITTEE: Railroad and Light Rail Transit and Signals Technical Committees

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

Designing Safety into Highway-Rail Grade Crossing Projects

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

Wyoming Quiet Zone Study

TECHNICAL COMMITTEE: Railroad and Light Rail Transit and Signals Technical Committees

Designing with the Railroad

MEMORANDUM. Background

Proposed Project I 35 from Denton to Cooke County Line

Train Horn Noise Mitigation

ON-SITE ENGINEERING FIELD REPORT Part 2. All Aboard Florida

5. RUNNINGWAY GUIDELINES

Hennepin County Transportation Department

3.9 Recreational Trails and Natural Areas

ORANGE COUNTY GRAND JURY

GRANDFORKS MILSPURFEASIBILITYSTUDY. GrandForksandEastGrandForksMPO. FINALReport. August2010

Complete Streets Initiative Update

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

Everyone is a Pedestrian

Any time is train time

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Non-Motorized Transportation 7-1

Golden s Plan. For the Highway 6 & 93 Corridor

Dallas Trail Safety Initiatives. Quality of Life Committee February 14, 2011 Park and Recreation Department

St. Francis Drive through the City of Santa Fe Corridor Study

City Council Work Session

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Part 8. TRAFFIC CONTROL FOR RAILROAD AND LIGHT RAIL TRANSIT GRADE CROSSINGS

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Construction Update. Local Officials Briefing March 2016

DART Green Line. Northwest Corridor Expansion. Bachman/Northwest Dallas Update. May 10, Bachman Recreation Center

US 69 RELIEF ROUTE STUDY

STUDY PROCESS & SCHEDULE

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Chapter 3: Multi-Modal Circulation and Streetscapes

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

PART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS

Briefing on the Cotton Belt Corridor

City of Moorhead Committee of the Whole Meeting

City of Vestavia Hills Traffic Calming Policy for Residential Streets

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Project Description Form 6V

3.0 Future Conditions

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

Traffic Management Guidelines for Structure Rehabilitation Projects

APPENDIX E GRADE CROSSING LOCATIONS

TEXAS TRAFFIC SAFETY TASK FORCE. Jeff Moseley Texas Transportation Commission

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Transportation Impacts: Toronto York Spadina Subway Extension

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad.

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Washington County, Oregon

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

Engineering - Bicycle and Pedestrian

This Manual Part recommends functional/operating guidelines for control of automatic grade crossing warning systems. Draft

Public Hearing Tarrant County. October 11 th, 2012

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

S 0659 S T A T E O F R H O D E I S L A N D

COMMITTEE RECOMMENDATIONS. That Council approve:

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

Appendix B Transportation Report

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

ENERGY SECTOR COORDINATION

Chapter 5 Future Transportation

(This page left intentionally blank)

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number


GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

City of Crystal, Minnesota Quiet Zone Notice of Intent

2. TRANSPORTATION ELEMENT.

Transcription:

Quiet Zones: Silencing Train Horns at Railroad Crossings Council Transportation and Environment Committee Prepared by Public Works and Transportation Transportation Programs - Planning January 12, 2009

Purpose of Briefing Transportation and Environment Committee originally briefed on RR Quiet Zones on February 26, 2007 Overview of the Federal Railroad Administration (FRA) process for establishing railroad quiet zones Status report on Quiet Zone studies 2

What is the Train Horn Rule? The Federal Railroad Administration Train Horn Rule (49 CFR Part 222) requires the sounding of locomotive train horns on approach and entry of public highway-rail grade crossings It preempts state and local laws/ordinances governing the sounding of locomotive horns It includes provisions that allow communities to silence train horns at crossings by establishing quiet zones that meet certain requirements 3

Minimum Requirements Minimum length of a quiet zone is one-half mile along the length of a railroad right-ofway All crossings equipped with warning devices comprised of flashing lights, bell and gates that conform to current standards Advance warning signs at each crossing advising traffic that train horns are not sounded 4

Minimum Requirements In order for a quiet zone to be qualified under the rule, it must be shown that the lack of a train horn does not present a significant risk with respect to loss of life or serious personal injury, or that the significant risk has been compensated for by other means 5

Supplementary Safety Measures Supplementary Safety Measures (SSMs) include five possible strategies: Wayside horn system Median barrier Four-quadrant gate system One-way street with gates Temporary or permanent closure of a grade crossing 6

Wayside Horn System Horn permanently installed at a crossing that is directed toward approaching traffic Effectiveness Rate*: 1.00 Cost: $70,000 *The effectiveness rate indicates the ability of a particular safety measure to reduce risk at a railroad crossing. An effectiveness rate of 1.00 would mean that the risk index would be reduced to zero. 7

