A Feasible Concept of Bi-axial Controlled DP for FPSOs in Benign Environment

Similar documents
A Feasible Concept of Bi-axial Controlled DP for FPSOs in Benign Environment

DESIGN AND CONTROL SESSION. A General Approach for DP Weathervane Control

Author s Name Name of the Paper Session. Positioning Committee. Marine Technology Society. DYNAMIC POSITIONING CONFERENCE September 18-19, 2001

CRITERIA OF BOW-DIVING PHENOMENA FOR PLANING CRAFT

ADAMS OFFSHORE SERVICES LIMITED, 5th Floor, Regent Center, Regent Road, Aberdeen, United Kingdom - AB11 5NS DPSV ADAMS AQUANAUT. DP Capability Plot

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5

Conventional Ship Testing

FMEA Proving Trials and Offloading Simulations

A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section

Offshore Oil and Gas Platforms for Deep Waters

Development of TEU Type Mega Container Carrier

The OTSS System for Drift and Response Prediction of Damaged Ships

HiLoad, Introducing DP to Standard Tankers

Effect of Wave Steepness on Yaw Motions of a Weathervaning Floating Platform

Dynamic Positioning Control Augmentation for Jack-up Vessels

A Feasibility Study on a New Trimaran PCC in Medium Speed

EVALUATING CRITERIA FOR DP VESSELS

ITTC Recommended Procedures Testing and Extrapolation Methods Loads and Responses, Seakeeping Experiments on Rarely Occurring Events

Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) 30-31,December, 2014, Ernakulam, India

Maneuverability characteristics of ships with a single-cpp and their control

STATION KEEPING EXTENSIVE MODEL TESTING OF A DRY-TREE SPREAD-MOORED BARGE IN BRAZILLIAN WATERS

STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS. Hans Cozijn

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Wind Turbine Shuttle. Ferdinand van Heerd

DP Ice Model Test of Arctic Drillship

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

FMEA Proving Trials and Offloading Simulations - Lessons Learned -

On the Challenges of Analysis and Design of Turret-Moored FPSOs in Squalls

Modelling of Extreme Waves Related to Stability Research

Abstract. 1 Introduction

THE BEHAVIOUR OF TUGS IN WAVES ASSISTING LNG CARRIERS DURING BERTHING ALONG OFFSHORE LNG TERMINALS

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

1. A tendency to roll or heel when turning (a known and typically constant disturbance) 2. Motion induced by surface waves of certain frequencies.

Planning of Drilling Operations in Extreme Ocean Currents

Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves

WIND LOADS / MOORING & FISH TAILING. Arjen Koop, Senior Project Manager Offshore Rogier Eggers, Project Manager Ships

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

ZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES

Dynamic Positioning: Method for Disaster Prevention and Risk Management

EXPERIMENTAL STUDY ON THE HYDRODYNAMIC BEHAVIORS OF TWO CONCENTRIC CYLINDERS

Deepwater Floating Production Systems An Overview

APPENDIX D. Assessment of Ship Impact Frequencies

Proceedings of Meetings on Acoustics

Towing support tool and object drift at sea

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

Abstract. 1 Introduction

RESPONSE BASED WEATHER-ROUTING AND OPERATION PLANNING OF HEAVY TRANSPORT VESSELS

RIGID RISERS FOR TANKER FPSOs

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool

"---" ""-' "'- OTC Wave Direction Feed-Forward on Basis of Relative Motion Measurements To Improve Dynamic Positioning Performance

S0300-A6-MAN-010 CHAPTER 2 STABILITY

ITTC Recommended Procedures and Guidelines

Design Aspects of a DP System for FPSO Applications in the GOM

A Novel Platform for Drilling in Harsh High-Latitude Environments.

