SLIDE RAIL INSTALLATION GUIDE MANUFACTURE S TABULATED DATA

Similar documents
"STEEL FRAMED" ALUMINUM PANEL SHIELDS

SPEED SHORE MANUFACTURER S TABULATED DATA MANGUARDS. October 31, 2005

MODULAR ALUMINUM PANEL SHIELDS MAPS

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

STEEL TRENCH SHIELDS TUFF-LITE MODELS

STEEL TRENCH SHIELDS DW MODELS

"DW" TRENCH SHIELDS "SP" TRENCH SHIELDS "TL" TRENCH SHIELDS "SW" TRENCH SHIELDS MANHOLE SHIELDS

Tabulated Data Lite-Shield 20 System

Aluminum Sheeting Guide (ASG)

VERTICAL SHORES TRENCH RESCUE SHORES MEGA-SHORES

Seattle City Light Construction Management

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

Safety Policy and Procedure

BP OIL -- TOLEDO REFINERY

FALL PROTECTION / ELEVATED WORK

Excavation and Trenching

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

Management Plan for Electrical Safety ISD #535

Required Courses. Total Hours 39

Minimum Safety Requirements for Contractors Working on Railway Property

Take the high road to ensure underground safety.

ARKANSAS TECH UNIVERSITY FACILITIES MANAGMENT HEALTH AND SAFETY MANUAL

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

OSHA 30 Syllabus. Laborers Training School. Time: 40 hours. Maximum Class Size: 30. Prerequisites: None

Lockout/Tagout - Energy Control Program

Excavations and Trenches

Ground Release Shackle

FALL PROTECTION COMPARISON BETWEEN VARIOUS OSHA STANDARDS, NAVY and EM 385 (2008) REQUIREMENTS

Aerial Lift Safety Program

OSHA Federal Standards October 1, 2016 September 30, 2017

TRENCHING/SHORING/EXCAVATIONS Revision Date: 04/2017

Construction OS&H Working at or below ground level

A N C H O R T A B S N O R T H W E S T ANCHOR TAB VF. Patented. User Instructions

Update 29 CFR Subparts D & I

Safety Manual Section 6 Confined Space

LIFTING RIG Multi-Product Installation Rig

Risk Control at United Fire Group

Pannier Corporation Health and Safety Handbook Marking System Group Aerial Lifts Original Date: Section: Revision date: Page: 12/5/ of 11

INSTRUCTIONS FOR USE

SECTION FACILITY FALL PROTECTION PART I - GENERAL

Confined Space in Construction

Crane Rental Heavy Machinery Moving Project Management

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

User Instructions 1790 Rail Anchor

Equipment Operation Procedures

Fall Protection Resource Guide P AGE 1


Walking-Working Surfaces

FALL PROTECTION INTEGRITY QUALITY INNOVATION

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Proper Operation of Heath Consultants Incorporated Plunger Bar

1.0 Scope and Application

Occupational Protective Equipment

FA L L P R O T E C T I O N P L A N N I N

TRENCHING & EXCAVATION SAFETY: The Scott May Story

OSHA for Weatherization Contractors and Inspectors. Joann Natarajan OSHA Austin Office

STRAIGHT POLE TENSIONED BATTING TUNNEL POLE LAYOUT

Why Update. OSHA updated Walking Working Standard. Who & What it Covers. Housekeeping (a) 6/25/ nd Leading cause of Workplace fatalities

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

User Instructions 1789 Parapet Wall Anchor

ROOFING FALL PROTECTION 27.I

Versie Date: USAGE AND SAFETY MANUAL SPREADERBEAMS

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.

Walking-Working Surfaces Fall Protection Program

Lock Out - Tag Out Safety Program

INSTRUCTIONS FOR USE

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

PIP PNE00012 Piping Examination and Leak Test Guide

OSHA s new walking working surfaces standards

Fall Protection / Open Holes & Guardrail

CHAPTER 10 FALL PROTECTION

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

Management Plan for Compressed Gas

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

Section 38 Brieser Construction SH&E Manual

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces

Operator's Manual Supplement

Region: USA Language: EN Number : TB0031 Revision : B. Total Page: 3 Page n : 1 First Issue: 10/2014 Rev. Date: 10/08/2014

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Monitoring excavation in the highway

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

SAFETY DIRECTIVE 3.0 REFERENCES. 3.1 See Appendix B

Climbing Stick OWNER S MANUAL

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles

FALL PROTECTION AND RESCUE PLAN NS-MAYPORT BLDG RENOVATION PROJECT. (Revised Copy 11/19/2010)

