SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

Similar documents
Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Solana Beach Comprehensive Active Transportation Strategy (CATS)

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Where We Live and Work Today

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Non-Motorized Transportation 7-1

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

City of Richmond Bicycle Master Plan

4.11 Transportation and Traffic

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

SUMMARY OF TRANSPORTATION INVESTMENTS

5. RUNNINGWAY GUIDELINES

TABLE OF CONTENTS. Executive Summary

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

City of Charlottesville Bicycle and Pedestrian Master Plan Update

North Coast Corridor:

Chapter 5 Future Transportation

CHAPTER 1 INTRODUCTION

The Big Picture. FY Bicycling Highlights

FUNDING SOURCES CHAPTER 6

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Appendix 3 Roadway and Bike/Ped Design Standards

City of Wilsonville 5 th Street to Kinsman Road Extension Project

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

INFRASTRUCTURE: Using the Grid to Create a more Self-Sustaining Downtown. Studio Spring 2013

2.0 Existing Conditions

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME

INTRODUCTION. General Plan 1 June 21, 1994 (rev. July 1, 2008)

Appendix U5. California Coastal Trail Technical Memoranda

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

August 3, Bay Trail Connection With The Community

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

SOLANA 101 MIXED USE PROJECT 1.91 ACRES

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Recommendations. Central Salem Mobility Study

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Broadway Complete Streets Project

Circulation and Parking

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Attachment 1. State of. the

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Chapter 7 Nonmotorized Facilities

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

General Design Factors

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Circulation and Mobility

3.0 PROJECT DESCRIPTION

PEDESTRIAN ACTION PLAN

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Vision to Action Community Coalition February 14, 2014 Briefing

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b)

Bicycle Master Plan Goals, Strategies, and Policies

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

Chapter 5. Complete Streets and Walkable Communities.

Our Mission What We Stand For

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS


Complete Streets Checklist Process

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Basalt Creek Transportation Refinement Plan Recommendations

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Route 7 Corridor Study

Bicycle Master Plan. City of Escondido. Case File No. PHG

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

CITY OF LOMITA CITY COUNCIL REPORT

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

3.16 TRANSPORTATION AND TRAFFIC

4.11 TRANSPORTATION/CIRCULATION

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

3.10 TRAFFIC AND CIRCULATION

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

COMMUNITY PARTICIPATION CHAPTER 8

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

SANTA MONICA BOULEVARD CORRIDOR

Duwamish Way-finding and CTR Report

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Chapter 3 DESIGN SPECIFICATIONS

East Burke Transportation, Safety and Capacity Improvements

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Santa Clara I-280 CORRIDOR STUDY

CONTENTS INTRODUCTION... 1 PURPOSE AND SCOPE... 1 MOBILITY ELEMENT TRANSPORTATION REPORT... 2 ROADWAY COMPONENT... 3 OPPORTUNITY AREAS...

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Staff Report City of Manhattan Beach

Terwillegar Drive Expressway Draft Concept Plan

Transcription:

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005

Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed by the Circulation Element of the City s General Plan. The Solana Beach Bikeway Master Plan was prepared to provide a framework for the planning and development of bicycle programs and facilities through the year 1999. The document was again reviewed by the City Council on November 13, 1996 and readopted for relevancy and consistency to the City s General Plan and community needs. The purpose of this second addendum is to update the Bikeway Master Plan and first addendum and rename the document as the Bicycle Transportation Plan. All future references to the Bicycle Transportation Plan in this document should be interpreted to refer to the Bikeway Master Plan, dated June 1993, the Bikeway Master Plan Addendum, dated June 1996 and this Bicycle Transportation Plan, dated January 2005. California Government Code Section 891.4 contains provisions for local agencies to prepare a bicycle transportation plan. The California Department of Transportation (Caltrans) requires that the bicycle transportation plan must be adopted by the local agency after January 2001. The regional transportation planning agency (San Diego Association of Governments or SANDAG) and the Caltrans Bicycle Facilities Unit must also approve the plan. SANDAG reviewed and approved the Bicycle Transportation Plan in January 2005. A copy of the Bicycle Transportation Plan will be forwarded to the Caltrans Bicycle Facilities Unit for review and approval as part of the grant application submittal for the Fiscal Year 2005/2006 Bicycle Transportation Account program. Background The City of Solana Beach is a small coastal community located along the San Diego coast. The City is bisected by the scenic coast Highway 101 and the parallel coastal freeway, Interstate 5. Lomas Santa Fe Drive provides direct access from the freeway to the commercial core of Solana Beach and coastal beach access. Also paralleling Highway 101 is an active rail corridor providing commuter rail service, the Coaster, from Oceanside to San Diego, Amtrak services to Los Angeles and along the western coast, and freight service. A transit station at the northeast corner of Lomas Santa Fe Drive and Highway 101 provides local and regional rail and bus services to the community. There are two main bicycle facilities in Solana Beach. One is located along Highway 101 paralleling the tracks, and the other is located along Lomas Santa Fe Drive. Parallel to Highway 101, there is a Class 2 bike lane and a Class 1 bike path. The Class 1 bike path is the recently completed Solana Beach portion of the Coastal Rail Trail, which runs the entire length of the city. The three coastal cities to the north of Solana Beach Page 1 of 4