Chapter 2 Hydrostatics and Control

Challenges in estimating the vessel station-keeping performance

The Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration. M. Burak Şamşul

DYNAMIC POSITIONING CONFERENCE October 7-8, New Applications. Dynamic Positioning for Heavy Lift Applications

Marine Technology Society

WATER HYDRAULIC HIGH SPEED SOLENOID VALVE AND ITS APPLICATION

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL

Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2010

Wave Forces on a Moored Vessel from Numerical Wave Model Results

OMAE INVESTIGATION ON THE USE OF DIFFERENT APPROACHES TO MOORING ANALYSIS AND APPROPRIATE SAFETY FACTORS

Integrated control system for ship motion in inland navigation

THE USE OF A VERTICAL BOW FIN FOR THE COMBINED ROLL AND YAW STABILIZATION OF A FAST PATROL BOAT

Marine Technology Society

THE USE OF ENERGY BUILD UP TO IDENTIFY THE MOST CRITICAL HEELING AXIS DIRECTION FOR STABILITY CALCULATIONS FOR FLOATING OFFSHORE STRUCTURES

1. Outline of the newly developed control technologies

Journal of Chemical and Pharmaceutical Research, 2016, 8(6): Research Article. Walking Robot Stability Based on Inverted Pendulum Model

A NEW GOLF-SWING ROBOT MODEL UTILIZING SHAFT ELASTICITY

OIL & GAS. MTS DP Committee. Workshop in Singapore Session 4 Day 2. Unwanted Thrust

Dynamic analyses of tankers moored at berth

MANOEUVRING BOOKLET V1.06

Preliminary Design Review (PDR) Aerodynamics #2 AAE-451 Aircraft Design

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at

Roll Stabilisation at Anchor: Hydrodynamic Aspects of the Comparison of Anti-Roll Tanks and Fins

Physical Model for the Filling and Emptying System of the Third Set of Panama locks

Improving Cost Efficiency of DP Operations by Enhanced Thruster Allocation Strategy

Title. Author(s)Yabuki, Hideo; Yoshimura, Yasuo; Ishiguro, Tsuyoshi; Issue Date Doc URL. Type. File Information

Body Stabilization of PDW toward Humanoid Walking

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

Station Keeping Capacity of a Moored Structure with Heading Control in Level Ice

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

Dynamic Stability of Ships in Waves

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE

DAMAGE STABILITY TESTS OF MODELS REPRESENTING RO-RC) FERRIES PERFORMED AT DMI

Potential of Fast Time Simulation for Training in Ship Handling Simulators and for Decision Making On-Board Ships

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT

for Naval Aircraft Operations

Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations

An Investigation into the Capsizing Accident of a Pusher Tug Boat

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

Performance of SSTH-70 after Delivery and Future of SSTH Masahiro Itabashi, Ryoji Michida Ishikawajima-Harima Heavy Industries Co.,Ltd.

OFFICIAL MESSAGE CIRCULAR

Transcription:

Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE September 28-3, 24 DP Design & Control System for FPSOs in Benign Environment Onno A.J. Peters Jaap-Harm Westhuis IHC Gusto Engineering BV (Netherlands) Jo. A. Pinkster Delft University of Technology (Netherlands)

ABSTRACT The idea of dynamic positioning using bi-axial control to reduce the power requirements was introduced and tested already in the late 198s by Pinkster and Davison. The basis of this control is that the vessel is freely weathervaning, similar to single point moored vessels. This type of control is also called weathervaning DP. It must not be confused with the weathervaning mode of normal DP vessels, since bi-axial DP is a passive heading control. Computational simulations, model tests and full-scale tests have shown in the past that this principle is reliable, results in stable DP control and minimizes power consumption. For deep water, DP systems can provide a flexible and cost-effective station keeping solution compared to conventional moored systems. Recent studies have shown such a feasible and costeffective design of a DP-FPSO with a conventional DP system in relative mild conditions. Compared to a mooring system, a DP controlled FPSO becomes cost-effective, when field installation-time and installation-costs are reduced, and thus earlier production revenues can be made. By applying bi-axial control, reduction of investment in DP equipment and reduction of operational costs are possible compared to conventional DP control. Combining well-established technologies, proven technical solutions, state of the art design practice and DP design experience, a feasible and cost-effective FPSO with bi-axial DP control has been designed. This paper outlines the theoretical hydrodynamic background and technical naval design aspects of the bi-axial DP controlled FPSO. A comparison is made with conventional DP control and with a conventional single point mooring system. Dynamic Positioning Conference September 28-3, 23 Page 1

