RIG CAPABILITIES For Multi Well/Pad Development

Similar documents
Drilling Efficiency Utilizing Coriolis Flow Technology

Chapter 5 HORIZONTAL DRILLING

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

Engineered solutions for complex pressure situations

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Shell Castor & Pollux Rig Equipment Primary Items

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

On-Off Connector Skirt

Subsea Safety Systems

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

7/27/2011. How Things Can Go Wrong In The Drilling Of Oil / Gas Wells

Dynamic Underbalance (DUB)

RPSEA UDW Forum June 22 & 23, Secure Energy for America

BLACK HILLS PLATEAU PRODUCTION COMPANY

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

The Time Has Come For Coiled Rod. Reprinted from Well Servicing magazine

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

SUBSEA KILL SHEET EXERCISE No. 5

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

1. The well has been shut in on a kick and the kill operation has not started.

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

Hydro-Mech Bridge Plug

PRO-ROD TM COILED ROD. Reduce Maintenance Increase Production Enhance Profit

Marine Technology Society

Hard or Soft Shut-in : Which is the Best Approach?

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Study Guide IADC WellSharp Driller and Supervisor

Deepwater Horizon Incident Internal Investigation

Horizontal Marmaton Wells in Beaver County, OK

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

BOP Testing Best Practices

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

HydroPull. Extended-Reach Tool. Applications

WILD WELL CONTROL WARNING SIGNS OF KICKS

DRILLSCENE PROACTIVE DRILLING DECISIONS

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment

Air and Gas Drilling

Hydronic Systems Balance

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Abandonment Program for Paramount Fort Liard F 36

Deliquification Short Stories

IWCF Equipment Sample Questions (Surface Stack)

August 21, Deepwater MPD / PMCD

Shell Beaufort and Chukchi Sea Program Update

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

Memorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes.

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Reducing Nonproductive Time

DRILLING HOSE SOLUTIONS

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

White Paper. Electrical control valve actuators on oil and gas production separators

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

CAUTION Hard copies of this document may not be the current version. Refer to the "I Am The Key" verify the current version,

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

2010 Sucker Rod Pumping Workshop Optimizing Production and Reducing Costs by Solving Rod Pumping Problems With The Beam Gas Compressor

Well Testing Operations. Turkey, Istanbul, Points Taksim Hotel. Training Course : One Weeks Training Course In. As Under Details :

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

Premaberg Industrieanlagen Ges.m.b.H. Lowering Back Pressure, Optimizing Production and Reducing Costs With The Beam Gas Compressor

Perforation Techniques in brown fields for Production optimization.

Rig Math. Page 1.

5k Slickline Lightweight Pressure Control Equipment 4 ID

PathFinder was awarded a contract to drill a complex steam

W I L D W E L L C O N T R O L FLUIDS

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells.

HDD Wire Guided Waterway Crossing ATON Plan. Augwick Creek (S-L28)

On the Blowout Preventer Testing Problem: An approach to checking for leakage in BOP networks

Learn more at


Challenges in Ship Design to Maintain Thrusters inside Ship

DB Bridge Plug. Features. Benefits. Applications

IAC-06-D4.1.2 CORRELATIONS BETWEEN CEV AND PLANETARY SURFACE SYSTEMS ARCHITECTURE PLANNING Larry Bell

Selection of ICF made easy Save even more time with ICF

Stormy Phillips BASICS OF LEASE AUTOMATIC CUSTODY TRANSFER (LACT) SYSTEMS

Dropped Sheave Saddle Bracket

Sullair Air Systems. *Assessment of the market for compressed air efficiency services. Technical report, U.S. Department of Energy, June 2001

Transcription:

RIG CAPABILITIES For Multi Well/Pad Development

Advantages to Multi-Well Pad - Continuous Operations Minimize EHS Risk Less iron to move Less trucking Less risks for spills Fewer or no Well Heads to avoid Rig Release to Spud in less than 24 hours No need to refurbish location between wells Reduced Mob-Demob for drilling and completions Potential Cost Saving of $750,000+ per well Less lost circulation and other hole issues No damage to existing well bores during completion No loss of revenue from offset wells being SI

Challenges Well Path Design Well Pad Layout/Orientation Rig Footprints/Setup/Availability of Rigs that can Walk or Skid Compatibility-Well Pads (One Design Fits All)

Advantages to Pre-planning Reduced Risk of Collision with older Well Bores. Less Directional Work Reduced Cost Better Hole Quality Minimize Number of Pads needed to develop acreage Design Preferred Pad Orientation

Examples Of Challenging Situations Existing Wells On Location Non-Preferred Location Orientation Lack of Section Development Plans (Due to Existing Non-Productive Wells, Severe Faulting, Etc.) Poor Location Placement for Drilling Multiple Wells (Possibly due to topography or land complications)

Beckham 4-27H 290 FWL Beckham 1-27H 990 FWL Beckham 2-27H 1960 FWL Beckham 3-27H 2380 FEL Sharon Mae 2-27H 1410 FEL Sharon Mae 1-27H 440 FEL Current Project Full Section Development (Planning Stage) Pad 1: 990 FWL 315 FSL Pad 2: 2646 FWL 150 FSL Pad 3: 1625 FEL 18 FSL

Beckham 4-27H 290 FWL Beckham 1-27H 990 FWL Beckham 2-27H 1960 FWL Beckham 3-27H 2380 FEL Sharon Mae 2-27H 1410 FEL Sharon Mae 1-27H 440 FEL Current Project Full Section Development (Planning Stage) Pad 1: 990 FWL 315 FSL Pad 2: 2646 FWL 150 FSL Pad 3: 1625 FEL 18 FSL

