Figure 1 - Typical examples of acceptable camping fuel

Similar documents
MARK NIZER c/o Active Media Group Free Union Road, Free Union, VA downstage. Monitor Cardboard Box

FALL PROTECTION GUIDELINE

Technical Packet Erie Insurance Arena 809 French Street Erie, PA (fax) Erieevents.com

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

FALL ARREST TETHER TRACK RIGID RAIL ANCHOR SYSTEMS DESIGN:

A Foundation Of Trust. Hanging By A Thread

Pole Dance Performer Application Packet 2018

Fall Protection Checklist. Guardrail System

An introduction to Rigging for Trail Work

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

AES Raptor, LLC Raptor R1000 Instruction Manual

Y TWR TECHNICAL PRODUCTION SPECIFICATION. Copyright 2017 Music Theatre Wales & Theatr Genedlaethol Cymru Musictheatre.wales Theatr.

Ashurst Hall Technical Specifications

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

WOLLONGONG TOWN HALL MAIN AUDITORIUM

Page 1 of 1 04/19/13 SBR

WORLD BATON TWIRLING FEDERATION WBTF EQUIPMENT, SUPPLIES & MEETING ROOM REQUIREMENTS

Elementary Stagecraft Rigging Systems

STRIDER THEATER INFORMATION & POLICIES FOR STUDENT PRODUCTIONS

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL

Fall Protection. Fall Protection

HANGING SIGNS DEFINITION. An exhibit suspended component above a three or four sided booth. Only peninsula or island booths can have a hanging sign.

PREPARING AND CLEARING THE NET (Instructions shown are for right handed throwers. Reverse for left handed)

National Showcase Bid Information & Guidelines. Competition Dates:

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

What is fall protection?

Fall and Slip Prevention Test. 1. Fall protection is required in construction at and on scaffolds at.

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used

INSTRUCTION MANUAL. January 23, 2003, Revision 0

MSA Confined Space Entry Equipment

RISK ASSESSMENT SHOW: DATE: CONTACT: Risk Management Strategies. Area of risk Types of risks identified

Standard Operating Procedures

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

User Instructions 1789 Parapet Wall Anchor

At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest.

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

MAY 2015 EQUIPMENT LIST CONTENTS: 1. SWIMMING LANES 2. STARTING BLOCKS 3. STORAGE DRUMS FOR SWIMMING LANES 4. WATERPOLO GOALS AND FIELD LINES

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

UNIVERSITY OF MARYLAND BALTIMORE COUNTY TECHNICAL RIDER

REGULATIONS & COMPLIANCE. Riggers Safety LLC. 267 Winfield Cr. Corona, CA

EUROBUNGY-TRAMPOLINE

GUARDIAN FALL PROTECTION

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

harnesses shock-absorbing lanyards self-retracting lanyards fall protection kits anchorage connectors horizontal lifelines

MSA Latchways Leading Edge SRL Self-retracting lifeline for horizontal and vertical use

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

Creating. and Managing Melaleuca Events

Figure 1 - Cable Grip Horizontal Lifeline Termination ZORBIT ENERGY ABSORBER RELEASE TAB

Figure 1 - Parts Identification

deluxe toilet safety support

SAFETY 101: FALL PROTECTION: REDUCING FALLS DURING RESIDENTIAL CONSTRUCTION: RE-ROOFING FACT SHEET

Airwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness

Zip-Line Kit Instructions

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

FALL PROTECTION LADDERS ACCESSWAYS

2010 International Snow Science Workshop

11.4 FALL-ARREST SYSTEM AND EQUIPMENT CHECKLIST (Must answer yes to all applicable questions)

Security and confidence at height.

Fall Protection Introduction

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Event Guidebook Instrumental

E-trike Li Assembly Guide

PURSUIT. Standard Features. Custom-Height 360 Pinnacle Seat 2017 PRODUCT LIST

by Master Halco ANCHOR GATE SYSTEMS Swing Gates Overhead Slide Gates Cantilever Slide Gates Vertical Lift Gates Fencing Without Boundaries.