INTRODUCTION The concept of bi-axial DP control has been investigated already in the late 198 s (ref. [1] and [2]), based on ideas presented in ref. [3].It proved to be a feasible and reliable dynamic positioning solution. Computational simulations (ref. [1]), model tests (ref. [2]) and full scale tests (ref. [4] and [5]) showed the possibility to keep position and significant reduction of power consumption. However, it has never been applied to large vessels. In the 198 s use of dynamic positioning increased rapidly, since it was introduced in the 196 s. Initially DP systems were applied to relative small vessels like survey/exploration ships and to larger ships such as the drill ships. Since the late 198 s, the size of DP vessels increased only slightly from a displacement in the order of 13, DWT to a displacement in the order of 154, DWT today. This was possible due to development of new thruster types and increasing thruster size, larger E-motors and generator-sets, better electrical power control technology and computerization. Due to availability of different types of and/or larger thrusters, DP control is becoming feasible for large vessels too. With the development of oil fields in deeper water, the relative investment costs of passive mooring systems have increased substantially. Especially for marginal fields or fields where relocation is required, the hardware and installation costs can be significant. A DP system can provide a reliable and cost-effective solution. Recent years, numerous DP-FPSO design studies and investigations have been performed, but still there is only one FPSO with full DP (being the SEILLEAN). This paper deals with the theoretical background, vessel and DP system design, power minimization and areas of application of bi-axial DP for large FPSO s. Designs for Brazilian and West African waters are presented, showing the feasibility of bi-axial DP for mild environment with strong squall events. This paper is intended to lecture about the DP solutions and not to answer the question whether to choose a mooring or a DP system. Figure 1: SEILLEAN in full operation Dynamic Positioning Conference September 28-3, 23 Page 2

THEORETICAL BACKGROUND Modern DP control systems can be divided in two separate functions: 1. Control based on feed back of position measurement 2. Control based on measurement/estimate of the environmental forces The control system usually relies on the first function, which is the so-called PDI-control. The second function is often called the KALMAN-control, containing a mathematical model of the vessel behavior and signal filters. Conventional DP systems are designed to keep the control point of a vessel on a desired position (x d, y d ) and at a desired heading (ψ d ), i.e. the system is controlling the earthbound position and heading. This is a triple-axis control, consisting of two translation axes and one rotation axis. The equations for the PDI-control algorithm for this triple axis control are: F F M x, req y, req ψ, req = P x = P y = P ψ x + D x y + D y ψ + D x& + I y& + I ψ x y ψ& + I ψ x dt y dt ψ dt (1) (2) (3) Unless minimization of wave frequent motions is desired, there is no need for heading control and thus the vessel may weathervane freely. Most DP systems have the availability of weathervaning mode to minimize thruster power usage. In principle, the optimum heading is found when the combination of mean environmental forces in x- and y-direction and the mean environmental heading moment are resulting in a minimized thrust allocation. For simplicity, the optimum heading is often defined as the heading at which the mean environmental heading moment becomes zero. By changing the desired heading the heading of the vessel is still actively controlled. Thus, it is still a triple-axes control. In principle, it is impossible to measure all the environmental components. Normally, only wind speed and wind direction are measured directly. Based on a wind coefficient database, the longitudinal and transverse wind force and wind moment are then estimated. The database should contain coefficients for different vessel loading conditions. This is the so-called wind feed forward system. In recent years a reliable and accurate system has been developed to estimate the wave drift forces and predict the sea-state, wave direction and spreading (ref. [6]); however this system is not yet commercially available. This so-called wave feed forward system can significantly reduce the dynamic offset and/or reduce the fuel consumption. Also systems to measure the surface current are in existence (ref. [7]). Estimate of the optimum heading may be based on the KALMAN-control. The KALMAN-control compares the actual measured position with a model prediction. Based on the difference between the measured and predicted position, the environmental forces and moment is predicted. The KALMAN-control performs better when wind, wave and current measurements can be used as input. Another frequently used method is to compute the optimal heading by monitoring the obtained thrust forces in x- and y-direction and obtained thrust moment. However, these two methods generally react slowly on rapid changes of environmental conditions. To effectively control the heading (i.e. to obtain M ψ,req ) opposing transverse forces at each end of the vessel should be applied. However this contradicts with the required transverse force F y,req. This implies that power is used to control the heading, and thus installation of thruster power is needed which is not always used effectively. Dynamic Positioning Conference September 28-3, 23 Page 3

