The loom consists of a row of vertical posts spaced evenly apart. This is the width you require.

Getting started SCOUT ENGINEERING

Information Booklet 5

Pioneering Challenge. Pioneering Challenge. Tower. Notes: various depending on design points. Project: Walkway.

Ropework. Stopper knots. Overhand Knot ROPEWORK. Figure of Eight 3.

Scout Meeting Schedule: Week 3 Theme: Pioneering A Date:

Charmborough Bells Risk Assessment and Method Statement

Scout Skills Lashings

Level Two Green Rope. Clove Hitch

Try it! You ll like it!

requirement 9 Polyester Nylon

HORSE RIDING CLUBS ASSOCIATION OF VICTORIA INC.

Ropework. Stopper Knots. Overhand Knot ROPEWORK. Figure of Eight 3.

The Agility Association of Canada

II-28 STOKES BASKET OPERATIONS

KNOTS. A very short guide to knotting terminology used on these pages.

Scout Meeting Schedule: Week 2 Theme: Pioneering A Date:

FALL PROTECTION GUIDELINE

FALL PROTECTION / ELEVATED WORK

Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder

THE CHALLENGE COURSE CHALLENGE COURSE AREA ELEMENT LAYOUT

Rigging Stages, Bosun s Chair, and Rope Ladders

PATHFINDER DISTRICT WINT-O-REE

CSK013. Knots Games. 3rd Poole Sea Scouts

At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest.

Raritan Valley Fall Camporee

Skills Night 2005 Troop 80, B.S.A.

CAMPOREE COMPETITION EVENTS Cahuenga District Camporee/Cuboree 2016

"FALL PROTECTION IN CONSTRUCTION ENVIRONMENTS"

The Association Cup Ver SKILL AT ARMS COURSE

Scout It Out would like to extend its gratitude to all the sites where the following information had been gathered.

HMS Colossus Dive Trail

Assembly Instructions

CAMPOREE COMPETITION EVENTS Cahuenga District Camporee/Cuboree 2015 Prepared. For Adventure!

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

Nice. Nine. Need to. You

Knot Masters Program

"FALL PREVENTION IN THE WORKPLACE"

Scout Meeting Schedule: Week 1 Theme: Pioneering A Date:

*Please click each table icon to enter guests names and the total number of guests assigned to each individual table, including the Head Table.

SPECIAL LAUNCHING METHODS

*Please click each table icon to enter guests names and the total number of guests assigned to each individual table, including the Head Table.

Learning Objectives Source/Example Questions

Highcliffe play area questionnaire analysis

Chapter 10 SWIMMING POOLS

JANUARY 2011 EQUIPMENT LIST CONTENTS: 1. SWIMMING LANES 2. STARTING BLOCKS 3. STORAGE DRUMS FOR SWIMMING LANES 4. WATERPOLO GOALS

CHAPTER 10 FALL PROTECTION

APPROVED MAIN COURSES

INNER QUEST Challenge Course Elements

Pattern Book for the 28 th European Championship of American Quarter Horses. Welcome To The Show!

PHONG TRÀO THIẾU NHI THÁNH THỂ VIỆT NAM TẠI HOA KỲ The Vietnamese Eucharistic Youth Movement in the USA 13 BASIC KNOTS

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

10U/12U PHASE II - AGILITY & BALANCE LADDER: TAPIOCA 10U/12U PHASE II - AGILITY & BALANCE LADDER: TAPIOCA

POLICY - GOALPOST SAFETY

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

FALL PROTECTION. Leader s Guide. Marcom Group Ltd.

REAR YARDS - There shall be a rear yard no less than forty (40) feet.

SCRUFFIES NEWS SCRUFFIES SPECIAL RAFT BADGE DAY Anti-Gambling dog, and Pro RAFT advocate creates viable alternative to Horse racing - Raft Racing!!!

Pioneering. It s More Than Just Knots and Rope

Fall Protection and Elevated Work

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

GENERAL HEALTH AND SAFETY REQUIREMENTS

CONQUER THE GAUNTLET ELITE RULES AND REGULATIONS. There are three overarching rules that all athletes must abide by at Conquer The Gauntlet:

APPENDIX A Obstacle Rules & Overview

Laying out the Grid Laying out an accurate grid pattern in the sand is very important in order to get the columns and rows straight and true.