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1

Workman Fall Protection Products

HELM Hinging facility according to EN 795:2012 Typ D. Sliding hardware

How I Manage my Mast and Spiderbeam Antenna

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

CITB Construction site safety update

Big Ride ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * *

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

GTR FlexPLI Manual. FlexPLI Preparation before Car Testing

User Instructions. Installing Fall Protection Void Formers. Please read carefully before fixing anchorage components into formwork

Final Assembly Instructions Bikes with Threaded Headsets

Operating instructions. Skyline Beam Clamp

Chapter 2. Before You Get Underway. Copyright Coast Guard Auxiliary Association, Inc.

Reliance Industries, LLC. Installation, Operation, Inspection and Maintenance Instructions for the Skyline Horizontal Lifeline System

Workman Fall Protection Products

CTU Presents. Towers. Safety Maintenance Proper Load Design. By Kurt Andress, K7NV

Fan Club Rally (Event) Organizing Guide

Explain that this is how I did my tower, it does not necessarily represent the state of the art, nor even the right way to do any particular aspect

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

References: EM Section 15 OSHA UFGS

Hazard Injury Who at Risk Existing Control Measures Risk Score Further Control Measures Needed

CARGO CONTROL Section 09 Page 52

Guide Wire Roof Anchor READ ONLINE

Miller DuraHoist Safety Systems

IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact DBI/SALA.

New Mexico Institute of Mining & Technology. Fall Protection Program

S-60-TO : 1 ton tower system INSTRUCTION MANUAL

BEAMGUARD SAFETY POST TM INSTRUCTIONS

JANUARY 2011 EQUIPMENT LIST CONTENTS: 1. SWIMMING LANES 2. STARTING BLOCKS 3. STORAGE DRUMS FOR SWIMMING LANES 4. WATERPOLO GOALS

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada)

Floor Mount Socket. T: +44 (0) F: +44 (0)


TruckSkin System Installation Manual

Transcription:

1. SETUP AND SOUND CHECK The Passing Zone requires approx. 1 hour for setup and sound check. 2. FIRE Corporate Performance Contract Rider with People-Juggling TECHNICAL REQUIREMENTS The Passing Zone juggles fire in their performance. Purchaser or Production Company must make necessary arrangements with the venue for approval of fire. Necessary costs or fees to be paid by Purchaser. NOTE: If approval for performing fire becomes a challenge for your venue, The Passing Zone regularly performs without fire; the excitement of their performance is not hindered in any way (see video for non-fire versions). 3. COLEMAN FUEL Due to airline restrictions, The Passing Zone cannot bring with them, and therefore must be provided with, a one (1) gallon container of Coleman fuel (white gas, camping fuel). This can be found at Target or WalMart type stores, hardware stores, sporting goods stores, and is usually in a rectangular, red and silver, one-gallon can. (See Figure 1) (Note: If fire is not allowed in venue, the Coleman fuel is not necessary. Coleman fuel is for juggling fire, not chain saws. Purchaser does not need to provide gas for chain saws.) Figure 1 - Typical examples of acceptable camping fuel 4. STAGE There should be a stage. The Passing Zone does not wish to perform on the floor unless absolutely necessary. The minimum stage size is 24 feet long by 24 feet deep (40 feet long by 24 feet deep if using Option #2 for people juggling set-up). If risers are being used, the sections must be firmly attached to each other, either by taping the cracks between sections, or clamping sections beneath the stage. Feb 2011-1