To reduce the installed power and costs, the bi-axial control was introduced. This was done by placing all thrusters in the fore ship at a specified distance from the vessel longitudinal center of gravity. The control algorithm for required moment (eq. 3) is changed to: M F COT (4) ψ, req = y, req x The parameter COT x is short for the center of thrust, in principle being the weighted center of the thruster. By concentrating the thrusters at one end of the vessel and applying bi-axial control, a system is created which can be compared with single point moored systems. For single point moored systems fishtailing can be an issue. It also may be a problem for bi-axial DP control, however in lesser extend because of active control instead of passive reaction at the mooring point. Fishtailing occurs when instability or low stability around the equilibrium mean heading and/or low yaw rate damping is present. If the stability issue can not be solved and yaw rate damping is low, damping can be created with thrusters in the aft ship. The same could be done for bi-axial DP, where the amount of damping can be controlled by the derivative part of eq. 3. This would result in: M ψ = F COT + Dψ ψ&, req y, req x (5) Requirement of additional damping depends on selection of COT, Center of Rotation (COR) and P-D-I coefficients. Also it should only be applied when analysis shows that the installed power or power usage is less than without yaw damping or that the system does not react too slowly on rapid changes of the environment. In conventional DP, the control point or Center of Rotation (COR) is normally chosen at the longitudinal center of gravity. For bi-axial DP, the COT is a more obvious choice for the COR. However, another location (both in longitudinal and transverse direction) may also be chosen with the restriction that the bi-axial DP may become unstable when the COR is chosen too far aft. Also, the lower the stability the more action may be required from the thruster system, as was concluded in ref. [1] and [3].This also becomes clear when looking at a pendulum as presented in figure 2. In this figure the trolley represents the COR and the spring represents the thrusters (COT). The square represents the center of external force, which normally lies close to the longitudinal center of gravity. For the pendulum, only the gravity force takes effect. This figure clarifies that the pendulum will stabilize to a unique equilibrium position when the center of rotation is above the center of gravity (fig. 2a), whereas the unstable pendulum may end up in oscillating motion or an unfavorable equilibrium position. g c g Figure 2a: Stable Pendulum Figure 2b: Unstable Pendulum Dynamic Positioning Conference September 28-3, 23 Page 4

FPSO CONCEPTS The feasibility of bi-axial DP of two concepts has been investigated. The first concept is based on an early production DP-FPSO for Brazilian waters (ref. [8], figure 3). The second concept is based on a new-built FPSO with an external turret. Both concepts were developed within the IHC Caland Group. Concept 1 Figure 3: Early production DP-FPSO concept (conventional DP) The DP-FPSO, proposed for operations offshore Brazil, is based on the conversion of an existing Suezmax oil tanker. The vessel particulars are presented in table 1. In the initial concept a conventional DP system was applied. A bi-axial DP system is applied to this concept to investigate the difference in installed thruster power and the difference in dynamic behavior, with the aim to further reduce conversion/investment costs and/or operation costs. Since, bi-axial DP requires the COR to be forward of the amidships, the general lay-out is changed. The general lay-out of the DP-FPSO is shown in figure 5. The moonpool and riser installation derrick are placed just 7 m forward of the longitudinal center of gravity, instead of -35 m aft of LCG in the conventional DP concept. This position is not selected more forward to restrict the vertical motion and thus the heave compensation requirements. Consequently, the riser storage and handling equipment and parts of the process are shifted. In the original conventional DP concept (ref. [8]) 6x2.7MW retractable azimuth thrusters were added, of which two were placed between the engine room and the cargo tanks and four were placed in the fore ship. The existing main propulsion and tunnel thrusters were required to be used by the DP system. For the bi-axial concept only 4x3.6MW retractable azimuth thrusters are placed in the fore ship. That is in total 14.4 MW added thruster power instead of 16.2 MW in the original conversion concept. The existing thruster system is also used. The rudder is not used during DP. By applying a small amount of heading damping (eq. 5) and using the aft tunnel thruster to generate the damping, it is possible to use 4x3.6MW azimuth thrusters instead of 4x4.MW. Dynamic Positioning Conference September 28-3, 23 Page 5

