Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input

Similar documents
Review and Comment ACHD s FY Five Year Work Program Draft for Adoption

Committed to Service

Chapter STOP AND YIELD INTERSECTIONS AND RAILROADS

A copy of the draft plan is available at:

State Highway 44/State Street High Capacity Corridor

Committed to Service

What is the Congestion Management Process? What is Congestion? Growth in the Treasure Valley Development and Congestion

5.0 Roadway System Plan

FY Regional Transportation Improvement Program

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

Committed to Service

Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

The Leadville Bikeway Design Recommendations DRAFT January 2018

January 22, /13/2017 2/6/2018 Boise Road Closure & Pedestrian Restrictions AVOID AREA

Coming soon: big changes to Eagle Road Many say it's about time, too

State Street and Pierce Park Lane Intersection Concept Report

Chapter 6 1 Future Transportation System Priorities and Needs

June 6, /18/2016 6/22/2016 Boise Parking & Pedestrian Restrictions. 54 1/5/2016 9/5/2016 Boise Pedestrian Restrictions Building Construction

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Northwest Foothills Transportation Study Update

Committed to Service

February 20, /13/2017 3/6/2018 Boise Road Closure & Pedestrian Restrictions AVOID AREA

Road Work in the Area. June 14, Current Projects. Ada County Highway District Adams Street. Garden City, ID. ph

Final Report. Southwest Boise Transportation Study. Prepared For: Ada County Highway District

Committed to Service

Fairview Avenue Corridor Management Strategy

Safe Routes to School Action Plan Aberdeen, Idaho

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

Phase II Project Bundles Garden City, Idaho

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

2012 PRIORITY TRANSPORTATION PROJECTS

Project Status Update

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

2018 Final Service Changes Proposal Ada County

Table 1: Recommended Interim Improvement and Long Term Improvement/ROW Preservation Proposed Improvements. Recommended Interim Improvement

Citywide Sidewalk and Crosswalk Programs

Committed to Service

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Non-Motorized Transportation 7-1

Project Fact Sheet. August 1,

Pedestrian Project List and Prioritization

Item No. 14 Town of Atherton

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Complete Streets Funding Program Project Prioritization Plan

REGIONAL TRANSPORTATION ADVISORY COMMITTEE October 25, :30 a.m. COMPASS, 1st Floor Board Room 700 NE 2nd Street, Meridian, Idaho **AGENDA**

Committed to Service

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

This page intentionally left blank.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

TRANSPORTATION TRAINING TOPICS. April 6, 2010

City of Charlottesville Bicycle and Pedestrian Master Plan Update

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Transportation Policy Manual

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Committed to Service. Development Services. February 21, ACHD Commission. Mindy Wallace, AICP

Draft North Industrial Area-Wide Traffic Plan

Community Task Force November 15, 2017

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

BPP / SUB

CITY OF LANCASTER PROPOSED NEW PROJECTS

Fairview and Main Local Streets Improvement Plan

Technical Working Group November 15, 2017

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Creating the Future Bruce B Downs Blvd

League of Women Voters of Santa Cruz County

Monroe Street Reconstruction

Northwest Boise NEIGHBORHOOD WALKING AND BIKING PLAN

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

AND GUIDING PRINCIPLES. Boise, Idaho 1997

Planning & Programming

Lynchburg District Update

Frequently Asked Questions

ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Improving intersections for people that walk in Minneapolis

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Geary Corridor Bus Rapid Transit

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

2018 Transportation Survey October 17, Prepared by:

BURLINGAME CITY COUNCIL. Approved Minutes

Northwest Foothills Transportation Study Update

CITY OF BOISE COUNCIL MEETING MINUTES JUNE 3, 2014 WORK SESSION. City Hall - Council Chambers Final 4:00 PM 150 N CAPITOL BLVD BOISE, ID 83702

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

City of Seattle Edward B. Murray, Mayor

CITY MANUALS AND STANDARDS REVIEW

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Transcription:

September 9, 2009 To: Mayor and City Council From: Karen Gallagher Transportation Planner Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input Requested Action: Provide staff direction on merging categorized project lists into two major lists for ACHD and one list for ITD, after taking public testimony. For example, the three separate lists for roadways, new intersections, and rebuilt i ntersections will be merged into one list. Steps 1, 2 and 3: Identifying the City s annual transportation requests is a three step process. Last week the transportation agencies presented to the Mayor and Council their transportation needs in Boise. This week we will review the various lists of requests and the draft priority that staff assigned as a starting point. Next week, the Mayor and Council will finalize the three lists. S tep 2:To prepare for this step, staff has compiled lists of transportation improvements in separate categories: Ad a County Highway District (ACHD)Capital Projects Roadways Rebuild Intersections New Intersections ACHD Community Programs Safe Routes to Schools Neighborhood Requests Downtown Requests from Boise City, DBA, and CCDC (new) Idaho Transportation Department (ITD) Projects Within each list, staff has assigned a draft prioritization. The next step is to merge the individual lists into three lists, so ACHD can understand the relative priority of projects and assign points for their ranking. The public is invited to provide testimony on their priority projects, which the Mayor and Council will consider before providing direction to staff on finalizing the City s annual transportation recommendations. To merge the ACHD Capital Projects lists, staff recommends that intersections be given priority, since the turns at an intersection create the most delay and improvements to the intersections would result in the best congestion relief.

To merge the Community Programs lists, staff recommends prioritizing those neighborhood projects that have been assigned construction years (similar approach as we took last year), then the projects that have received Boise Neighborhood reinvestment Grants, and then the Safe Routes to Schools Projects as listed. Staff requests direction on how to rank the Downtown requests and the other neighborhood requests. Attachments: Ada C ounty Highway District (ACHD) Capital Projects Roadways List Rebuild Intersections List New Intersections List ACHD Community Programs Safe Routes to Schools List Neighborhood Requests List Downtown Requests from Boise City, DA, and CCDC (new) List Idaho Transportation Department (ITD) Projects List I:\PDS\P and Z\Transportation\TIP\CouncilTIPstaffrecs.doc

Boise s Priority 2009 Boise s Priority 2008 1. Listed 1st 2. Listed 1st 3. Listed 1st Roadway Roadways Projects DRAFT Boise City s Recommendations September 4, 2009 Based on Information from ACHD s 2010-14 FYWP Listed Construction Yr Listed Total Cost State Street, 36 th St / 27 th St Unfunded 8,570,000 State Street, Collister / 36 th St Unfunded 8,110,000 State Street, Pierce Park / Collister Unfunded 9,435,000 Funds Expended / % of Total Comments Boise City s first priority; however, segment of State Street is listed in the current FYWP. We request expediting the completion of the ROW Alignment Study. We also request ACHD begin programming segments in the out years of the FYWP. 4. Listed 1st State Street, Glenwood / Pierce Park Unfunded 8,675,000 5. 1. 30th Street Extension 2014 8,880,000 Access to new city parks. Critical link between State St and Main/Fairview. 6. 2. Franklin, Touchmark / Five Mile 2010 & 2011 6,472,000 Complete the corridor. 7. 3. Cloverdale, Franklin / Fairview Planned 6,859,000 Priority rth-south. Development 8. 4. Cloverdale, Fairview / Ustick Planned 5,550,000 Priority rth-south. Development 9. 5. Five Mile, Fairview / Ustick Unfunded 8,443,000 Higher accident rate. 10. 6. Five Mile, Franklin / Fairview 2013 7,759,000 Higher accident rate. 11. 7. Ustick, Cloverdale / Five Mile Planned 9,031,000 Higher accident rate. Development 12. 8. Ustick, Duane Dr (e/o Eagle Rd) / Cloverdale Unfunded 4,517,000 Lower overall prioritization. 11. n/a Fairview Ave, Linder / Orchard 2013 1,350,00 Access Management Median w/ U-turn areas.

Boise s Priority 2009 Boise s Priority 2008 Intersection Intersections Rebuild DRAFT Boise City s Recommendations September 4, 2009 Based on Information from ACHD s 2010-14 FYWP Listed Construction Yr Listed Total Cost Funds Expended / % of Total Comments 1. 1. Maple Grove Rd / Franklin Rd 2013 1,313,000 Complete the corridor 2. 2. State St / Collister Dr Unfunded 1,677,000 Priority corridor 3. 3. State St / Glenwood St Unfunded 7,776,000 Priority corridor 4. 4. 36 th St / Hill Rd / Catalpa Dr Unfunded 2,543,000 Safety & diversion of vehicles east on Hill Road 5. 5. Emerald St / Five Mile Rd 2013 Included w/ Five Mile roadway project 6. 6. Cloverdale Rd / Franklin Rd 2010 Included w/ Franklin roadway project Safety Change in V/C** Safety Change in V/C** 7. 7. Fairview Ave / Cole Rd Unfunded 9,527,000 Safety 8. 8. Cloverdale Rd / Ustick Rd Planned Development 5,805,000 Safety Note: Franklin / Five Mile (2011), Fairview / Five Mile (2010), Cloverdale / Ustick (Planned Development) are t included in this list, since they will be rebuilt with abutting roadway projects. ** Change V/C:. Evaluates the change in volume to capacity ratio with the rebuilt intersection.

