Annex: Technical Framework Conditions

Similar documents
Bad Lauchstädt Storage. Special Storage Facility Conditions

Powernext Commodities - Market Notices - November 1 st 2018

Metering Code Gas TSO, measurement by connected party Effective from to the present

Central European Gas Hub

CMM Conservation and Management Measure for the Management of New and Exploratory Fisheries in the SPRFMO Convention Area.

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

CMM on Management of New and Exploratory Fisheries in the SPRFMO Convention Area

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Submission of Non-PTO Wheeling Data

Fact Sheet part of eex group

Central European Gas Hub

One platform for one European Gas Market

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

Code for the Provision of Chargeable Mobile Content Services

Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments.

RACING AND ATHLETICS REGULATION 6 SIMULCAST WAGERING

Open gas market conditions from perspective of traders and consumers

Code for the Provision of Chargeable Mobile Content Services

WINDSPEED. Resultat og erfaringer med MSP. 26. september 2013 Hans Chr. Sørensen, SPOK ApS. Contract number: EIE/07/759/S

Natural Gas Emergency Plan Version 4

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

2017 RULES AND REGULATIONS

INTERCONNECTION AGREEMENT. (UK-CONTINENT INTERCONNECTOR) Amended and Restated (25 th September 2015) between NATIONAL GRID GAS PLC.

BBL Reverse Flow project and implications for IP Bacton. Presentation to the UNC Transmission Workgroup 7 th June 2018

Recalibration of gas meters

The balance of the charter fee will be paid to Cloud Nine Yacht Charters not less than 28 days before the start of the period of charter.

Field verification of on-line HC dew point measurements

Study on Underground Gas Storage in Europe and Central Asia. Chapter 2 Current UGS Status in Europe and Central Asia

2018 Canoe Sprint Senior Team

Energy Networks Management Safety Procedures DEFINITIONS

Integration of the. BBL pipeline into. the TTF market. area. Operational aspects

SECOND AMENDMENT TO THE EMPLOYMENT CONTRACT BETWEEN THE GEORGIA TECH ATHLETIC ASSOCIATION AND COACH PAUL JOHNSON

Country report. Croatian bathing water quality in Croatia. May Photo: Peter Kristensen

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

Appendix 8-A Safety Zone Entry Check Lists

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

Rules for the use of short extracts for news reporting applicable for the Sochi 2014 Paralympic Winter Games*

ONTRAS VNG Gastranport GmbH PRICE LIST FOR NETWORK ACCES

CODE OPERATIONNEL DE RESEAU TRANSMISSION

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

CONTINUITY OF SERVICE PLAN FOR THE LRIT SYSTEM

DSG CSS Consequential Change. 22 nd January 2019

These General Terms and Conditions apply to Ski & Snowboard Schools operating in the Province of Salzburg

Network Transmission System Gas Supply Emergency / Gas SCR Overview

DRAFT. Player Movement Regulations. Contents

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

General Meeting of Shareholders

FIFPRO World Player s Union, Legal Legends in sport and the future of sports law

Contract with Rowell Ranch Rodeo, Inc. for Law Enforcement Services

Abellio s Cycle Strategy

EN1279 part 3 assessment of insulating glass: IGU with Duralite sealant

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION

SINGAPORE POOLS (PRIVATE) LIMITED 210 MIDDLE ROAD, #01-01 SINGAPORE POOLS BUILDING, SINGAPORE

MEMORANDUM OF UNDERSTANDING

FROM THE CLASSICAL FIRE FIGHTING WATER SUPPLY TO STRUCTURE AND SMOKE GAS COOLING TAKING GLEINALMTUNNEL AS AN EXAMPLE; PART II

The future of UK Gas Security. Findings of a survey of major energy users conducted on behalf of:

POINTS = SINGLE POINTS OF CONTACT SPORTS INTEGRITY

HOE TONGA REGIONAL WAKA AMA DEVELOPMENT OFFICER. Regional Waka Ama Development Officer. Board of Hoe Tonga Pacifica Waka Ama Association

WHITE PAPER. Agile / Scrum

Alabama Soccer Association State Cup. Rules & Procedures

NATIONAL PLAYER TRANSFER REGULATIONS

TOYOTA GAZOO Racing Trophy Terms of Participation

DNA-OC GENOMIC BREEDING VALUE CONTRACT

Notice of Race 1. ORGANIZING AUTHORITY

Lane Rental - A Utility Perspective. Paul Gerrard Street Works Manager, National Grid