Conversion costs are reduced, since no thrusters are required in the aft pump room. Conversion work is only required in the forward hold. Also the investment cost of the thruster system is expected to be reduced, since the CAPEX vs. thruster power ratio is expected to be lower for larger thruster systems. The thruster system exists of the thruster, the drive, the control system (like frequency converter) and the retrieval system. Concept 2 The second concept is a new-built FPSO sized in the order of 2 million barrels storage capacity, intended for West of African areas. For these areas, large FPSO s are fitted with either spread mooring or single point mooring systems. Selection between these two systems is largely based on capital costs of the mooring system and motional behavior of the FPSO. Especially the swell condition (i.e. long period waves) can have a crucial influence on the selection. For this concept, favorable motion characteristics are found, making it possible to select a single point mooring system. Consequently, also a bi-axial DP system can be feasible. Especially for large water depth, such a system can be competitive with a single point moored system. The new-built FPSO concept is fitted with an external riser turret system. The FPSO is equipped with 6x3.6MW retractable azimuth thrusters (i.e. 21.6MW installed thruster power). The vessel particulars are presented in table 1. Only the minimum draft condition is investigated, since wind loading is expected to be governing above the wave drift and current loads, especially during the squall events. The lay-out of this concept is shown in figure 6. table 1 Concept 1 Concept 2 Length Lpp 233. 27. m Length Loa 245.6 Breadth 42.5 58. m Depth 21. 32. m Draft 12.5 9.4 m Displacement 16, 14, t Crude oil storage capacity (approx.) 6, 2,, bls Longitudinal center of gravity (LCG) 124.5 135. m Center of Rotation wrt. LCG 7. 152. m Center of Thrust wrt. LCG 85.7 13. m Environmental conditions To verify the feasibility of bi-axial DP, 9 measured squall events are simulated for both concepts. The squall events are shown in figure 4. During all squall events the wind velocity increases to 28 m/s and is shifting such that the direction is 18 (for axes convention figure 7) when the maximum wind velocity is reached. For concept 1, the 9 squall events are combined with seastates belonging to an averaged wind speed (i.e. average over the wind speed before and after the squall event). In addition, concept 1 is to be able to operate in a 1-year return Brazilian condition with an offset accuracy within 6% of the water depth. For concept 2, the 9 squall events are combined with a 1 year West-African swell condition. Spreading of the environment is applied. Details of the environmental conditions are given in table 2. Dynamic Positioning Conference September 28-3, 23 Page 6

table 2 α wave α wind 1) α current Hs Tp γ V 3) wind before aft V current deg deg deg m s - m/s m/s squall 1 17 18 9 4. 8.3 1. 1. 1. 1.4 squall 2 12 135 45 4. 8.3 1. 1. 1. 1.4 squall 3 15 16 45 4. 8.3 1. 1. 1. 1.4 squall 4 195 185 27 5.2 9.3 1. 1. 12.8 1.4 squall 5 12 13 45 1.2 5. 1. 5. 5. 1.4 squall 6 27 26 27 3.7 7.9 1. 5. 14.2 1.4 squall 7 24 35 225 2.4 6. 1. 5. 1. 1.4 squall 8 24 31 27 1.2 5. 1. 5. 5. 1.4 squall 9 135 14 9 4. 8.3 1. 1. 1. 1.4 1-year Brazilian Con. 145 16 2) 295 5.7 13.7 1.6 19.6 n/a 1.4 1 - year WoA Swell 4) 3.8 16. 6. 4).4 1) shifting wind direction 2) constant wind direction 3) maximum squall wind speed is 28 m/s 4) related to squall events 3 25 Squall 1 315 27 3 25 Squall 2 315 27 3 25 Squall 3 315 27 2 15 225 18 2 15 225 18 2 15 225 18 1 5 135 9 1 5 135 9 1 5 135 9 Wind speed in m/s -2-1 1 Squall 4 3 315 25 27 2 225 15 18 1 135 5 9-2 2 Squall 7 3 315 25 27-1 1 2 45 Squall 5 3 315 25 2 15 1 5 27 225 18 135 9-2 2 Squall 8 3 315 25 27-2 2 4 45 Squall 6 3 315 25 2 15 1 5 27 225 18 135 9-1 1 2 45 Squall 9 3 315 25 27 Wind direction in deg 2 15 225 18 2 15 225 18 2 15 225 18 1 5 135 9 1 5 135 9 1 5 135 9-1 1 2 45-4 -2 2 45 Time in s -1 1 2 45 Figure 4: Squall events Dynamic Positioning Conference September 28-3, 23 Page 7