- 2-5. MICROPHONES AND MUSIC The Passing Zone brings their headset microphones (Countryman E6) and music on a CD. They will require two Shure belt pack transmitters, and a CD player. (The Passing Zone does not travel with belt pack transmitters, receivers, CD player, soundboard or speakers.) Your system must have four (4) separate channels, one for each microphone, plus two (2) for the CD player/computer that controls our music, and one channel for a handheld microphone (wired or wireless) and stand should be provided for a harmonica solo. A sound technician will be needed to adjust microphone levels and play music cues. 6. MONITORS There should be audio monitors (speakers for performers to hear their music on stage) on the front corners of the stage or off to the sides of the stage, facing performers. (Note: Monitors are not necessary if The Passing Zone does not perform the Chainsaw Ballet.) 7. SOUNDTRACK & CUE SHEET ATTN: Technical Director, Production Company: please download our soundtrack and cue sheet from our server to assist you in preparing for our Show. https://public.me.com/owenmorse 8. AUDIENCE The audience should be seated close to the stage (in most situations, no more than 10 feet). There should not be a dance floor or other wide space separating the audience from the stage. 9. DRESSING ROOM If the performance takes place in the hotel where The Passing Zone is staying, then no dressing room is necessary. If the hotel and performance venue are in different locations, a dressing room should be provided. 10. LIGHTING Front: Lighting must be direct lighting, or basic stage lighting, or portable stage lighting, or a combination of the above. Overhead lighting (i.e. normal room lighting, fluorescent lights, etc.) is not acceptable. The wash must cover entire stage, including the area from stage deck to 15 feet above stage deck, in order to illuminate objects being thrown into the air. Back: Backlighting from above or below is also necessary. The simplest setup is 2 par cans on floor plates, placed on the upstage corners aimed downstage center and toward the ceiling. Thus, when performers are facing the audience, throwing objects into the air, the objects are lit from behind. 11. CEILING HEIGHT The ceiling should be at least 15 feet above stage level in order for The Passing Zone to perform a full show. A slightly shorter show will be performed if ceiling height is lower. NOTE: The Passing Zone can do 40-45 minutes with only an 8 or 9 foot ceiling. Please notify The Passing Zone or their Agent if height will be less than 15 feet so Jon and Owen can make necessary preparations. Feel free to call and discuss location and height requirements if you have any questions. 12. WATER Please provide six (6) bottles of water. January 2010-2

- 3 - GENERAL PEOPLE-JUGGLING REQUIREMENTS PJ1. SETUP One of the setup options from People-Juggling Rigging Requirements (on following pages) must be possible. PJ2. COST There is an additional fee plus rigging and shipping costs involved when The Passing Zone presents People-Juggling, depending on setup capabilities. PJ3. STAGING A minimum stage performance area of 24 x 24 is required, as well as 18 of ceiling height above the stage. PJ4. VOLUNTEERS Three people from the audience must be permitted to perform on stage. PJ5. BACKSTAGE There must an area backstage for 3 volunteers to be suited up and prepared. And they must be able to have access to the performance area via backstage, for them to make their entrance. (Note: while the volunteers are being prepared backstage, they will be missing about 15 minutes of the show. If you would like them to be able to enjoy the whole show, you will want to provide video monitors backstage, or have them set up where they can view the I-MAG screens from behind.) PJ6. FOG MACHINE AND CONFETTI (provided by The Passing Zone) If approved by the venue, a Rosco brand, water-based fog machine and confetti are used during the People-Juggling piece. PJ7. VOLUNTEERS ( Jugglenauts ) Purchaser or client should choose 3 people who are willing and able to participate in People-Juggling. Consider 3 well-known people in upper management, or 3 people who represent a cross-section of the audience. They should meet the following criteria: 2 men, 1 woman Height: 5 3-6 3 Weight: 100-200 lbs. Attire: Skirts and dresses will not work in the harness. However, women can bring a change of clothes backstage that will be not be seen by audience but will work inside the harness and costume. Other: Volunteers should not have back problems or other health issues that would make hanging in a harness difficult. They should be people who do not get motion sick very easily. (This has never been a problem, but chances are better that it will be a good experience for someone who doesn t have motion sickness problems.) We are sensitive to the fact that people (especially upper-level executives) do not want to be made fun of in front of their fellow workers. This piece, while very outrageous and funny, is designed to turn the participants into heroes. They will be dressed like astronauts, they will participate in what will be described as an exciting mission, and in the end they will be applauded heartily as they exit the stage waving flags and showered with confetti. It is fun and easy to do. The harnesses are extremely comfortable, with the participants weight resting on their feet so it feels just like they are standing. All they need to do is follow instructions as they go, enjoy the ride, and they ll be heroes of the day. January 2010-3