Wayside Horn System 8

Median Barrier Install a median barrier on both roadway approaches to a crossing so that a driver cannot drive around a lowered gate to cross the tracks Must extend 100 feet back from crossing or at least 60 feet if a street or driveway is nearby Effectiveness Rate: 0.75 to 0.80 Cost: $30,000 to $100,000 9

Median Barrier 10

Median Barrier 11

Median Barrier 12

Four-Quadrant Gate System Gate system where all roadway approach and exit lanes are fully blocked Effectiveness Rate: 0.77 to 0.82 Cost: $150,000 to $500,000 13

Four-Quadrant Gate System 14

One-Way Street with Gates Gate installed such that all approach lanes on roadway are completely blocked Effectiveness Rate: 0.82 Cost: $5,000 to $60,000 15

Closure of a Grade Crossing Installation of a closure system that completely blocks pedestrian and vehicular traffic from entering the grade crossing Can be temporary (part of day) or permanent Effectiveness Rate: 1.00 Cost: $5,000 to $250,000 16

Closure of a Grade Crossing 17

Process for Establishing a Quiet Zone Qualifying Conditions One of four conditions must be met: One or more SSMs installed at each crossing Safety measures taken at crossings such that the level of risk is the same or lower than would exist if the horns were sounded The level of risk is the same or lower than the nationwide risk threshold without additional safety measures The level of risk is the same or lower than the nationwide risk threshold with additional safety measures implemented at selected crossings 18

Process for Establishing a Quiet Zone Outline of Basic Steps Update railroad crossing inventory data and develop quiet zone plan of action Assemble Diagnostic Team (City, FRA, RR, TxDOT) Conduct community meeting to present plan and establish consensus Council action to authorize notices of Quiet Zone Prepare design plan and secure funding Issue Notice of Intent (NOI) with 60 day comment period Implement safety measurements Issue Notice of Establishment (NOE) Place quiet zone into service 19

Quiet Zone Project Funding City bond programs Regional Transportation Council Railroad Crossing Reliability Partnership Program Other federal and state grant programs Private sector sources 20

Results of 2007 TEC Briefing Initiate quiet zone project development for railroad segments identified through community input Utilize safety measures that allow the City to designate a quiet zone without FRA approval and monitoring utilize median treatments wherever possible Strictly follow procedures within the Federal Railroad Administration Train Horn Rule Include 100-foot long median barrier in new roadway designs at railroad crossings 21

Location & Status North Dallas Cotton Belt (DGNO) Dallas Parkway (DNT Service Roads), Knoll Trail, Davenport (E-W), Campbell, Davenport (N-S), Hillcrest, McCallum, Meandering Way, Dickerson, and Coit Diagnostic Team inspection completed Community meeting 9/18/2008 Funding $1.244 federal / $311,000-2003 bonds Consultant preparing preliminary design for ten crossings Council authorized Notice of Intent on 7/2/2008 22

Location & Status Southeast Dallas Union Pacific RR Urbandale -Jim Miller, Urban, Buckner Blvd Diagnostic Team inspection completed Council authorized funding for UPRR preliminary engineering 9/10/2008 Future bond funding estimate $500,000 Council authorized Notice of Intent on 9/10/2008 Joppa - Lindfield Road Diagnostic Team inspection completed Community meeting 12/15/2007 Request withdrawn 23

Location & Status Northwest Dallas Union Pacific RR, DART Hawes, Empire Central, Anson, Gilford, Burbank, Wyman several other crossings being closed as a part of DART s Northwest LRT project Freight line adjacent to DART transit route Length of crossings between freight and DART lines poses unique concern for vehicle and pedestrian entrapment safety Diagnostic Team inspection will be scheduled in Spring 2009 24

Location & Status North Central Dallas Trinity Railway Market Center Blvd Diagnostic Team inspection completed Second Trinity Railway track under construction Council authorized Notice of Intent 9/24/2008 Council will consider authorizing Notice of Establishment on 1/14/2009 Quiet Zone will be implemented once rail construction is completed and signs are installed 25

Location & Status Northeast Dallas Kansas City Southern RR Highland, St. Francis, Lakeland, Mariposa, Peavy, Easton, Centerville, Barnes Bridge, and Santa Anna Funding $1.8M federal available / local funds needed to access federal funds future bond funding estimate $450,000 Diagnostic Team inspection will be scheduled in Spring 2009 26

Location & Status Far North Dallas Kansas City Southern RR Dallas Parkway (DNT Service Roads), Horizon Diagnostic Team inspection scheduled for January 16, 2009 Minimal implementation cost anticipated 27