TABLE OF CONTENT

Similar documents
TABLE OF CONTENT

Pipeline Pigging and Hydrostatic Test

TABLE OF CONTENT

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

KC Series Gas Components and Supply Design Guide

GAS SUPPLY APPLICATION GUIDE

Process & Instrumentation Diagram (P&ID) Purpose. Howitisdone? Methodology?

SULFUR RECOVERY UNITS Performance Test Arrangements (Operating Manuals)

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

RULES PUBLICATION NO. 119/P

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Module 6. Tightness Testing

Process Equipment Design Guidelines Chapter Four Instrumentation Selection and Sizing (Engineering Design Guidelines)

Temperature Controllers

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM

Thank You for Attending Today s Webinar. Today s Featured Speaker

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Armfield Distillation Column Operation Guidelines

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

BGA158 Series CE Approved Class B Shutoff Gas Valve

Changes Between API STD 521 6th Ed and 5th Ed Cataloged

G SPECIFICATION: TITLE: VOLUME: 4 REVISIONS:

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

GAS SUPPLY DESIGN GUIDE

M-06 Nitrogen Generator (Nitrogen Making Machine)

Fuel Gas Pressure Control Solutions for Fired Heaters and Boilers

The Discussion of this exercise covers the following points:

NORMAL OPERATING PROCEDURES Operating Parameter Information

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

BERMAD Fire Protection Hydraulic Control Valves

BGA158 Series CE Approved Class A Shutoff Gas Valve

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up)

GM Series Dual-Block Multi-Function Gas Control Valves

National Board of Boiler and Pressure Vessel Inspectors National Board Inspection Code Submission of Public Review Comment 201 Draft Edition

ENGINEERING STANDARD FOR PROCESS DESIGN OF LIQUID & GAS TRANSFER AND STORAGE ORIGINAL EDITION DEC. 1997

Tightness controls TC 1 3 and TC 4

High-Pressure Boiler Inspection Procedures: A Complete Checklist

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

GAS DEHYDRATION SYSTEM

Digester Processes. 1. Raw Sludge Pumping System

API RECOMMENDED PRACTICE 500 THIRD EDITION, DECEMBER 2012 ERRATA, JANUARY 2014

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

General Duty Clause. Section 112(r)(1) of CAA. Chris Rascher, EPA Region 1

Installation of Ballast Water Management Systems

Start up XXX from normal shutdown Introduction

Compressed Gases and Cryogens

Frequently Asked Questions Directive 056 Facilities Technical

INSTALLATION GUIDE Gas Rangetops

Transient Analyses In Relief Systems

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

Guidelines for Clean Agent Fire Suppression Systems

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

TRANSFER SYSTEM DESCRIPTION...3

HYDROGEN UNIT CHAPTER-4 UTILITY SYSTEM DESCRIPTIION

REGASIFICATION VESSELS

OPERATING PROCEDURES

Section 1.3: PRESSURE VESSEL COMPONENTS AND SYSTEMS AND COMPRESSED GAS CYLINDERS

F All types of inert gas systems are to comply with the following:

BGA158, BGA171 and BGA110 Series Shutoff Gas Valve

MSC Guidelines for Carbon Dioxide Fire Suppression Systems

LPG DRIVER ATTENDED TRANSPORT LOADING

PIP PNE00012 Piping Examination and Leak Test Guide

ISO INTERNATIONAL STANDARD. Gas cylinders Safe handling. Bouteilles à gaz Sécurité de manutention. Second edition

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

ACCESSORY KIT INSTALLATION MANUAL

PE 2708 CTS & IPS GAS PIPE

This document is a preview generated by EVS

Smart Water Application Technologies (SWAT) TM

Pressure Piping Code-Industrial Piping. Part 6: Safeguarding

ENGINEERING STANDARD FOR INSTRUMENTS AIR SYSTEM

PRESSURIZED EQUIPMENT AND SYSTEMS

Inerting System Design for Medium Speed Vertical Spindle Coal Pulverizers TABLE OF CONTENTS

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Installation Instructions

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

ARCHIVED. Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source. Prepared by the Department of Building and Housing

Spirax Compact FREME Flash Recovery Energy Management Equipment

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

Standard: NFPA 86 Process Ovens and Furnaces. NFPA 85 Boiler and Combustion Systems Hazards Code

Your safety and the safety of others are very important.

Required Indoor Draft Hood. Optional Outdoor Vent Cap

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

CENTRAL GAS SUPPLY SYSTEMS : CYLINDER BATTERIES AND HIGH PRESSURE HOSES

Grafiska symboler för scheman Del 8: Ventiler och spjäll. Graphical symbols for diagrams Part 8: Valves and dampers

Manual Actuated Boiler Blowdown Valves

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged

DESIGN DATA. Dry 105a. September 5, 2008

Operational Settings:

Spring Loaded Regulators Constant Loaded Regulators Twin Parallel Flow Regulators Field Service Regulators

Transcription:

Page : 1 of 11 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES 2 DEFINITIONS AND TERMINOLOGY 2 SYMBOLS AND ABBREVIATIONS 3 UNITS 3 DESIGN CRITERIA 3 Isolation 3 Depressuring 6 ESD and Critical Instrumentation 7