2.25 Work Equipment Policy and Procedure Table of Contents

8. Fall Protection Procedures WAC

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

29 CFR 1926, Subpart M. Fall Protection Program Table of Contents

Due to. manual. in one day. telescoping. designed to. established. 1 Pag. g v2.0

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Product Information Report Lockout/Tagout Hazardous Energy Control

EM385 Construction Safety and Health Certification Course Section 12 Control of Hazardous Energy

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

Transcription:

SLIDE RAIL INSTALLATION GUIDE MANUFACTURE S TABULATED DATA 3330 S. Sam Houston Pkwy Houston, Texas 77047 (713)943-0750 USA Toll Free 1-800-231-6662 Fax (713)943-8483 Www.speedshore.com PRINTED IN U.S.A. COPYRIGHT 2005 SPEED SHORE CORPORATION. ALL RIGHTS RESERVED

MANUFACTURERS TABULATED DATA SLIDE RAIL SYSTEM January 1, 1995 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Tel: (713) 943-0750 U.S.A. Toll Free: (800) 231-6662 Fax: (713) 943-8483 COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 1995

January 1, 1995 SLIDE RAIL SYSTEMS Page 2 of 4 W A R N I N G EXCAVATION PROCEDURES MAY BE VERY DANGEROUS A TRAINED COMPETENT PERSON SHALL: SUPERVISE ALL EXCAVATION OPERATIONS, ENSURE THAT ALL PERSONNEL ARE WORKING IN SAFE CONDITIONS, AND HAVE THOROUGH KNOWLEDGE OF THIS TABULATED DATA. THE COMPETENT PERSON SHALL HAVE THE AUTHORITY TO STOP WORK WHEN IT IS UNSAFE FOR WORKERS TO ENTER AN EXCAVATION. ALL PERSONNEL SHALL BE TRAINED IN CORRECT EXCAVATION PROCEDURES, PROPER USE OF THE PROTECTIVE SYSTEM AND ALL SAFETY PRECAUTIONS. EXCAVATIONS AND PROTECTIVE SYSTEMS SHALL BE INSPECTED A MINIMUM OF ONCE EACH WORKING DAY AND WHENEVER THERE IS A CHANGE OF SOIL, WATER OR OTHER JOB SITE CONDITIONS. ALL LIFTING AND PULLING EQUIPMENT, INCLUDING CABLES, SLINGS, CHAINS, SHACKLES AND SAFETY HOOKS SHALL BE EVALUATED FOR SUITABILITY AND CAPACITY, AND SHALL BE INSPECTED FOR DAMAGE OR DEFECTS PRIOR TO USE. ALL INSTALLATION AND REMOVAL OF SHORING AND SHIELDING SHALL BE FROM ABOVE GROUND ONLY. DO NOT ALLOW PERSONNEL TO ENTER AN EXCAVATION THAT IS NOT PROPERLY SHORED, SHIELDED OR SLOPED. PERSONNEL SHALL ALWAYS WORK WITHIN THE SHORING AND SHIELDING. PERSONNEL SHALL NOT STAND ON THE EDGE OF AN UNSHORED EXCAVATION. ALL PERSONNEL SHALL ENTER AND EXIT EXCAVATIONS ONLY WITHIN SHIELDED OR SHORED AREAS. THIS SPEED SHORE TABULATED DATA IS A GENERAL SET OF GUIDELINES AND TABLES TO ASSIST THE COMPETENT PERSON IN SELECTING A SAFETY SYSTEM AND THE PROPER SHORING OR SHIELDING EQUIPMENT. THE COMPETENT PERSON HAS SOLE RESPONSIBILITY FOR JOB SITE SAFETY AND THE PROPER SELECTION AND INSTALLATION AND REMOVAL OF THE SHORING OR SHIELDING EQUIPMENT. THIS TABULATED DATA IS NOT INTENDED TO BE USED AS A JOB SPECIFIC EXCAVATION SAFETY PLAN, BUT SHALL BE USED BY THE COMPETENT PERSON TO SUPPLEMENT HIS TRAINING, HIS EXPERIENCE AND HIS KNOWLEDGE OF THE JOB CONDITIONS AND SOIL TYPE. COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 1995