Australian Canoeing. Canoeing Competitions Bylaw. Adopted by the Board 31 October Bylaw #19

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b)

Maui Development Limited. Transitional disclosure of pipeline capacity

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

Project Name: Smart Choice for commuters - BIKE2WORK Contract N : IEE/13/585/SI Duration: 36 months

PROCEDURES AND CRITERIA FOR DETERMINING AND ADDRESSING EMERGENCY SITUATIONS AS REFERRED TO IN ARTICLES 8 AND OF THE 1996 LONDON PROTOCOL

TLN WRO Document. Back to Back CAS support

TABLE OF CONTENTS Page Chapter I CYCLO-CROSS EVENTS 1 General Rules 2 2 Event procedure 10. Chapter II UCI CYCLO-CROSS RANKING 14

6 TH CEER BENCHMARKING REPORT ON THE QUALITY OF ELECTRICITY AND GAS SUPPLY 2016 GAS TECHNICAL OPERATIONAL QUALITY

Transfer Procedure. Agreement between the player and the new club as well as between the two clubs. Player is registered for the new club.

Grande Prairie Industrial Hockey League Constitution and By-Laws By-Laws

Constitution of Ukraine

Connecting Coal Bed Methane to the NTS. Transmission Workstream 1 st July 2010

RESIDENTIAL WATER DISTRIBUTION

NOTICE OF MOTION MOTION: # X Regulation 2.1 (Definitions)

AMG Customer Sports Championship 2015/2016 TERMS OF PARTICIPATION

2013 Integrated Resource Plan September 24, 2012

2015 WEVZA BEACH VOLLEYBALL TOURNAMENTS CONTINENTAL TOUR ZONAL EVENTS

ARTICLE 14. CASINO SIMULCASTING

Order No Wisconsin 1837 and 1842 Ceded Territory Tribal Wild Turkey Hunting Regulations

Market Operation. Direct tel: +44 (0) Direct fax: +44 (0)

2017 IIHF BID REGULATIONS

Network Transmission System Gas Supply Emergency / Gas SCR Overview. Jenny Phillips

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: April 1, 2012 Service Agreement No Old Dominion

TP Validating a dynamic grid model with tracer gas injection and analysis

Certificate of compliance

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Norma Trim, Chief Financial Officer and Commissioner of Corporate Services

PEGAS Gas Trading Update

Withdrawn Document. Title of Rule Book. SECTION P (Part ii) WORKING OF SINGLE AND BI- DIRECTIONAL LINES BY PILOTMAN.

Michael Parmer, Management Aide, City Manager's Office

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

NORTHERN CRICKET UNION OF IRELAND

Internal Sealing of Masts

Transcription:

Annex: Technical Framework Conditions to the general terms and conditions for access to the natural gas storage facilities operated by innogy Gas Storage NWE GmbH (igsnwe) Preamble The utilization of the storage capacities maintained for the storage customer pursuant to the storage contract is limited by the technical framework conditions described in this Annex which are contingent on technical and usage-contingent parameters. Such technical and usage-contingent parameters include inter alia the mode of operation of the storage facility, the actually stored natural gas volumes, the actual gas qualities and the mode of operation of the network operator adjacent to the storage facility. 1 Injection and Withdrawal Rate Curves (1) The utilization of the maintained storage capacities is limited by the injection and withdrawal rate curves of the natural gas storage facility. The injection curve shows the maximum usable injection capacity as a function of the working gas stored by the storage customer. The withdrawal curve shows the maximum usable withdrawal capacity as a function of the working gas volume stored by the storage customer. (2) Below is a sample anticipates injection characteristic line: * IC = Injection capacity ** WGV = Working gas volume

(3) Below is a sample anticipates withdrawal characteristic line: * WC = Withdrawal capacity ** WGV = Working gas volume 2 Availability Notices (1) igsnwe shall provide the storage customer every Thursday by 02:00 p.m. of each calendar week a seven (7)-day availability notice for the injection and withdrawal capacity maintained for the following seven (7) gas days via the web portal of igsnwe. If Thursday is not a working day, the notice shall be made on the preceding working day for the following seven (7) days plus the holiday(s). (2) With due regard to the measures planned for each day, the availability notice shall contain information on the planned maximum usable portion of the injection and withdrawal capacity maintained for the storage customer. 3 Changeover Time (1) The utilization of the injection and withdrawal capacities maintained for the storage customer pursuant to the storage contract is restricted by the technically required changeover time in case of switching from injection to withdrawal and from withdrawal to injection. This changeover time is two hours. - 2 -