Example Of Optimum Situation Preferred Pad Orientation No Existing Wells on Location Section Development Plan

Directional Issues With Existing Pads Increased Risk of Collision Well paths may cross Insufficient Survey Data from Offset Wells More Directional Work More Survey Time Lower ROP More Bits Increased Days on Location

Rig Capabilities Analyze the capabilities of Rig Types to determine which rig type offers the Optimal Solution For Pad Drilling Skidding Rig/Conventional Walking Rig

RIG TYPES Overview of a range of rig types including different walking and skidding rig types and evaluating the pros and cons of each for pad drilling Evaluating whether walking or skidding rigs offer a more cost-effective option Evaluating which rig designs allow for the closest well spacing to deliver improved production efficiencies Quantifying the distances that can be skidded by different rigs to determine what limits rigs impose on well spacing on the pad

RIG SELECTION/OPTIONS Conventional Rig - Skid using 3 rd party trucks or outfitted with equipment such as Hillman Rollers to expedite skidding operation. PROS Day rate will typically be less than walking rigs. Rig will/could be adequate if you are moving back on a location with a previous drilled well. Normally, these rigs can be secured with a shorter term contract, may fit an Operator that does not have a longer term development plan. CONS If you are Drilling more than one well on a Pad, will require laying down of all DP before the rig can skid. Will require moving of all drilling related equipment before the rig can spud. (Pumps, Pits, Generators, SCR, ETC). Release to Spud Time 2-4 Days. Cannot justify the rig move cost on a Multi-Pad Development with more than 2-4 planned well bores, if they are drilled Back-To-Back. Larger Foot Print For Skidding, typically 35 +.

RIG SELECTION/OPTIONS Conventional Rig - Skid with Trucks

RIG SELECTION/OPTIONS Rig Equipped to Walk Rig equipped with a Versitic Rig Walker or Similar Equipment. (Nabors - Jack and Claw, Axon Energy Lift and Roll) Drilling Contractors Equipping Rigs with the Versitic Rig Walker or Similar Equipment Cactus Drilling, Desoto Drilling, Felderhoff Brothers, Nomac Drilling, H&P Drilling, Nabors, Patterson-UTI. Can be retrofitted for any existing rig either directly to the substructure or through use of a pony sub. Ability to skid the rig in 8 directions. Requires Modifications To The Electric Cable Trays. Requires Modifications To The Flow Line, Choke Line and Kill Line.

RIG SELECTION/OPTIONS Walk the rig with full set back (No Rig Down). Depending On Derrick Configuration, can walk with as much as 25,000 Feet of DP standing in the derrick. Some Walking Rigs have the capability to drill as many as 28 wells per pad on 10 spacing or 16 wells per pad on 20 Spacing. (400 x 400 Pad) Improvements to The Solids Control System Should be evaluated for Multi Well Pad Development, to minimize problems with solids in the active pit system. BOP Trolley System should be utilized.

RIG SELECTION/OPTIONS PROS As our business continues to include more Multi Well Pad Development, the New Build Walking Rigs or the Older Rigs that have been Modified are more readily available. The design of most Walking Rigs will allow the Operator to fully develop a pad in phases if necessary. Optimal Well Spacing can be 10, 20 30 or 40 with no modifications necessary to the rig, If spacing varies. Allows Operator to batch set Surface or Intermediate Casing Strings before Production Hole is drilled. Drilling Fluid can be swapped out one time if Production Hole requires a Different Mud System than the Surface or Intermediate Section(s). Shorter Rig Release to Spud Can be as Quick as 12-24 Hours. No Trucks or Third Party Equipment required to walk to the next well. Requires a smaller Foot Print to Drill Multiple Wells on one pad.

RIG SELECTION/OPTIONS CONS This Type Of Rig is not a fit for all Operators. Typical Day Rate can be as much as $7,500 more than a Conventional Rig. Normally required to sign a term Contract of at least 24-36 months for a New Build Walking Rig. Possible Lesser Term Days on an upgraded Rig. Rig moves must be minimized to justify higher day rate. A Long Term Development Plan (Per Section) should be in place before rig is contracted.

Woodford Development in SE Oklahoma: 4 Wells Were Drilled, The Rig Was Released, The Wells Were Completed and Put To Sales. The Rig Moved Back In and Drilled 4 Additional Wells. Original Wells Were One Section Laterals Drilled North x South. The 4 Additional Wells Were One Section Laterals Drilled South x North. (Developed the West Half of Two Different Sections 190 FLL and 600 between Laterals.

Two Section Development. Drilling 8 Wells per pad. Laterals placed 190 from lease line. Lateral Centers 612. Optimum Pad Placement Pad #1: East/West Placement: 1460 FEL North/South Placement: As close to the section line as possible Pad #2: East/West Placement: 1460 FWL North/South Placement: As close to the section line as possible Pad #2 Pad #1

Previous Pad After The First Four Wells Were Drilled

Prepare To MIRU For Next 4 Wells

Hilman Rollers

Versitic Walking System

Benefits of the Rig Walker Skid your rig in 8 directions with full setback in place eliminating rig down 2.4 million pounds lift capacity Walks 40 feet in 1 hour Level the rig while drilling Retro-fitted to most rigs Compact design for easy use Counter balance valve for better protection Safe, fast, and versatile