Bar Harbor Route 3 Gateway Project Advisory Committee September 21, 1-3 PM Atlantic Oakes Hotel Minutes

Similar documents
Bar Harbor Route 3 Gateway Project Context Sensitive Solutions

Context Sensitive Solutions for Redesign of Route 3 Gateway to Bar Harbor and Acadia National Park

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

East Burke Transportation, Safety and Capacity Improvements

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

City of Wilsonville 5 th Street to Kinsman Road Extension Project

MASTER BICYCLE AND PEDESTRIAN PLAN

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

CITY OF PORTSMOUTH PLANNING DEPARTMENT

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Plant City Walk-Bike Plan

NEWMARKET UPHAM S CORNER

CLOSED. Highlights of the Final Concept Design:

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

NORTH HIGHLAND LAKE ROAD PROJECT

Ann Arbor Downtown Street Plan

STONY PLAIN ROAD STREETSCAPE

Tonight is for you. Learn everything you can. Share all your ideas.

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

El Paso County 2040 Major Transportation Corridors Plan

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Living Streets Policy

Complete Streets Successes, Opportunities, and Challenges

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Pennsylvania Avenue (CR 484) Design Alternatives Study

Land Use and Transportation Town Hall September 17, 2018

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Major Bike Routes 102 Avenue Workshop April 21, 2015

NJDOT Complete Streets Checklist

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Public Information Meeting #1. Pā ia Community Center 5:30 PM 8:00 PM

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

MASTER BICYCLE AND PEDESTRIAN PLAN

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Lincoln Highway Streetscape Plan Concept Plan

The Leadville Bikeway Design Recommendations DRAFT January 2018

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Hidden Oaks Elementary School

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Construction Specifications Manual

Parks, Open Space, Trails and Recreation Master Plan

EXECUTIVE SUMMARY. Vision

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Almon Street Bike Lane Planning

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Terwillegar Drive Expressway Draft Concept Plan

Welcome to the Quebec Alternatives Analysis Public Meeting

11/28/2016 VIA

Orinda Bicycle, Trails and Walkways Master Plan

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

MISSISSIPPI EAST BANK TRAIL

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Off-Road Facilities Part 1: Shared Use Path Design

Borough of Danville, PA Traffic Calming Program Guidelines

Non-Motorized Transportation 7-1

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Bicycle and Pedestrian Level of Service Measures

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Knox Street Complete Streets Project

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Designing Complete Streets: What you need to know

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

RE: Park Plaza Walgreens (P12-016)

Public Information Centre

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

City of Jacksonville Mobility Fee Update

Austin Avenue Bridges Project. Public Meeting Summary

Safe Routes to School Action Plan Aberdeen, Idaho

6.4 RECOMMENDED IMPROVEMENTS

What Is a Complete Street?

Omaha s Complete Streets Policy

The Wiggle Route in Context

Providing an Efficient and Multi-modal Transportation System

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Preliminary Engineering Study

PROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from

Community Bicycle Planning

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Physical Implications of Complete Streets Policies

Transcription:

Bar Harbor Route 3 Gateway Project Advisory Committee September 21, 1-3 PM Atlantic Oakes Hotel Minutes Attending: Dick Cough, Edith Milbury, James Blanchard, Chris Fogg, Paul MacQuinn Millard Billings, Joe Minutolo, Stephanie Clement, Sharon Tate, Elsie Flemings, Dead Read, Terry Needham, Kyle Johnson, Jim Fisher, Fred Michaud, Ron Beard, Anne Krieg, Francis Russell Others present: Mary Booher, reporter, COA student 1:00 Gather, review agenda and outcomes of meeting, brief check in question 1:10 Review updated Problem Statement Jim Fisher and Anne Krieg Problem Statement with suggested revisions from last meeting The Route 3 Corridor is the primary entrance to Bar Harbor, Acadia National Park and to our commercial centers. Its condition is rough and deteriorated. There is limited protection for pedestrians and the shoulders are not well suited for bicyclist. This does not present a positive or welcoming experience for the millions annual users of this corridor. In this process for context sensitive solutions, we hope to improve safety and efficiency of travel for all users, while attending to the following in a redesign of the travel corridor: Roadway width and design Pedestrian ways and bike ways Access to local roads, businesses, and residences Drainage, lighting and other environmental impacts Historic and scenic quality Scenic turnouts, way-finding and interpretive signage Comments: Edith Milbury: Route 3 Corridor recognize that this is an All American Road Road passes through several neighborhoods, commercial areas, scenic tourism areas. 1:20 Reports from each small group (15 min per group) Ireson Hill Paul MacQuinn - Reviewed recommendations of the committee (also in writing) 11 foot travel lanes 1

