AFE WO ETHOD TATEENT (Part 1) Work Activity ocation of Work Activity Personnel qualifications & experience required Engineering details / certificates / WorkCover approvals required egislation, Codes of Practice, tandards applicable: ervicing and aintenance of EWP s Various Clients ites elevant trade qualification with industry experience. Genie Employee nduction and on the job training. Current relevant Drivers licence. pecific ine nduction (f equired). Contact Chris Bond 0409 067 467 A2550.10 afe use of EWP s NW Occupational Health & afety Act 2000 VC Occupational Health & afety Act 1985 QD Workplace Health & afety Act 1995 A Occupational Health, afety & welfare Act 1986 WA Occupational Health & afety Act 1984 upervision & inspection to be provided: Training & instruction to be provided (eg manual handling, working at heights, etc.) Plant & equipment to be used: aintenance checks to be performed on plant & equipment: Protective equipment to be used: Genie supervisor onsite. ite supervisor This W. anual Handling Basic EWP Training pecific site induction (f equired) Various types of EWP s. ervice Vehicle, Tools of the Trade ifting Chains, lings. Other manual handling aids as required. efer anufacturers ervice pecs and A2550.10. All personnel to wear supplied high visibility uniform or afety Vest Warning signs & control measures: Any other site specific requirements, as per site induction Page 1 of 5 W-ervicing & aintenance of EWP s ssue Date: 17/07/2013
Details of emergency procedures: ist of attachments: Genie Contact Chris Bond As per specific ine site emergency procedures N/A Prepared by eviewed by Approved by Name: John Yannakopoulos Name: Chris Bond Name: (Genie T) ole: OH Consultants ole: WHA ole: Date: 10/12/2012 Date: 10/12/2012 Date: The following list of Personnel may attend the project. NAE POTON GNATUE These personnel have all read and understood the conditions of this afe Work ethod tatement isk atrix Consequence ikelihood Negligible inor oderate ajor Catastrophic Almost Certain ow oderate High Extreme Extreme ikely ow ow oderate High Extreme Possible Very ow ow oderate High Extreme Unlikely Very ow ow ow oderate Extreme are Very ow Very ow Very ow oderate High This document has been prepared and developed in consultation with our employees using the Genie isk anagement Policy, Procedures and Principles. Page 2 of 5 W-ervicing & aintenance of EWP s ssue Date: 17/07/2013
AFE WO ETHOD TATEENT (Job afety Analysis Worksheet)Part 2 JOB EQUENCE HAZAD DENTFCATON AE THE CONTO THAT W BE UED (afe Work Procedures) Drive to and access work area Vehicle to vehicle / mobile plant collision Vehicle / obile plant to person collision Vehicle rollover lip / Trip/ Falls - Obey traffic signage - Drivers must be licensed - Drive to site rules, site and terrain conditions - Be aware that there are mobile plant, heavy vehicles moving around the site and may appear without warning - Do not block roads/ throughways when parking a vehicle or mobile plant - Vehicle to contain first aid kit and fire extinguisher - Personnel are not to use handheld mobile phones whilst driving - Personnel are to wear seatbelts at all time in vehicle and plant - Be aware of slips trips hazards at all locations on the site due to uneven ground, occasionally wet conditions, construction waste to be collected, reinforcing bar not covered by concrete earthworks - Personnel are to use 3-point contact when climbing ladders, entering and exiting mobile plant - All personnel must sign the Take 5 (if separate from JA card) and JA card indicating that they understand and will work to the direction of the W - All personnel will not do anything they feel is unsafe and refer the matter to their leading hand, supervisor or foreman - All personnel will wear the site PPE as a minimum and extra PPE for specialist tasks as directed by the tasks mandatory control. Driver All personnel Area foreman Page 3 of 5 W-ervicing & aintenance of EWP s eva1 ssue Date: 10/12/2012. ev Date: 10/12/2012.
JOB EQUENCE HAZAD DENTFCATON AE THE CONTO THAT W BE UED (afe Work Procedures) tart and run EWP. Damage to equipment / personnel due to incorrect start up / operation procedure. All employees are to undergo basic AWP training and sufficient on the job training prior to setting up AWP s. anager Hearing loss due to high noise levels. Always wear hearing protection when running engines. Personnel injury due to rotating machinery. H eep well clear of rotating parts, all rotating parts to be guarded Personal injury due to hot oils / heated water from pump / pipe work or turbo and exhaust Environmental hazard fuel / oil spill. Use gloves when working near hot surfaces Check the surface temperature of engines before opening hose clamps. Oil leaks and fuel spills to be cleaned up immediately. ervicing of EWP. Vehicle to vehicle / mobile plant collision. Obey traffic signage Drivers must be licensed Drive to site rules, site and terrain conditions Be aware that there are mobile plant, heavy vehicles moving around the site and may appear without warning Hearing loss due to high noise levels. lip / Trips / Falls. Always wear hearing protection when running engines. Be aware of slips, trips & hazards at all locations on the site due to uneven ground, wet conditions and construction waste. Personnel are to use 3-point contact when climbing ladders, entering and exiting mobile plant or working on uneven and slippery surfaces Page 4 of 5 W-ervicing & aintenance of EWP s eva1 ssue Date: 10/12/2012. ev Date: 10/12/2012.
JOB EQUENCE HAZAD DENTFCATON AE THE CONTO THAT W BE UED (afe Work Procedures) ervicing of EWP. (Continued) Dehydration / heat stress / sunstroke. Wear sun protection equipment and sunscreen, ensure drinking water is available and abide by the specific site induction. Environmental hazard fuel / oil spill. Drip trays to be used when servicing pumps to contain oil All fitters are to carry spill kits in service vehicles All used and contaminated oil is to be contained and removed from site anual handling / back muscle Crush / pinch injuries. Ensure that correct anual Handling technique is used. anual Handling aids to be used where available Damage to equipment / personnel due to incorrect start up / operation procedure. Personal injury due to hot oils / heated water from EWP or turbo and exhaust Only Trade qualified fitters are to service AWP s. efer operating instructions. efer manufacturer s service and operating instructions Use gloves when working near hot surfaces Check the surface temperature of EWP before opening hose clamps, wear gloves Page 5 of 5 W-ervicing & aintenance of EWP s eva1 ssue Date: 10/12/2012. ev Date: 10/12/2012.