- 4 - PEOPLE - JUGGLING RIGGING REQUIREMENTS The Passing Zone brings a 12 X 20 swivel plate (Figure 2) to connect to the bottom of an aluminum box truss. This plate must be rigged so that it is: 17 3 above the stage Centered left to right Minimum 10 from the front edge of the stage Minimum 12 from the back curtain or wall It must not swing or sway, because the weight of 3 people (up to 600 lbs.) will be from this point. Rigging can be accomplished in several ways, the most proven and inexpensive method being the use of a dead hung box truss (provided by the production or rigging company) with guy lines run down to the stage or floor. However, each production company may have different capabilities and ideas about how rigging will work best in any given venue. The Passing Zone is open to all possibilities but reserves the right to final approval of every technical aspect of production. The Passing Zone will supply the swivel mechanism. Rigging materials will be provided by the production or rigging company. Please contact Owen Morse, Technical Director for The Passing Zone (contact info on last page), to discuss the optimal approach for your venue. Figure 2 - Swivel Plate, pictured while attached to 12 box truss Important: the weight of 3 people (up to 600 lbs) will be swinging in circles centered under the truss. The truss must be solid and not move in any direction. January 2010-4

- 5 - Option #1: Rigging a Truss from the Ceiling 12 or 20 box truss only Bottom of truss must trim at 17' 3 above stage ~600 pound live load max Dead Hung or with Motors (½ ton single phase are ideal) Beam clamps may be used for rigging points. Min 2000 pound Working Load Limit Guy Lines: Guy lines must be taut and anchored to stage, structural steel or temporary ballast such as stage weights, sandbags, concrete barriers or water ballast (min 600 pounds per corner). Ballast must not slide. Lag to floor or provide non slip surface such as neoprene mat. Ratchet straps in conjunction with wire rope or turnbuckles may be used to tension assembly if Working Load Limit is at least 1,500 pounds. Screw-in floor anchors may be used. In certain cases, guy lines may be rigged in an upward direction and anchored to structural steel in the ceiling. Please contact technical director for more information. Figure 3 - Example of a Truss Hung from Ceiling Option #2: Passing Zone Free-Standing Rig When overhead rigging is not a possibility, a self-contained free-standing rig (provided by The Passing Zone, with shipping to be paid by Client at cost) is available. This requires a minimum of 18' clearance over a 24 x 40 stage. Confirm with The Passing Zone that there is adequate time for shipping of all equipment. (Note: International and overseas locations will require additional time and shipping costs.) The free-standing rig requires assembly. If there are other events happening in the venue or room where the Passing Zone will be performing, ensure that there is enough time for setup and strike. January 2010-5

- 6 - Typical Setup time: 3 hours (All cases are unpacked and pieces are assembled into 4 major sections. The 4 sections are then assembled on stage.) Typical Strike time: 2.5 hours The free-standing rig is shipped in 4 large, heavy cases. The venue should be able to receive and store these cases. In addition, an adequate-sized freight elevator is required if the cases are to be moved above or below the loading dock level of the venue. Case 1: 140 x 24 x 22.5 Case 2: 140 x 24 x 22.5 Case 3: 126 x 27 x 20 Case 4: 81 x 28.5 x 30 The stage should be a minimum of 24 deep by 40 long, with an unobstructed 24 by 24 performance area centered beneath the truss. Smaller stage sizes may be possible in certain situations. Contact technical director for more information. Assembly of the free-standing rig is labor-intensive. Ideally, 2 or more stagehands should be available to help with setup and strike. An 8' step ladder (minimum) should be available for use in construction of the rig. The Passing Zone Contacts: Artist Contact: Owen Morse (714) 227-8721 / owen@passingzone.com Events Manager: Reye Leduc toll free 877-307-7403 / events@cmispeakers.com January 2010-6