(2) The storage customer is not entitled to provide the natural gas volume to be injected hourly and igsnwe shall not be obligated to take this natural gas volume if the changeover time is not observed by the storage customer. (3) igsnwe shall not be obligated to provide the natural gas volume to be withdrawn hourly and the storage customer shall not be entitled to take such natural gas volume if the changeover time is not observed by the storage customer. 4 Employment of Working Gas Volumes (1) The storage customer has to assure that the requirements in mining law regarding the employment of the working gas volume are observed. (2) The requirements to be observed by the storage customer for the employment of the working gas volume shall be contingent on the contracted storage capacities and shall be agreed with the the storage customer as an annex to the storage contract. 5 Storage injection and Withdrawal Points (1) The storage injection points shall be the withdrawal point from the transmission grid published for the respective storage by the adjacent network operator: In case of: 1. innexpool: Zone Epe/Xanten II (UGS-A) 2. storage Epe H-Gas: Epe - (UGS-A) II 3. storage Xanten: Xanten, 2 (UGS-A) 4. storage Epe L-Gas: Gronau Epe L1 (market area NCG; network operator Open Grid Europe GmbH) 5. storage NL: ENSCHEDE - UGS Epe (market area TTF; network operator Gasunie Transport Service B.V.) 6. storage Staßfurt: UGS Staßfurt (market area Gaspool; network operator ONTRAS Gastransport GmbH) in the respective Market Area [name of market area]. The adjacent network operator is [name of network operator]. - 3 -

(2) The storage withdrawal points shall be the injection point to the transmission grid published for the respective storage by the adjacent network operator In case of: 1. innexpool: Zone Epe/Xanten I (UGS-E) 2. storage Epe H-Gas: Epe - (UGS-E) I 3. storage Xanten: Xanten,1 (UGS-E) 4. storage Epe L-Gas: Gronau Epe L1 (market area NCG; network operator Open Grid Europe GmbH) 5. storage NL: ENSCHEDE UGS Epe (market area TTF; network operator Gasunie Transport Service B.V.) 6. storage Staßfurt: UGS Staßfurt (market area Gaspool; network operator ONTRAS Gastransport GmbH) in the Market Area [name of market area]. The adjacent network operator is [name of network operator]. 6 Natural Gas Quality (1) The quality of the natural gas volumes provided by the storage customer at the storage injection point for delivery and the quality of the natural gas volumes provided by igsnwe at the storage withdrawal point for offtake must meet the rules in Worksheet G 260 (2nd Gas Family) for storages connected to the German transmission grid, issued by the German Association of the Natural Gas and Water Industry (DVGW) as amended from time to time. (2) Notwithstanding to (1) for storages connected to the Dutch transmission grid the quality of the natural gas volumes provided by the storage customer at the storage injection point for delivery and the quality of the natural gas volumes provided by igsnwe at the storage withdrawal point for offtake must meet the rules according to the Common Business Practice Harmonisation of Natural Gas Quality issued by EASEE-gas for utilization of the maintained storage capacities within the Netherlands as amended from time to time. - 4 -

7 Pressure (1) The storage customer must provide igsnwe the natural gas volumes to be injected at the storage injection point at a pressure within the permissible pressure ranges, thus enabling igsnwe to take and inject the natural gas volumes. igsnwe must take from the storage customer the natural gas volumes to be injected at the storage injection point at a pressure within the permissible pressure ranges, thus enabling the storage customer to inject the natural gas volumes and deliver them to igsnwe. (2) igsnwe must provide the storage customer the natural gas volumes to be withdrawn at the storage withdrawal point at a pressure within the permissible pressure ranges, thus enabling the storage customer to take the natural gas volumes and inject them in the adjacent transmission network. The storage customer must take from igsnwe the natural gas volumes to be withdrawn at the storage withdrawal point at a pressure within the permissible pressure ranges, thus enabling igsnwe to withdraw the natural gas volumes. (3) In terms of the permissible pressure ranges the pressure requirements currently published by the adjacent network operator shall be applicable. - 5 -