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

Pioneering. It s More Than Just Knots and Rope

DE8410 FIVB Official Beach Volleyball Net

Playground Product Specifications

OSHA s new walking working surfaces standards

KLONDIKE DERBY 2017 February 10-12

Blue Jacket District 2008 Klondike Derby Information Packet

PTV OBSTACLES The following PTV obstacles are approved for use in Affiliated BHS TREC events

Hillbilly Golf. Included. Game Building Instructions. 2-foot Fence Building Instructions. Bolo making Instructions

Chapter 3 &4_2015.notebook March 09, 2018

Assembly Instructions

D. N. HYLAN & ASSOCIATES, INC. BOATBUILDERS COQUINA STUDY PLANS

3 AND 6 SIDE ARMS, STRAIGHT/TAPERED TOWER SECTIONS

Knots, Hitches and Bends

SEC. 1.0 GENERAL RULES...3 SEC. 2.0 RATING EVENTS...3

GYMKHANA COURSES GC 1

Play Equipment Fundamental

COMMAND TASK 1 - 'V' Planks

Hansa COG 14 th century SCALE: 1/72 Length: 430mm Width: 210mm Height: 330mm

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Developmental Products

Building a 30 Tall Four-Legged Signal Tower

GUIDELINES FOR USE GUARD

Assembly Instructions. -Cantilever Boat Lifts

1. 2: 1 System ( YELLOW BAG ) made up of 200 feet of 9mm kernmantle rope, carabineers and a preset 2: 1 pulley system.

1 Whale Watch. Traffic Jam

Wooden Dummy Construction

Safe Use of Access Equipment

RULES OF RICOCHET 2009

Installation and Training Manual

Accuplacer Arithmetic Study Guide

Climbing Stick OWNER S MANUAL

Goal Post Installation Guidelines

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

Transcription:

Foreword This pamphlet has been compiled to provide some ideas for pioneering projects. Included are simpler projects that can be undertaken by Junior Scouts, whilst more complex tasks are also provided for Venture and Rover Scouts. Before you start on any project ensure that all the components listed are available. Complied by Silvester Matooma Kato Uganda Scout Association 2001

Contents 1. Counter Weight Bridge...1 2. Tower...2 3. Extending Tower...3 4. Draw Bridge...4 5. Treadmill...5 6. The Ravine...6 7. The De-Esteeayliser...7 8. The Water Chute...8 9. Suspended Flag Pole...9 10. Kaazi Surprise...10 11. The Secret Weapon...11 12. The Swamp...12 13. The Elevated Tent...13 14. The Fishing Net...14 15. Tight Rope...15 16. Swing Boat...16 17. Trapeze...17 18. Seine Bridge...18

1. Counter Weight Bridge 2. Tower Four, 6 Metre Thirty 4.5 Metre Two 3 Metre Twelve 9 Metre One 2 Metre Two 1.5 Metre Blocks One heavy log for pivot One 4 inch single Two Logs for weights Fifteen staves Pickets Four 1m Metre Eight One 9 Metre 38mm Maul Three, 6 Metre heavy Eighteen, 4.5 Metre One 7.5 Metre Two, 6 Metre One 3 Metre Sisal One 2.5 Metre Two 2 Metre Four 1.5 Metre Two 1.25 Metre Ten, 0.5 Metre for platform Twelve, 0.25 Metre for steps Page 1 Page 2

3. Extending Tower 4. Draw Bridge Eight, 3 Metre uprights Four, 6 Metre for on both frames corner pulleys Eight, 2.5 Metre top and 40 collier lashings bottom rails on outer frame Four, 3 Metre braces Blocks Eight, 2 Metre top and Four, 4 inch single bottom rails on inner frame Four, 2.5 Metre braces Plank for deck Adhesive tape Four pickets One 9 Metre 38mm Six, 4.5 Metre (main stays and bottom side supports) Three, 2.5 Metre (cross members top) Three, 3 Metre stout (pulling bar at the top) Two, 7.5 Metre, 50mm (main guys) Two, 9 Metre, 50mm (for suppoting the seat) Two, 4.5 Metre 38mm (pulling ropes) Twenty, 4.5 Metre (includes anchoring ropes and second plank lashing) One, 2.5 Metre stout plank Four pickets Four large tent pegs One maul One spade Page 3 Page 4