(Encinitas, Carlsbad and Oceanside) are in varying stages of design and construction of additional portions of the Coastal Rail Trail. Once completed, the Coastal Rail Trail will provide a direct bicycle corridor from Oceanside to downtown San Diego. Currently, a bicycle commute to downtown San Diego is approximately 30 miles long, from Solana Beach, using a combination of Class 1, Class 2 and Class 3 bike paths/lanes. The San Diego County coast is an active bicycle corridor for cyclists bicycling along the coast and with such destination points as Torrey Pines state park, beach access points, shops and restaurants. Lomas Santa Fe Drive provides access to the beach from the inland communities of Rancho Santa Fe, Escondido and Rancho Bernardo along the Del Dios Highway bicycle lanes. The intersection at Lomas Santa Fe Drive and the coast Highway 101 has been documented as having the second highest number of bicyclists, Bicycle Counts at Selected Intersections in San Diego County, SANDAG 1990. Bikeway Facilities The City of Solana Beach completed a Bikeway Master Plan in 1993. The first addendum to the plan was completed in 1996 and the second addendum, which renamed the entire document to the Bicycle Transportation Plan, was completed in January 2005. The original Bikeway Master Plan was funded by TransNet (Proposition A) funds. The Bicycle Transportation Plan identifies two designated Class 2 bikeways in Solana Beach. The two Class 1 facilities were constructed in the 1970 s by the County of San Diego, prior to the city s incorporation. The Class 1 bike path was completed in 2004. The funds to maintain the bicycle facilities have been allocated through the General Fund. Lomas Santa Fe Drive provides Class 2 bike lanes in both east and west directions linking the coast to inland communities of Rancho Santa Fe, Rancho Bernardo, and Escondido. The width of the lanes vary from 5 to 7 and is reduced at the Interstate 5 undercrossing to approximately 4. Once the Interstate 5/Lomas Santa Fe Drive interchange is rebuilt (construction anticipated to begin in 2006), the bike lane under Interstate 5 will be increased to 7 wide and will be separated from vehicles. The Highway 101 corridor is a Class 2 facility in both north and south directions on either side of the road. In addition, the recently completed Solana Beach portion of the Coastal Rail Trail constructed a Class 1 bike path for both the north and southbound directions. At the end of the Coastal Rail Trail, bicyclists are directed onto the Class 2 bikeways along Highway 101 at traffic signals. Additional bicycle facilities located within the City include the installation of a standard Class 3 bikeway along Highland Avenue and San Andres Drive funded with Transportation Development Act (TDA) funds. The City installed loop detectors at the Page 2 of 4

intersection of North Highway 101 and Solana Vista Drive through the use of TDA funds as well. Installation of loop detectors at the intersection of Lomas Santa Fe Drive and Highway 101 was funded through a $14,000 grant from the TransNet fund. Operating and maintenance costs for Class 2 bike lanes are minimal and generally included in the annual budget for the roadways themselves, Class 1 bike paths require additional maintenance and enforcement as do bicycle storage facilities, such as bike racks and lockers. The estimated annual maintenance costs for the Class 1 facility is $18,000 (based on $10,000 a mile annual maintenance). This maintenance cost only includes maintenance of the bike path and not any adjacent facilities such as landscaping. The city is also pursuing two bicycle/pedestrian bridges to connect the portion of the city east of the railroad tracks with the area west of the railroad tracks. The first bridge will cross the railroad tracks between extensions of Rosa Street (on the east side) and Dahlia Drive (on the west side). The Rosa Street Bridge is currently under construction. It is anticipated that construction will be complete in the Spring of 2005. The second bridge will cross the railroad tracks along the alignment of East and West Cliff Street. The Cliff Street Bridge is currently in design. Construction should begin in late 2005. The following is a summary of the funding programs for which the City has applied for or has received an award of grant funds and the status of the project: Program Purpose Status Amount TransNet Bikeway Master Plan (June 1993) Complete $20,000 TransNet Linear Park Master Plan Complete $35,000 TDA Loop Detectors Highway Complete $2,000 101/Solana Vista Drive TDA Highland Drive Class 3 Complete $2,000 Bikeway AB 2766 APCD Funding Rough Grading Design Complete $54,000 TDA and TransNet (Prop A) Bicycle Path Design Complete $45,000 TransNet (Prop A 96/97) Linear Park Bikeway Complete $267,000 TDA and TransNet (Prop A) Class 2 Bikeway Lomas Santa Complete $15,200 Fe near Rios Avenue TDA and TransNet (Prop A) Rosa Street Bicycle/Pedestrian Under $907,000 Bridge Construction TDA Loop Detectors Highway Complete $14,000 101/Lomas Santa Fe Drive Various Local, State and Coastal Rail Trail Complete $3,658,900 Federal Funding Sources Bicycle Transportation Account* Cliff Street Bicycle/Pedestrian Bridge In Design $1,556,300 * - city to submit application for construction grant funding in February 2005 Page 3 of 4

Conclusion The intent of the Bicycle Transportation Plan is to provide a comprehensive document for planning for bicycle facilities. Additionally, it is the intent of the bicycle plan to provide facilities that will be used by the community and visitors. Overall, the use of bicycle facilities is based on the quality and type of facility provided, bicycle awareness, personal goals and physical limitations. In order to increase bicycle ridership and frequency, which ultimately benefits the community, the air quality and the individual, it is recommended that the City consider a commitment to improve the number of persons who cycle. The city strives to improve the existing bikeway facilities and to offer additional types of facilities which will encourage the use of bicycling for commuting and recreation. This is done by maintaining existing Class 1 and Class 2 facilities in Solana Beach and providing alternative routes when existing routes are being altered or under construction. Additionally, the city will periodically review existing bicycle facilities to ensure that the facility provides a safe alternative transportation corridor for the cycling community. Page 4 of 4