SIMULATIONS The DP simulations are carried out with in-house developed software. This DP simulation model is based on the low frequent equations of motion, the high frequent basic motion are superimposed based on Response Amplitude Operators. Furthermore, the model is using a wave drift force estimate based on the full quadratic transfer function (QTF). The full QTF is found from 3-D diffraction theory. The KALMAN control is not included in the simulation model. The wind loading is based on estimates of the wind coefficients using a building block method. This building block method takes into account shielding effects and input of different hull types, lattice structures and (tapered) cylinders or blocks are possible. The simulations are carried out without wind feed forward. The current force coefficients are based on OCIMF data (ref. [9]). The results of the simulations are presented in plots showing the extreme vessel positions, starting position and average position. The extreme positions consist of the minimum and maximum earth fixed position of the COR and of the heading. Also shown are the extreme COG locations, the time trace of COR and the maximum radial offset. Results Concept 1 The 9 simulated squall events are shown in figures 8 and 17. For the worst squall event, in terms of offset and thruster loading, an additional simulation is carried out to simulate a single thruster failure at a critical moment in time, just before maximum thruster power is required. This failure event is shown in figure 11 and can be compared to the intact condition shown in figure 12. Figures 18 and 19 are showing that the bi-axial concept is able to stay on position in the 1-year return Brazilian condition. For the intact case the maximum radial offset is approximately 27.2 m. In case just before the maximum offset event a single azimuth thruster is failing, the maximum offset becomes approximately 36.2 m. With the maximum offset limit of 6% of the water depth, this implies that the early production vessel is able to operate in water depth larger than approximately 6 m. Comparable results are found for the conventional DP concept, see figures 2 and 21. These figures show the behavior assuming that the conventional system is able to find and keep the optimum heading defined as the heading for which the required thrust moment is zero. This heading is 36, whereas an average heading of approximately 27 is found for bi-axial DP. Results Concept 2 The simulation results of the 9 squall events are presented in figures 22 to 3. The simulations are performed for a 3-hour real-time duration. During the squall events a single thruster failure is simulated, leaving the DP system with 5 thrusters. The failure occurs just before maximum thruster power is required. The largest offset is found during squall event 2, being approximately 2.5 m. This implies that this concept is able to operate in a water depth larger than approximately 15 m, assuming an allowable 15% of the water depth. Dynamic Positioning Conference September 28-3, 23 Page 8

CONCLUSIONS Application of bi-axial DP is investigated for two FPSO concepts. For the early production FPSO concept a reduction of the installed thruster power and conversion cost is achieved by applying bi-axial DP instead of conventional DP. Both early production FPSO concepts showed comparable results in terms of motional behavior (heave, roll and pitch), positioning accuracy and mean power consumption. For West African waters, a feasible bi-axial DP 2mln barrel FPSO concept with an external turret is made, requiring only 21.6MW of installed thruster power. The installed power is required to be able to keep position during squall events, with the possibility of a single thruster failure. During normal operations a very low power demand is found. Such a thruster system can be very competitive with a mooring system. A bi-axial DP system is able to react passively on large and rapid environmental changes (like squall events), without the requirement of algorithms determining the best heading during these events. Dynamic Positioning Conference September 28-3, 23 Page 9