Boise s Priority Intersection Intersections New Signalization DRAFT Boise City s Recommendations September 4, 2009 Based on Information from ACHD s 2010-14 FYWP Listed Construction Yr Listed Total Cost Funds Expended / % of Total Comments 1. Maple Grove / Hackamore 2011 1,596,000 120,437 Concerns about safety and congestion. 2. State St (SH 44) / Bogart Unfunded 644,000 79,448 Safety/accidents 3. Federal Way / Victory Unfunded 116,000 0 Accidents 4. Boise Ave / Linden (does t meet warrants) ne listed estimate Accidents & pedestrians Near a high school 5. ParkCenter / Bown Future n/a Accidents & pedestrians Near elem. school Additional Considerations: Intersections that meet warrants Farman / Gowan Unfunded $1,526,000 Franklin / Liberty Unfunded $1,994,000 Maple Grove/ Desert Unfunded $2,578,000 Non-Roadway or Specific Intersection Projects: ITS Phases 1-3, Arterial Dynamic Message Signs Unfunded Downtown Boise Traffic Signal Retiming Unfunded

Boise City's Draft List for ACHD's Community Programs FY 2011-2015 September 4, 2009 09 Boise draft Rank Construction Year Projects in Boise City School (# shows Boise School District Priority) FYWP 2011-15 1 2011 Pennsylvania St, Longmont Ave / Leadville Ave (received a Neighborhood Reinvestment Grant from Boise) Benefit walkers to Garfield Elem. Bus Route connects to bus Park or Library w/in general area Neighborhood Shopping 2 2011 Sunset Ave, 38th / 32nd (sidewalks) (concept work to begin soon) 15. Benefits walkers to Taft Elem. & Hillside JH. connects to bus 3 2012 Collister Dr, State / Hill (c,g,s/w, bikes both sides) 16. Elim. busing to Cynthia Mann Elem w/ Bloom sidewalk. Benefits walkers to Collister Elem. & Hillside JH. 4 2013 State, Collister/VMP (rth side sidewalk/pathway and possible pedestrian crossing) 18. Benefits Hillside JH walkers & Taft Elem. walkers on the rth side of State St. abuts bus abuts bus 5 2011 Orchard, Targee / Overland (east side) direct connection to school abuts bus 6 2011 Pierce Park, State/Hill (asphalt w c,g,s/w gaps) Benefits walkers to Pierce Park Elem. & Riverglen JH. abuts bus and connects to State St bus direct connection to park direct to library, & direct to library and direct to library and t k direct connection/abuts direct connection 7 2011 Curtis, Overland/Franklin 4. Benefits Grace Jordan walkers, and eliminates safety busing. abuts bus 8 2010 Cassia, Curtis/Orchard (south c,g,s/w) 2. Benefits Borah HS walkers and eliminates safety busing to abuts bus Grace Jordan. 9 2011 Roosevelt, Cassia/Rose Hill (west side detach s/w) 8. Eliminates busing to Jefferson Elem. & benefit Jr High & Borah walkers. 10 new Pennsylvania, Boise/Parkcenter (s/w gap on south side) abuts bus 19. Helps elim. Busing to White Pine Elem. w/ ped crossing light. abuts bus 11 new Roosevelt, Overland/Cassia (s/w at least on west 12. Helps elim. busing to Monroe Elem. & benefit SJH and Borah side). Boise staff requests to add the block to the south walkers. to Nez Perce to this project. 12 2010 Bloom, State/Collister (c,g, s/w gaps on rth side) 14. Eliminates busing to Cynthia Mann Elem. w/ Collister improvmts. Benefits Hillisde JH walkers and Collister Elem. walkers. 13 new Fairview Ave, Milwaukee/Maple Grove (s/w gaps) 5. Elimomates busing to Horizon Elem & benefits Fairmont JH walkers. abuts bus connects to 2 s, including State St. connects to 14 new Cherry Ln, Owyhee/Vista (s/w gaps) 10. Benefits South JH, Whitney Elem. & Owyhee Elem. walkers. connects to 15 new Kootenai, Roosevelt/Vista (s/w on both sides) 21. Benefits walkers to South JH & Monroe Elem. connects to 2 s 16 new Irving, Kimball/Mitchell (s/w gaps) 9. Benefits Horizon Elem. Walkers. connects to 17 2011 Randolph, Aurora/Cameron 17. Redesign intersection. Benefits walkers to Grace Jordan Elem. & Borah HS. to park w/in area w/in area w/in area to park to park direct direct direct

