State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

Similar documents
Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

The I-85 Express Lanes Project NASCIO Recognition Award Nomination

Major Mobility Improvement Program (MMIP)

GIVING GEORGIANS A CHOICE TO KEEP MOVING

405 Express Lanes General Information & Frequently Asked Questions

MARTA Expansion Update

Commuter Credits Pilot Project

Appendix T-2: Transportation Facilities Inventory

Capital Beltway HOT Lanes - Frequently Asked Questions

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

An Easier Commute. Learn how to use I-77 Express to save you time.

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

IH 85 EXPRESS LANES ATLANTA, GA USDOT Congestion Reduction Demonstration Program Grant ($110M)

High Occupancy Toll Lanes Potential for Implementation in the Atlanta Region

Highway 217 Corridor Study. Phase I Overview Report

Preliminary Transportation Analysis

Key objectives of the survey were to gain a better understanding of:

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

I-20 East Transit Initiative

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Strategies to keep people and goods moving in and through Seattle

Toll Rate Public Hearing

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

The I-680 Southbound Express Lane

1.221J/11.527J/ESD.201J TRANSPORTATION SYSTEMS FALL 2003 FINAL EXAMINATION. 1. Open-book and open-notes, calculators are fine -- no laptops.

Washington DC Section of ITE Project Briefing

3.0 PROJECT DESCRIPTION

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Contractor Says I-77 Tolls Will Open By Year End, But Not Some Ramps

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

I 595 Express Corridor Improvements Project. February 2014 Update

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

395 Express Lanes Extension

Congestion Management Report

Aurora Corridor to E Line

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Interim Transit Ridership Forecast Results Technical Memorandum

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Cities Connect. Cities Connect! How Urbanity Supports Social Inclusion

Transportation and Air Quality Committee GEL Project Briefing and Update

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

How To Encourage More Efficient Transportation in Brazilian Cities

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Please sign in & Help yourself to some refreshments

County of Fairfax, Virginia. Department of Transportation

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

North Shore Transportation Improvement Strategy

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Harrah s Station Square Casino

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Public Hearing Tarrant County. October 11 th, 2012

Managed Lanes: A Popular and Effective Urban Solution. Ed Regan Presented by Susan Buse

S T A T I O N A R E A P L A N

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

11,000. P.M. Peak Hour Vehicles/Hour 10,000 9,000 8,000. Year

Clackamas County Comprehensive Plan

Comment cards and s were received and compiled. Major Concerns/Comments

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

Northwest Corridor Project (I-75/I-575) Agenda. Brief Project History. Stakeholder Briefing January 27, Brief Project history

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Welcome to the McKenzie Interchange Project Open House!

BUILDING A BETTER COMMUTE. A Property Manager s Field Guide to Navigating Construction

Existing Transportation System

July 10, :00-11:30 a.m.

Managing Dulles Rail Construction in Tysons Corner

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Highway 17 Transportation Improvement Study

Arterial Transitway Corridors Study

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Austell Road Access Management Plan Public Meeting February 17, 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

North Avenue Rail Station Accessibility Assessment

LOOP 360 IMPROVEMENT STUDY

Hennepin County Transportation Department

York Region Population and Employment Growth

Arterial Transitway Corridors Study. Ave

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-80 Corridor Overhaul

There are traffic jams on Highway 1

Freeway Improvement Project

95 Express Annual Operations Report: Fiscal Year

Transportation Impacts: Toronto York Spadina Subway Extension

Win-Win Transportation Solutions

What are Managed Lanes?

Capital Beltway HOT Lanes Project

Improving Mobility Without Building More Lanes

Chapter 3 BUS IMPROVEMENT CONCEPTS

TRANSFORM I-66 COMES WITH MULTI-MODAL OPTIONS

DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY

Transcription:

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions 1. When will toll collection end? Toll collection is scheduled to end on Friday, November 22, weather permitting. An exact date will be announced once determined. The toll collection end date is being coordinated so as to not interfere with any major events (i.e. sporting events, conventions, etc). 2. When will the toll booths come down? Preliminary activities associated with the removal of the toll booths/canopies are expected to begin in October 2013 with actual removal of the toll booths and canopies, filling in of the underground tunnel access stairways, and utility work occurring between January 2014 and Fall 2014. No heavy construction activity is expected to occur during the winter holidays. 3. Why do the toll booths have to come down? Safety on GA 400 is the top priority. Leaving all nine lanes in each direction at the plaza open would be a safety hazard and cause confusion for drivers as they merged in and out of those lanes without the regulation of traffic flow that currently happens when drivers stop to pay the toll. Removing the toll booths, overhead canopy and associated equipment will be a part of the overall demolition project as well as filling 16 of the 18 stairwells that lead to the underground tunnel. Additionally leaving the tolling equipment/structure will warrant ongoing maintenance of an unused facility. 4. How many lanes will be left for drivers to use when the demolition is complete? In both the north and southbound lanes as you approach and leave the toll plaza, GA 400 consists of three travel lanes. With the exception of intermittent, construction-related closures, three (3) travel lanes in each direction will be open to traffic during and after construction. Leaving all nine lanes in each direction at the plaza open to traffic would not help traffic and would cause confusion for drivers as they merged in and out of those lanes. 5. What changes to the Peach Pass lanes at the GA 400 Toll Plaza will I see when construction begins? Since Friday, October 25, 2013, motorists have no longer seen the changing light structure (i.e. the green light) when cruising through the Peach Pass lanes. This change coincided with the start of restriping of the electronic Peach Pass lanes to accommodate the shift of traffic from the toll booth and cash lanes when toll collection ends. Drivers should keep moving and tolls will continue to be automatically deducted from their accounts. Also on October 25, crews began removing or modifying toll-related signage from areas approaching the GA 400 Toll Plaza. A total of 66 signs will be removed or modified before and after toll collection ends. 6. How much does the project cost?

Total project cost is approximately $4.5 million with $3.5 million in construction cost. 7. Who is paying for the project? The State Road and Tollway Authority (SRTA) is funding the project cost, while the Georgia Department of Transportation (GDOT) will oversee construction and traffic management. 8. What delays can be expected during construction? Traffic flow will continue to utilize three general purpose travel lanes throughout the length of the project. However, as with any transportation related construction, traffic patterns may change. So, during the project, motorists should allow a little extra time and/or consider other transportation options, such as transit, in the GA 400 corridor. 9. Will the existing toll plaza building also be demolished? No. The cash lane toll booths and overhead canopy will be demolished and removed; however, the toll plaza building located just off the shoulder in the northbound direction will remain. The ownership of the building, which is currently leased by SRTA for operations of GA 400, will be returned to GDOT. 10. What is happening to the GA 400 toll equipment? Equipment that can be re-used in existing toll facilities on I-85 and future tolling projects will be saved. 11. The tolls were extended in 2010 and now they are ending. Why? The tolls were extended in order to fully complete the project as originally designed and fund additional needed projects along the GA 400 extension. Prior to the original construction of the 6.2 mile extension, traffic projections did not show enough demand to justify the cost of ramps from I-85 south to GA 400 north and from GA 400 south to I-85 north. Traffic has exceeded all projections and those connector ramps are needed to relieve congestion around Sidney Marcus Boulevard, Buford Highway Connector, Lenox Road and Piedmont Road. Governor Nathan Deal committed to finding a way to fulfill the original promise to end tolling as soon as outstanding debt could be paid off without cancelling project commitments designed to benefit the entire GA 400 corridor. Commuters are getting the benefit of the 14 projects funded by toll reserves and the connector ramps funded by the toll extension and will now have a toll-free facility to use. 12. How many drivers will be affected by the project? Approximately 119,000 people use the 6.2-mile system every weekday. Approximately 45 percent of all vehicles travelling GA 400 use the Peach Pass for cashless payment of tolls. 13. What is the toll money used for? The average weekday revenue collected at the toll plaza on GA 400 is approximately $59,000 per day. All tolls collected are used to pay down bond debt, operate and maintain the road and assist in financing SRTA s overall operations. SRTA has committed more than $60 million in funding representing 14 transportation projects along the GA 400 corridor.