REFERENCES [1] Pinkster, J.A., Nienhuis, U.: Dynamic Positioning of Large Tankers at Sea, OTC paper 528, Offshore Technology Conference, Houston 1986 [2] Davison, N.J., Thomas, N.T., Nienhuis, U., Pinkster, J.A: Application of an Alternative Concept in Dynamic Positioning to Tanker Floating Production System, OTC paper 5444, Offshore Technology Conference, Houston 1987 [3] Pinkster, J.A.: Dynamic Positioning of Vessels at Sea, Paper No. 15, Course and Lectures at the Department of Experimental Methods in Mechanics, CISM, Udine, Marin Publication No. 419, October 1971 [4] Pinkster, J.A., Hagiwara, H., Shoji, R., Fukuda, H.: A Study on Weathervaning Dynamic Positioning System, Delft University of Technology Report 121-P, September 1999, Delft, the Netherlands and Journal of Japan Institute of Navigation, Vol. 11, September 1999, pp 83-93 [5] Hagiwara, H., Shoji, R., Fukuda, H., Pinkster, J.A: Onboard Experiments on Weathervaning Dynamic Positioning /tracing and Automatic Berthing, Delft University of Technology, Report 1293-P and Proceedings of the 7th Int. Conference on Methods and Models in Automation and Robotics, MMAR 21, 28-31 August 21, Miedzyzdroje, Poland [6] Aalbers, A (MARIN): Wave feed forward DP and analysis of the effect on Shuttle Tanker Operation, Dynamic Positioning Conference, September 24 [7] Jan van Smirren, Caroline Nicholas, Cathy Primrose (Fugro GEOS, RD Instruments Inc.): A Surface Current Measurement System to Support DP Operations, Dynamic Positioning Conference, September 23 [8] Poldervaart, L., Cann, B. van, Westhuis, J.: A DP-FPSO as a First-Stage Field Development Unit for Deepwater Prospects in Relative Mild Environments, OTC paper 16484, May 24 [9] Oil Companies International Marine Forum (OCIMF): Prediction of Wind and Current Loads on VLCC s, 1994 Dynamic Positioning Conference September 28-3, 23 Page 1

Figure 5: General lay-out Concept 1 - early production FPSO with bi-axial control Dynamic Positioning Conference September 28-3, 23 Page 11

Figure 6: General lay-out of Concept 2 - new-built 2mln barrel FPSO Dynamic Positioning Conference September 28-3, 23 Page 12

Figure 7: Axes convention Dynamic Positioning Conference September 28-3, 23 Page 13

15 1 Bi-axial, COT=85.7m COR=7.m, squall 1, wa:17 sq:18 cu: 9 max radial offset:6.5 [m] 15 1 Bi-axial, COT=85.7m COR=7.m, squall 4, wa:195 sq:18 cu:27, intact 5 5-5 -5-1 -15-15 -1-5 5 1 Figure 8: Concept 1 biaxial squall event 1-1 -15 max radial offset:11. [m] -15-1 -5 5 1 Figure 11: Concept 1 biaxial squall event 4, intact 15 1 5 Bi-axial, COT=85.7m COR=7.m, squall 2, wa:12 sq:18 cu: 45 max radial offset:13.3 [m] Bi-axial, COT=85.7m COR=7.m, squall 4, wa:195 sq:18 cu:27, single failure 15 1 5-5 -5-1 -15-15 -1-5 5 1 Figure 9: Concept 1 biaxial squall event 2-1 -15 max radial offset:16.9 [m] -15-1 -5 5 1 Figure 12: Concept 1 biaxial squall event 4, failure 15 1 Bi-axial, COT=85.7m COR=7.m, squall 3, wa:15 sq:18 cu: 45 max radial offset:8.3 [m] 15 1 Bi-axial, COT=85.7m COR=7.m, squall 5, wa:12 sq:18 cu: 45 5 5-5 -5-1 -15-15 -1-5 5 1 Figure 1: Concept 1 biaxial squall event 3-1 -15 max radial offset:15.1 [m] -15-1 -5 5 1 Figure 13: Concept 1 biaxial squall event 5 Dynamic Positioning Conference September 28-3, 23 Page 14

15 1 Bi-axial, COT=85.7m COR=7.m, squall 6, wa:27 sq:18 cu:27 15 1 Bi-axial, COT=85.7m COR=7.m, squall 9, wa:135 sq:18 cu: 9 max radial offset:4.4 [m] 5 5-5 -5-1 -15 max radial offset:7.6 [m] -15-1 -5 5 1 Figure 14: Concept 1 biaxial squall event 6-1 -15-15 -1-5 5 1 Figure 17: Concept 1 biaxial squall event 9 15 Bi-axial, COT=85.7m COR=7.m, squall 7, wa:24 sq:18 cu:225 1 5-5 -1-15 max radial offset:6.5 [m] -15-1 -5 5 1 Figure 15: Concept 1 biaxial squall event 7 15 Bi-axial, COT=85.7m COR=7.m, squall 8, wa:24 sq:18 cu:27 1 5-5 -1-15 max radial offset:8.2 [m] -15-1 -5 5 1 Figure 16: Concept 1 biaxial squall event 8 Dynamic Positioning Conference September 28-3, 23 Page 15