January 1, 1995 SLIDE RAIL SYSTEMS Page 3 of 4 SPEED SHORE TABULATED DATA 1.0 SCOPE 1.1 Speed Shore's Tabulated Data complies with the O.S.H.A. standards as stated in the Code of Federal Regulations 29, Part 1926, Subpart P - Excavations, Section 1926.652(c)(2). This data shall only be used by the contractor's competent person in the selection of Speed Shore Slide Rail Systems. The competent person shall be experienced and knowledgeable in trenching and excavation procedures, soil identification and in the use of Speed Shore Slide Rail Systems. 1.2 All personnel involved in the installation, removal and use of Slide Rail Systems shall be trained in their use and advised of appropriate safety procedures. All operating instructions must be followed. 1.3 This data is based, in whole or in part, upon requirements stated in CFR 29, Part 1926 and applicable portions of CFR 29, Part 1910. The competent person shall know and understand the requirements of those parts before using this data. 1.4 Whenever there is a variance between this Tabulated Data and CFR 29, Part 1926, Subpart P - Excavations, this Tabulated Data shall take precedence. Whenever a topic or subject is not contained in this Tabulated Data, the competent person shall refer to CFR 29, Part 1926, Subpart P - Excavations. 1.5 Tables MSS-1 shall be used only in excavations with soil conditions as noted. For other soil and excavation conditions and depths, site-specific engineered designs are required. Contact Speed Shore Corporation for assistance 1.6 This Tabulated Data is applicable for standard products manufactured exclusively by Speed Shore Corporation and may only be used with Speed Shore manufactured products. Any modification or repair of Speed Shore products not specifically authorized by Speed Shore Corporation voids this data. 1.7 This data refers to the Code of Federal Regulations, 29, Parts 1910 and 1926. In states that have their own state O.S.H.A. refer to similar regulations in the current construction rules published by the state office of Occupational Safety and Health. 2.0 SOIL CLASSIFICATIONS 2.1 In order to use the data presented in Tables MSS-1, the soil type or types, in which the excavation is cut must first be determined by the competent person according to the O.S.H.A. soil classifications as set forth in CFR 29, Part 1926, Subpart P, Appendix A. 2.2 Table MSS-1 is for soil Types A,B, C, and C-60. See 2.3 definition for C-60 soil. 2.3 Type C-60 soil is a moist, cohesive soil or a moist dense granular soil, which does not fit into Type A or Type B classifications and is not flowing or submerged. This material can be cut with near vertical sidewalls and will stand unsupported long enough to allow the Slide Rail Systems to be properly installed. The competent person must monitor the excavation for signs of deterioration of the soil as indicated by, but not limited to, freely seeping water or flowing soil entering the excavation around or below the sheeting. An alternate design for less stable Type C soil will be required where there is evidence of deterioration. 2.4 Water flowing into an excavation, from either above or below ground, will cause a decrease in the stability of the soil. Therefore, the competent person shall take action to prevent water from entering the excavation and remove any water that accumulates in the excavation. Closer monitoring of the soil is required under wet conditions, particularly in less cohesive (weaker) soil conditions. A small amount of water, or flowing conditions, may downgrade the soil classification to a less stable classification. A large amount of water, or flowing conditions, may downgrade all soils to O.S.H.A. Type C. Speed Shore shoring and shielding systems may be used safely in wet conditions when the excavation is monitored by the competent person. Example: When repairing a leak in utility lines, it is often difficult or even impossible, to keep water out of the excavation. COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 1995

January 1, 1995 SLIDE RAIL SYSTEMS Page 4 of 4 3.0 BASIC AND LIMITATIONS OF THE DATA 3.1 Table MSS-1 shows the maximum excavation depth that Speed Shore Slide Rail Systems may be used for the lengths of the panels shown in column 1. 3.2 Table MSS-1 is for O.S.H.A. soil Types A,B, C and C-60. Sec 2.3 for definition of C-60 soil. 3.3 For depths deeper than 32 ft. consult Speed Shore. 3.4 Vertical spacing of spreaders in limited by the strength of the Vertical Slide Rail Post. The bending moment strength of the Slide Rail Post is 504,700 ft.-lb. TABLE MSS-1 NOMINAL CAPACITY MAXIMUM ALLOWABLE DEPTH (FEET) PANEL TYPE A TYPE B-35 TYPE B-45 TYPE C-60 TYPE C LENGTH P.S.F. SOIL SOIL SOIL SOIL SOIL FEET 12 feet 3,500 32 32 32 32 32 16 feet 2,000 32 32 32 32 28 20 feet 1,300 32 32 31 24 19 COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 1995