14. How will future projects be funded? The extension of the tolls completed many of the long needed projects throughout the GA 400 corridor. Future projects, such as improvements to the I-285 at GA 400 interchange, are being looked at closely and will be funded through current resources such as state and federal gas taxes. Priced managed lanes built on newly constructed lanes north of I-285 are also being studied and could potentially be funded through innovative financing models such as a public-private partnership. How will SRTA fund operations without the toll? Once the tolls end, SRTA will use a combination of revenues from the I-85 Express Lanes, state transportation funds and toll reserves to fund operations. 15. Will SRTA have to eliminate jobs? Yes, approximately 50 positions (approximately 1/3 of the personnel that work at SRTA) will be eliminated with the end of tolls on GA 400. Most of these positions are toll plaza cashiers. The cashiers at the GA 400 toll booths and their immediate supervisors work for SRTA through a contract with a private company. SRTA s contract with that company will end after the tolls end. 16. How does a road become a toll road in Georgia? What is the process? The State Transportation Board has the sole authority to designate a road as a toll road in Georgia. Studies are frequently completed looking at the feasibility to build entirely new toll roads or new optional toll lanes on existing roads. Once the Transportation Board designates a road as a toll road, GDOT constructs the road and SRTA installs the tolling equipment. The SRTA Board establishes the toll rates and operates the toll system for as long as the roadway remains designated as a toll road by the State Transportation Board. This separation of responsibilities, by design, is a check and balance that keeps any one state entity from unilaterally establishing a toll road. 17. Where can I find additional information? For more detail on the project, go to the GA Tollway Demolition Project page on the SRTA website (www.peachpass.com). 18. What is the State doing to make my commute better on the GA 400 corridor? Governor Deal has stated that improvements to the GA 400/Interstate 285 interchange are a key Metro area transportation priority of his administration. Georgia DOT is working to develop a practical, affordable plan to make those improvements as soon as it is feasible and in such a manner as to accommodate other future improvements to both the 400 and I-285 corridors. In that regard, there is an ongoing study

of the feasibility of managed lanes on the Ga 400 corridor from I-285 to SR 20. This study includes an analysis of possible alternatives and how they could best be implemented. We continue to work on environmental clearance for the revive 285 project (I-85 to I-75 on the top end) that will clear a footprint for long term improvements to the I-285/GA 400 interchange along with managed lanes and other operational improvements. 19. How will these improvements be funded? We are committed to an aggressive effort to improve mobility on both I-285 and GA 400 and in an financially responsible manner. Studies are currently underway to explore various funding options. 20. What additional commute options are available in the GA 400 corridor? The Georgia Commute Options program is a one-stop shop for commuters looking for other transportation options such as carpooling, vanpooling, transit, teleworking, etc. The program offers incentives for motorists who choose to use some of the various commute options. Programs like the GA Commute Options are part of a regional strategy to reduce traffic and improve air quality. Georgia Commute Options consultants also work with employers at no cost to create programs that help employees find the commute options that work best for them. Many workplaces in the GA 400 corridor are participating in the program. To learn more about Georgia Commute Options, visit GACommuteOptions.com or call 1-877-9-GA- OPTIONS. 21. What specific transit/bus/rail service is in the GA 400 Corridor? Yes. Both MARTA and GRTA Xpress service are available in the GA 400 Corridor. MARTA (rail and bus) MARTA's Red Line rail stations include Buckhead, Medical Center, Dunwoody, Sandy Springs ending at North Springs. A train arrives every 15 minutes in the peak periods and every 20 minutes in the off peak. Patrons can take the ramp from GA 400 directly to the North Springs Station. The Red Line rail service ends at the Atlanta Airport. MARTA also operates bus service that feeds into the MARTA rail stations. MARTA has 10 bus routes and 2 Park and Ride facilities at Mansell Road and Windward Parkway in the North Fulton area. MARTA is conducting a study in the GA 400 corridor for future service development. MARTA's Connect 400 project is an Alternatives Analysis (AA) study that considers potential alignments and transit technologies while working with area stakeholders. Additional information on Connect 400 is available on the MARTA website at http://www.itsmarta.com/north-line-400-corr.asps. The MARTA fare is $2.50 one-way plus $1.00 for the Breeze fare card. A round trip is $5 plus the cost of the card. For more information go to the MARTA website at: http://www.itsmarta.com or call Customer Information at 404 848-5000.

GRTA Xpress Coach Service Monday through Friday, Xpress service begins in Cumming and travels south on GA 400 making stops at North Springs MARTA station or continue to Downtown Atlanta. There are eight inbound and eight outbound trips per week day which in 2012 hosted over 65,000 boardings. o Downtown service provides convenient access to major employers such as Georgia-Pacific, SunTrust, Coca-Cola Enterprises and Capital Hill, as well as, Five Points, Peachtree Center and North Avenue MARTA Stations One-way fares begin at $4 with roundtrip and multi-trip discounts available