Boise City's Draft List for ACHD's Community Programs FY 2011-2015 September 4, 2009 09 Boise draft Rank Construction Year Projects in Boise City School (# shows Boise School District Priority) FYWP 2011-15 Bus Route Park or Library 18 new Cole, McGlochlin/Victory (s/w on both sides) 23. Benefits walkers to West JH & Maple Grove Elem. direct to future park 19 new Five Mile, Victory/Amity (s/w both sides) 6. Eliminates busing to Amity Elem. 20 scoping Amity, Five Mile/Carie Way (s/w rth side) 7. Eliminates busing to Amity Elem. 21 new Highlands Elem School area, ped ramps, xings, signs 3. Benefits Highlands Elem. 22 2010 Cloverdale, Briarwood/Ustick (west detached asphalt) Benefits Ustick Elementary school Neighborhood Shopping PD Hill Rd w/o Pierce Park (assumed grant)

Boise draft Rank PROJECTS IN BOISE (t on Draft List) # Community Programs of 129 ACHD PRIORITY RANK Origin CITY LIMITS SCHOOL DISTRICT SD REQUEST NUMBER Bike Master Plan Route NOTES 1 Boise, Bown/Holcomb App B Boise PBL SENA approved for a Boise Reinvest Grant for this project ($15K) 2 Boise, Capital/Joyce 28 PBTP B Boise PBL SENA approved for a Boise Reinvest Grant for this project ($18K), hi 3 Boise, Holcomb/Eckert App B Boise PBL SENA approved for a Boise Reinvest Grant for this project ($69K) Repare or replace curb ramps identified in the application, identify a 7 Boise Ave Curb Ramps App B Boise PBL facilities repairs required within the project limits 6 Cole, W Rim Acres/Victory 79 BSD AC Boise 14 PBL Sidewalk on both sides of Cole 4 Gekeler, Linden/Carter App B Boise PBL SENA approved for a Boise Reinvest Grant for this project ($22K) Curb, Gutter, Sidewalk on S side of road to match extisting; may also appears that sidewalk can be placed within ACHD ROW and will mak 9 Madison Ave, 27th/125' E App B Boise N continuous 10 Overland, Vista / Federal Way 65 PBTP B Boise PBL Project recommended by the ACHD Traffic Department; filling in ga Small sidewalk segment on N side of River. Provides a connection fo 11 River St, Americana/Interfaith Sanctuary 42 PBTP B Boise N Interfaith Sanctuary Scoping Alternates 5 Mitchell, Victory/Amity 65 BSD AC Boise 9 N Sidewalk on Mitchell from Victory and the pathway connection to A Have had several requests from the neighborhood and Commission approach; Include neighborhood in discussions; neighborhood requ 8 Mountain View, Cole/Ustick 53 App B Boise ESR side be completed 12 Roadway Projects Amity, Federal Way / Surprise Way NA B PBL Widen to 3 lanes with bike lanes in either direction and a signal at H Intersection Projects ne in Boise Key Project Origin Codes Pedestian Bicycle Transition Plan Application City Request Boise School District Request PBTP App CR BSD

Draft Priority Downtown Requests Front & 8th: Increase time on pedestrian crossing 1 light during n-peak hours to better accommodate event foot traffic. Capitol & Broad: Install new countdown 2 pedestsrian crossing light and crosswalk. 3 Capitol & Grove: Install new countdown pedestsrian crossing light and crosswalk. 4 5 9th & Grove: Install new countdown pedestsrian crossing light and crosswalk. 9th & Broad: Install new countdown pedestsrian crossing light and crosswalk. 6 7 8 9 10 Grove St, 3rd St/4th St (curb, gutter, sidewalk - 165 foot gap on south side) Front St & 8th and Myrtle St & 8th: Update pedestrian crossing markings with paint or other solutions. 11th St, change to two-way street 12th St, change to two-way street 13th St, change to two-way street 11 14th St, change to two-way street 12 Review/Study Downtown Boise Mobility Study's recommendation to convert State St & Jefferson St to 3-lane streets with 2-lanes in one direction and 1-lane in the other direction. This expands the current capacity & allows for tree-lined streets.

Requests to ITD Location Eagle Road (Hwy 55), State St/I-84 Broadway Bridge Project Resurface Rebuild w/ upgrades to Ped, Bike & connections to greenbelt Front St & 8th and Myrtle St & 8th Front St at 9th St Update pedestrian crossing markings with paint or other solutions Add double left turn lanes (second lane = left turns and thru vehicles)