5. Treadmill 6. The Ravine Two, 3.5 Metre Sixteen, 4.5 Metre Four, 1.5 Metre Twenty-four, 4.5 Metre Four, 2 Metre Twelve, 1 Metre Blocks Twelve, 0.5 Metre Two single One, 18 Metre 38mm Rope Ladder Sacking Ten, 7.5 Metre Thirteen, 4.5 Metre One, 6 Metre Sacking Thirteen, 2 Metre Blocks One, 5 inch single block Two for bridge One, 5 inch double block One, 18 Metre 38mm One ladder Twenty, 4.5 Metre lashings One plank or ladder Three large oil drums, 20 One stave per team or 40 gallon member Page 5 Page 6

7. The De-Esteeayliser 8. The Water Chute One heavy spar One on and off switch Six tyres One end board Eight, 9 Metre lashings One length of sisal Two strong boxes One metal wand about 1 Metre long Four 3 Metre Twenty six, 4.5 Metre Two, 6 Metre Four light sisal Five, 2 Metre Four, 9 Metre Four, 0.5 Metre Sisal Four pickets One maul Page 7 Page 8

9. Suspended Flag Pole 10. Kaazi Surprise One, 26 Metre light Two, 50mm to reach between trees Ten, 1.5 Metre light Four, 12 Metre approx. Guys. Twelve Staves Two for rope ladder Ladder rungs Two halyards Ten, 4.5 Metre lashings Sisal Page 9 Page 10

11. The Secret Weapon 12. The Swamp One double atomic pyramid (to own design) Objects to hang on Pyramid i.e. dixies of water, bell etc Before you lies a very secret weapon which is ready for testing. It is highly dangerous. You must move it with utmost care and, as sound vibrations affect it, it is essential that you make no noise. Move the weapon to the testing field along the line indicated by the trail. The weapon must not be tampered with or altered Three large oil drums, 20 or 40 gallon One plank or ladder One stave per team member Page 11 Page 12

13. The Elevated Tent 14. The Fishing Net Two, 3 Metre Three planks approx. 2 Metre Ten, 2.25 Metre Rungs for ladder Sacking Two, distances between One tent trees Five, 38mm 9 Metre Six pegs Six, 6 Metre approx (two One mallet for rope ladders) Sixteen, 4.5 Metre lashings Four, 3.5 Metre Fourteen, 4.5 Metre lashing Two, 1 Metre Two, 9 Metre lashing Two, 0.75 Metre One, 12 Metre 50mm Two, 0.5 Metre Two, 3 Metre light One net, 3 Metre bamboo poles square Two pieces 150mm, by 50mm, 1.25 Metre One metal pipe, 1.25 Metre One maul One log, counterweight Page 13 Page 14

15. Tight Rope 16. Swing Boat Two, 2 Metre Eight, 4.5 Metre One, 1.25 Metre Two, 1 Metre Three, 1.5 Metre Pickets Long stave for balancing Eight One, 50mm, 18 Metre Maul One, 50mm, 9 Metre One, 50mm, 6 Metre Six, 4.5 Metre (main stays and bottom side supports) Three, 2.5 Metre (cross members top) Three, 3 Metre stout (pulling bar at the top) Two, 7.5 Metre, 50mm (main guys) Two, 9 Metre, 50mm (for supporting the seat) Two, 4.5 Metre 38mm (pulling ropes) Twenty, 4.5 Metre (includes anchoring ropes and second plank lashing) One, 8 foot stout plank Four pickets Four large tent pegs One maul One spade Page 15 Page 16

17. Trapeze 18. Seine Bridge Eight, 2 Metre Forty 4.5 Metre Four, 2.5 Metre Twelve, 1.25 Metre Eight, 1 Metre Nine, 3 Metre heavy Six, 3 Metre bamboo Fifteen staves Four 1 Metre Page 17 Page 18