15 Bi-axial, COT=85.7m COR=7.m, 1-year, wa:14 wi:16 cu:295, intact Conventional DP, COR=-35m, 1-year, wa:14 wi:16 cu:295, zero required moment, intact 15 1 1 5 5-5 -1-15 max radial offset:27.6 [m] -15-1 -5 5 1 Figure 18: Concept 1 biaxial, intact, Brazil -5-1 max radial offset:19.7 [m] -1-5 5 1 15 Figure 2: Concept 1 conventional, intact, Brazil 15 Bi-axial, COT=85.7m COR=7.m, 1-year, wa:14 wi:16 cu:295, single failure Conventional DP, COR=-35m, 1-year, wa:14 wi:16 cu:295, zero required moment, single failure 15 1 1 5 5-5 -1-15 max radial offset:36.2 [m] -15-1 -5 5 1 Figure 19: Concept 1 biaxial, failure, Brazil -5-1 max radial offset:42. [m] -1-5 5 1 15 Figure 21: Concept 1 conventional, intact, Brazil Dynamic Positioning Conference September 28-3, 23 Page 16

2 15 1 COT=99m COR=152m, 1yr swell+squall 1, wa:17 sq:18 cu: 9 max radial offset:5.5 [m] 2 15 1 COT=99m COR=152m, 1yr swell+squall 4, wa:195 sq:18 cu:27 max radial offset:2. [m] 5 5-5 -5-1 -1-15 -15-2 -35-3 -25-2 -15-1 -5 5 1 Figure 22: Concept 1 squall event 1-2 -35-3 -25-2 -15-1 -5 5 1 Figure 25: Concept 2 squall event 4 COT=99m COR=152m, 1yr swell+squall 2, wa:12 sq:18 cu: 45 COT=99m COR=152m, 1yr swell+squall 5, wa:12 sq:18 cu: 45 25 2 15 max radial offset:1.8 [m] 25 2 15 max radial offset:6.8 [m] 1 5 1 5-5 -5-1 -1-35 -3-25 -2-15 -1-5 5 1 Figure 23: Concept 2 squall event 2-35 -3-25 -2-15 -1-5 5 1 Figure 26: Concept 2 squall event 5 25 2 15 COT=99m COR=152m, 1yr swell+squall 3, wa:15 sq:18 cu: 45 max radial offset:7.5 [m] 1 5 COT=99m COR=152m, 1yr swell+squall 6, wa:27 sq:18 cu:27-5 1 5-5 -1-35 -3-25 -2-15 -1-5 5 1 Figure 24: Concept 2 squall event 3-1 -15-2 -25 max radial offset:8.1 [m] -3-35 -3-25 -2-15 -1-5 5 1 Figure 27: Concept 2 squall event 6 Dynamic Positioning Conference September 28-3, 23 Page 17

1 COT=99m COR=152m, 1yr swell+squall 7, wa:24 sq:18 cu:225 5-5 -1-15 -2-25 max radial offset:2.5 [m] -3-35 -3-25 -2-15 -1-5 5 1 Figure 28: Concept 2 squall event 7 1 COT=99m COR=152m, 1yr swell+squall 8, wa:24 sq:18 cu:27 5-5 -1-15 -2-25 max radial offset:7.9 [m] -3-35 -3-25 -2-15 -1-5 5 1 Figure 29: Concept 2 squall event 8 COT=99m COR=152m, 1yr swell+squall 9, wa:135 sq:18 cu: 9 25 2 15 max radial offset:5.7 [m] 1 5-5 -1-35 -3-25 -2-15 -1-5 5 1 Figure 3: Concept 2 squall event 9 Dynamic Positioning Conference September 28-3, 23 Page 18