UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

Similar documents
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Culvert Safety Inspection Report

CHAPTER 5 CULVERT DESIGN

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

Cranes Roost Park Facility Analysis

Underwater Inspection of Bridges Overview of a Statewide Program

CLEANING, INSPECTION, AND TESTING OF SEWERS

Beavers are particularly adept at manipulating their

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Green CCR Surface Impoundment

PROPOSING A NEW PORTABLE DEVICE FOR BRIDGE SCOUR INSPECTION

DIVER INSPECTION REPORT Canyon South, Raw Water Tank

Amador Circle Tank. City of Rio Vista. Report of Findings From the Diving Operations Conducted on. March 28, 2011

High Definition Laser Scanning (HDS) Underwater Acoustic Imaging and Profiling

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

We re good at what we do! Anywhere, TX SITE

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

APPENDIX K CULVERT INSPECTION MEMO

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

APPENDIX J HYDROLOGY AND WATER QUALITY

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

7-1. The following devices will be discussed in this section:

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

With a team of highly qualified divers Vision offers a wide range of services including;

2012 Susitna River Water Temperature and Meteorological Field Study

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CONTENTS A. BEFORE USING B. SETTING THE TIME AND CALENDAR C. FUNCTIONS OF SOLAR POWERED WATCH

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

HOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

General Information for Culvert Design

Specifications for Synchronized Sensor Pipe Condition Assessment (AS PROVIDED BY REDZONE ROBOTICS)

Perched Box Caisson Overview. January 2014

January 25, Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid No Bid Date: 2/7/17 ADDENDUM NO 1

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.)

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

STREAM SURVEY File form No..

Fish Passage Assessment Report Mare Brook Culverts

MEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment.

FLOWMETERING STORAGE TANKS FROM THE INSIDE

Air Diving Inspection of ABC Mock-Up Caisson Project 123

Minimum Standards for Driveway Construction Village of Bear Creek

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

Bridge Failures in Alberta

Great Lakes Stream Crossing Inventory Instructions

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014

Selecting Flow Metering Sites And Evaluating Data

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

APPENDIX C DIVING. Section I. General

TM /AFM 88-5, Chap Underground hydraulic design Inlets UFC - Drainage In Areas Other Than Airfields

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

State DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10

Zebra Mussel Research Technical Notes

Fall Protection Checklist. Guardrail System

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Inspection & Maintenance

Illinois State Water Survey

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017

Nome Harbor Page 2 of 12

Access requests to County streets and roadways are processed through one of the following methods:

Components of a Barrage

As temporary grade control facilities along waterways until final stabilization is established.

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

APPENDIX A PHOTOGRAPHIC SUMMARY. RAINY RIVER PROJECT Final Environmental Assessment Report

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Experiment (13): Flow channel

PED (OLD TWNS RD) over OTTER TAIL RIVER

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Chutes Part 2: Synthetic linings

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Storm Damage Floating Culverts & Other Inlet Issues

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

CURI Pierside Stainless Diesel Tank

Culvert Design Basics

Transcription:

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY OCTOBER 25, 2012 PREPARED FOR MORRISON COUNTY PUBLIC WORKS BY COLLINS ENGINEERS, INC. JOB NO. 7423

MORRISON COUNTY PUBLIC WORKS UNDERWATER INSPECTION REPORT SUMMARY: The structure inspected, the East and West CMP culverts, were found to be in satisfactory condition with some defects of only minor structural significance. The steel of both culverts exhibited moderate surface corrosion on all exposed steel surfaces. The corrosion appeared to be more prevalent throughout the top portion (above the water surface) of the pipes. Apart from up to 1/8 inch deep pitting, no significant loss of section was noted throughout both pipes. The inspector-diver has sounded the culvert surface in multiple locations using hand tools, and the pipes appear solid with no hollow regions detected. Refer to Photographs 1 and 2 for typical condition of the culvert pipes. A sag was observed in the top of both culverts. The deflection appeared to reach a maximum displacement of 0.5 to 1 foot near the center of both culverts. The roadway above the culverts exhibited two cracks parallel to each pipe but showed no signs of settlement or displacement. The floor of both culverts was clear of any debris or silt infilling throughout the entire length. At the time of inspection the hydraulic capacity of the two culverts was not compromised by the deflected shape or any other obstructions. INSPECTION FINDINGS: (A) Both culverts were clear of any debris or channel bottom material build-up throughout the entire length. The channel bottom material upstream and downstream of both culverts consisted of soft organic material allowing a maximum probe rod penetration of 1 foot. (B) The exposed steel surfaces of both culverts exhibited moderate surface corrosion. The corrosion had a maximum of 1/8 inch loss of section. No areas of complete section loss or failed connections were observed.

(C) Both culverts exhibited a sag in the top (ceiling) at the CMP. The sag tapered from the ends of the culverts to the midpoint, where it had a maximum approximate displacement of 1 foot.

MORRISON COUNTY PUBLIC WORKS UNDERWATER INSPECTION 1. STRUCTURE DATA Feature Crossed: Rice Creek Feature Carried: Hawthorn Road Location: Morrison County Structure Description: The structure consists of two (2) corrugated metal pipe culverts measuring 70 feet long and 6 feet in diameter. 2. INSPECTION DATA Professional Engineer Diver: Barritt Lovelace, P.E. Dive Team: Lukas Janulis P.E., Marc B Parker Date: October 25, 2012 Weather Conditions: Cloudy, 50 o F Underwater Visibility: 1 foot Waterway Velocity: None / Negligible

3. WATERLINE DATUM Water Level Reference: Top of the West Culvert at the upstream opening. Water Surface: The waterline was approximately 1.6 feet below the reference. Maximum Water Depth at Substructure Inspected: Approximately 5.6 feet.

Photograph 1. View of the Steel Condition and Ceiling Sag in the West Culvert, Looking South. Photograph 2. View of the Steel Condition and Ceiling Sag in the East Culvert, Looking South.

MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF BRIDGES AND STRUCTURES DAILY DIVING REPORT INSPECTORS: Collins Engineers, Inc. DATE: October 25, 2012 ON-SITE TEAM LEADER: Barritt Lovelace, P.E. BRIDGE NO: N/A WEATHER: Cloudy, 50 o F WATERWAY CROSSED: Rice Creek (Pelkey Lake) DIVING OPERATION: X SCUBA SURFACE SUPPLIED AIR OTHER PERSONNEL: Lukas Janulis P.E., Marc B. Parker EQUIPMENT: Commercial Scuba, Probe Rod, Camera, Hand Tools TIME IN WATER: 3:50 P.M. TIME OUT OF WATER: 4:30 P.M. WATERWAY DATA: VELOCITY None / Negligible VISIBILITY 1 foot DEPTH 5.6 feet maximum at the West Culvert Downstream Opening. ELEMENTS INSPECTED: The East and West Culverts REMARKS: Overall, the structure inspected underwater was found to be in satisfactory condition with some defects of only minor structural significance. The steel of both barrels exhibited moderate corrosion on all exposed surfaces. An estimated 0.5 to 1 foot sag was observed in the top of both culverts. The sag reached a maximum deflection near the center of the culverts. The culvert pipes were clear of any debris and obstructions throughout the length of both culverts.