Page 2 of 11 SCOPE This Project Standards and Specifications is intended to cover minimum requirements and guidelines for process engineers to specify proper type of emergency measures for probable emergency situations. REFERENCES Throughout this Standard the following dated and undated standards/codes are referred to. These referenced documents shall, to the extent specified herein, form a part of this standard. For dated references, the edition cited applies. The applicability of changes in dated references that occur after the cited date shall be mutually agreed upon by the Company and the Vendor. For undated references, the latest edition of the referenced documents (including any supplements and amendments) applies. 1. NFPA (National Fire Protection Association) NFPA 30 "Flammable and Combustible Liquid code" 1996 Ed 2. API(American Petroleum Institute) API RP 521 "Guide for Pressure-Relieving and Depressuring Systems" 4 th Ed. March 1997 3. ASTM(American Society for Testing and Materials) ASTM D 323 "Standard Method of Test for Vapor Pressure of Petroleum Products (Reid Method)". 4. ISA(The International Society Of Automation) ISA 91.00.01 "Identification of Emergency Shutdown Systems and Controls That are Critical to Maintaining Safety in Process Industries". DEFINITIONS AND TERMINOLOGY Unit or Units - One or all process, offsite and/or utility Units and facilities as applicable to form a complete operable refinery/ and or plant.

Page 3 of 11 SYMBOLS AND ABBREVIATIONS SYMBOL/ABBREVIATION APH CCR DN FDF FO FSLL HH HS IDF LC LL LO PB PDSLL P&IDs PV S/D TSHH TSO DESCRIPTION Air Preheater Central Control Room Diameter Nominal, in (mm) Forced Draft Fan Failure Open Flow Switch Low Low High High Hand Switch Induced Draft Fan Locked Closed Low Low Locked Open Push Button Pressure Differential Switch Low Low Piping and Instrument Diagrams Pressure Valve Shut Down Temperature Switch High High Tight Shut Off UNITS This Standard is based on International System of Units (SI) except where otherwise specified. DESIGN CRITERIA Isolation The following paragraphs describe the installation standards and design practice for valves used for equipment isolation in emergency cases, including vessels, furnaces and compressors. Installation points of the isolation valves shall be clearly indicated on P&ID, highlighting the distance from the equipment to be protected.

Page 4 of 11 1. Vessels a. If the liquid volume in the vessel exceeds 10 m³ (calculated at normal liquid level with the addition of a tray and reboiler inventory in case of towers, and neglecting line inventory) and one or more of the following conditions exist, emergency isolation valves shall be provided on vessel outlet line below normal operating liquid level. i) Flammable liquid shall confirm to NFPA No. 30 as follows: Any liquid that has a closed-cup flash point below 38 C and a Reid vapor pressure not exceeding 275.8 KPa(abs) at 37.8 C, as determined by ASTM D 323, Standard Method of Test for Vapor Pressure of Petroleum Products (Reid Method), are classified as class I. Class I liquids are further classified as follows: - Class IA liquids those liquids that have flash points below 23 C and boiling points below 38 C. - Class IB liquids those liquids that have flash points below 23 C and boiling points at or above 38 C - Class IC liquids those liquids that have flash points at or above 23 C but below 38 C. ii) Liquids that are heated above their flash point. iii) Temperature is 260 C or higher. iv) Pressure is 1960 kpa(ga) or greater. b. The valve shall be located no farther than 9 meters measured horizontally from the side of the vessel. The total pipe length from the nozzle to the valve shall not exceed 15 meters. c. Valves shall be operable from grade or platform as follows: i) Access to a manually operated valve shall be considered acceptable if the valve can be operated from a platform no more than 6 meters above grade and access to the platform is by stairway. Access to the platform by ladder is not permitted ii) Valves having sizes DN 200 (8 inches) and smaller may be manually operated and may be fitted with extension spindles, angle drives and so forth, to fulfill the criteria of operability from grade. iii) Valves having sizes DN 250 (10 inches) and larger shall be electrically or pneumatically operated and controls shall be located in a place at grade safe from the danger of fire.

Page 5 of 11 d. If liquid on a side-draw flows into the bottom of a second vessel, such as a stripper and the total liquid in the draw-off pan plus that in the bottom of the second vessel exceeds 10 m³ and one or more of the four conditions noted in item 6.1.1.1 above exist, then an emergency isolation valve shall be installed on the bottom outlet line of the second vessel. e. Where a vessel outlet, within the scope of item 6.1.1.1 above is divided in a manifold system of branches (each with a valve), an emergency isolation block valve is not required if no more than two valves, meeting the requirements of item 6.1.1.3 above, are normally open, an emergency isolation block valve is required upstream of the manifold, if three or more valves are normally open. 2. Furnaces a. Fuel lines to process furnaces and steam boilers shall be provided with remotely operated emergency valves. These solenoid operated bubble tight shut off (TSO) valves shall be installed in each main furnace fuel line adjacent to the control valve. Operation shall be remote manual or automatic on closing and manual only opening. Loss of fuel or atomizing steam pressure shall also automatically close these valves. b. In addition to the above, a manually operated block valve shall be provided in each fuel line. This includes the pilot gas supply line if it is a separate line. These valves shall be located at least 15 meters horizontally from the furnace or boiler being protected. In some instance, a plant battery limit valve may be used to meet the above requirement. c. Atomizing steam lines to furnaces shall not be cut off automatically but shall be stopped by closing the pressure control valve on this line. d. Emergency valve on the snuffing steam line shall be located at least 15 meters horizontally from the furnace and operable from grade. e. Burner isolation valves from the main fuels and steam shall not be located under the heater and shall be arranged to be within arms length of the peep-holes enabling burner flames to be seen. f. The regulated pilot gas, where possible should be from an independent sweet gas supply or from a separate off-take on the fuel gas main (upstream of main fuel gas control valve) with its own spaded block valve. If continuous pilots are specified, additionally a solenoid operated shut-off valve shall be installed in the pilot gas line operated by emergency shutdown switch only. Low pressure alarm on pilot gas line shall also be fitted.