4 foot shoulders wherever possible Not sufficient room for sidewalks and shoulders Improved drainage replace failed drainage Create or fix pull-offs (eg. Sonny s) Retain trees as possible for canopy Retain neighborhood character Dean Read Don t know how much room there is now currently 11 ½ road with no shoulder. How will we help entrances to function eg. Church Where are people walking now? Mostly notice people heading up the hill. They may be going where they think they can get a bus. It s very difficult to walk there. Hulls Cove Stephanie Clement o Speed, particularly cars coming down the hill need to look out for traffic turning onto the Crooked Road Might want to consider a left turn lane onto the Crooked Road Traffic should be more organized o People coming off of the Crooked Road often does not stop at the stop sign. The angle of the intersection leads people to keep moving. Making the turn more perpendicular would make it more difficult for trucks to make the turn onto Route 3 Also difficult for southbound trucks to turn onto the Crooked Road o There are sections of sidewalk and crosswalks o There is a lot of pedestrian use, some of which is unsafe o The future corridor should accommodate walkers and bicycles. o Need to take into account commercial uses o Scenery is very important in Hulls Cove first view of the ocean o There are a lot of houses close to the road o Screening will be important o Need to address environmental impacts Two stream crossings o Concern about Chart Room restaurant not much room for bicycle paths o Terry taking land on the Chart Room side may make the area more dangerous. o There is some chaos around the gas station. Need to look at access management around commercial entrances in Hulls Cove. o Catch basin by the chart room was overflowing Bicycling safety Acadia Entrance and the Bluffs John Kelly 1 mile after Hulls Cove to Sonogee Some large residences, bluffs One commercial hotel entrance Pedestrian access might not be very useful as there is little development in this section A connector trail at the beginning of the section might be helpful. 2

Need to maintain safety as cars move between the park entrance and the Bar Harbor lanes. Need a left turn into the park entrance improve traffic flow and safety Alternatives for cyclists o Stay on Route 3 drainage on this section is very difficult for cyclists o Travel on the park loop road steeper slopes, not very attractive to cyclists. Should pay park entrance fee. No winter maintenance. Need to provide a safe route for cyclists o Up to the bluffs there would be sufficient space for a separated bicycle lane o At the bluffs there isn t much additional space o Could cantilever out over the bluffs at enormous expense Want to maintain the scenic quality of this section o Nice that there is no development in this section Scenic overlook at the bluffs some support, but road width and safety are concerns o Would southbound traffic be restricted from going to the overlook? o How would this facility accommodate RVs and motor coaches? o Can the turnoff Vegetation management need to continue tree trimming to preserve view Concerned about rock falls, ice falls on the shoulder Park Service Road connects Hulls Cove to Park Visitor Center. It is closed to motor vehicles, but available for bikes and pedestrians. Questions Francis Russell: How will the Parady Subdivision be accommodated? John: The current proposal is for Hotel Row into Town New Name Eden Street Corridor Duck Brook to West Street Extension (but continued thinking to Mount Desert Street) Dick Cough Priorites Bikeway use space that is currently occupied by the sidewalk Pedestrian walkway most owners have agreed to grant easements for an off-road walkway try to move the walk to behind the stone wall Preserve Neighborhood character There are many bad intersections along the corridor o Entrances for COA should have a crosswalk to Highbrook Road o Properties with > 150 rooms, ferry terminal, etc. might need left turn lanes o West Street intersection is very dangerous o Might send some traffic up Highbrooke road to the park Ferry terminal re-use should be considered town might have uses Like the bus stop that this hotel put in = would like to have more bus stops Recommend reducing speed limit from 35 mph to 25 mph for safety Duck Brook is a scenic location recommend scenic turnouts on both sides 3

Questions If the pedestrian way is moved off of the corridor, do we still need to lower the speed limit? Residents have a difficult time accessing Route 3 due to fast traffic. Fred need to know the right of way for this corridor John Kelly park would rather not add additional traffic to local roads into the park Sidewalks in the more remote sections seems less critical than the in town section Is this ready to go to public meeting? What can HCPC do? HCPC can prepare maps that indicate concerns and recommendations presented by the group Recommendations should still be more general o Don t put specific measurements on the map just the concept HCPC will work with committee to re-write the recommendations into a unified document (still preserving segments) Stephanie want to present continuity of issues along the corridor Eg. Bicycle needs run the length of the corridor Need to avoid presenting any of these ideas as solutions. Public Meeting agenda Need to manage the meeting to engage interest but not overstate where we are in the process o Identify issues o Request public input Ron might start with a plenary session o break into groups o Could have break out groups by segment or by modality Fred MaineDOT can provide an overview of Context Sensitive Solutions Fred funding update o MaineDOT is programming $1.5 million for preliminary engineering in the 2011 biennial budget o Construction might begin in 2013 Should the Eden Street group talk with landowners about right of way for a trail? Ron a neighborhood meeting before the public meeting might be a very good idea Fred most of the participants have a personal stake in the outcome of this project. We want to think about all that we would like, but understand that we might not get everything. o MaineDOT has right of way staff that can educated people this will be appropriate for a future meeting 4

2:20 Update on any Town-supported infrastructure plans for the transportation corridor Chip Reeves and Anne Krieg Tabled 2:40 Further assignments for small groups and others, in preparation for October 19 meeting of PAC and October 25 public meeting UMaine Cooperative Extension, MaineDOT, Bar Harbor Planning and HCPC will iron out the documents for review on the 19 th 2:45 Agenda items for October 19 PAC meeting Review problem statement Review draft maps 2:55 Quick evaluation of this meeting and Adjourn (What worked well? What needs improvement?) Wrap Up How are you feeling about this process now? Process is going well. The ideas are very interesting. Need to be careful not to go too quickly to solutions. 5