Similar documents
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Existing Transportation System

Joe Routt Boulevard. Access Design Options

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

See Figure 38, Existing Nonmotorized Connections.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

TRAFFIC MANAGEMENT PLAN

Multi-Modal Traffic Analysis. Parisi and Associates

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

ELEMENT 11 TRANSPORTATION ELEMENT

Traffic Impact Memorandum. May 22, 2018

Traffic Study North Shore School District 112

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

I 10 Phoenix to California Border Multimodal Corridor Profile Study

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

SANTA MONICA BOULEVARD CORRIDOR

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

Sebastopol Charter School Traffic Management Plan

Addendum to Mitigated Negative Declaration

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Michael A. Werthmann, PE, PTOE Principal

1. Provide a dedicated westbound approach bus lane at the intersection;

This chapter describes the proposed circulation system and transportation alternatives associated with

CPC Parking Lot Riverside Drive. Transportation Rationale

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

Niantic Center Elementary School

TRANSPORTATION NEEDS ASSESSMENT

Chapter 5 Future Transportation

Santa Ana Creating Community Together

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Lake Whitney Elementary School

Hidden Oaks Elementary School

San Ramon Elementary School. Travel Plan

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Access Routes from US 101 to the Richmond San Rafael Bridge

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

EXECUTIVE SUMMARY. The primary challenges identified are:

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

U.S. Equities Realty. Luay R. Aboona, PE Principal. Traffic and Parking Evaluation Fourth Presbyterian Church of Chicago Chicago, Illinois

Welcome. If you have any questions or comments on the project, please contact:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

Sarasota High School June 26, 2018

Traffic Circulation & Pedestrian Safety Study

CHAPTER 3. Transportation and Circulation

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

Transportation-Demand Management Community Presentation

b. executing legal agreements with respect to the above.

3.0 PROJECT DESCRIPTION

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

Bay to Bay Boulevard Complete Streets Project

Eliminate on-street parking where it will allow for a dedicated bus only lane %

5 Transit & Traffic. Overview

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Chapter 2: Standards for Access, Non-Motorized, and Transit

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

TRANSPORTATION TRAINING TOPICS. April 6, 2010

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Durrance Elementary School

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Trip Generation for an averaged sized elementary school in Provo, Utah

Average Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Existing Transportation System

3.9 - Transportation and Traffic

11/28/2016 VIA

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Sixth Line Development - Transit Facilities Plan

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Meadow Woods Elementary School

Duwamish Way-finding and CTR Report

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

7 Access, Circulation and Parking Framework

INNOVATIVE INTERSECTION DESIGN

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Vallecito Elementary School. Travel Plan

PEDESTRIAN ACTION PLAN

Community Bicycle Planning

North Turnaround. Option 3: Best facilitates transfers from local to rapid transit services. High cost

RZC Appendix 8A Marymoor Subarea Street Requirements

3.0 Future Conditions

UNIVERSITY OF ARIZONA NEEDS ASSESSMENT STUDY

Point Defiance Park. Master Plan

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

Transcription:

CIRCULATION, PARKING AND ALTERNATIVE TRANSPORTATION PLANS

2 VEHICULAR CIRCULATION / PARKING PLAN FUTURE GARY DRIVE PRIMARY VEHICULAR CIRCULATION 90 SECONDARY VEHICULAR CIRCULATION PRIMARY SERVICE ACCESS 43 10 3 SCAT BUS ROUTE PEDESTRIAN DROP-OFF BUS STOP PRIMARY CAMPUS ENTRY SECONDARY CAMPUS ENTRY ROSE AVENUE 928 BICYCLE RACK/STORAGE FUTURE TRAFFIC SIGNAL NEEDED 100 FUTURE PARKING EXPANSION (estimated future parking spaces indicated) 106 348 EXISTING PARKING (number of spaces indicated) 0 60 N 0 200' 400' 600' BARD ROAD SANT VALLEY

VEHICULAR CIRCULATION / PARKING PLAN The Vehicular Circulation and Parking Plan for Oxnard College was developed in close collaboration with Associated Transportation Engineers (ATE) of Santa Barbara. The main components of the plan are summarized here. Additional information on circulation and parking is contained in Appendix 2 and in the Oxnard College Facilities Master Plan Environmental Impact Report prepared by Rincon Consultants. CAMPUS LOOP ROAD A new campus loop road places major campus traffic and vehicular entries at the periphery of the campus thereby reducing the potential for vehicular/pedestrian conflicts. NEW SURFACE PARKING New north and eastern campus parking facilities that in conjunction with existing parking facilities to remain, will bring the campus total to about 2,700 to 2,800 spaces, give the campus an overall parking demand ratio of about 0.127 (this ratio includes a percent reserve factor to address peak period space hunting inefficiencies). The expanded parking facilities are also expected to provide adequate parking for community events such as the Oxnard Community Marketplace and the California Strawberry Festival. NORTH CAMPUS ROAD LIMITED VISITOR ACCESS The present North Campus Road will remain a restricted entry road open only to campus visitors (enrolling students, community persons utilizing community services programs offered at Oxnard College) and for Performing Arts Center special event parking. North Campus Road will be terminated west of the Child Development Center no longer serving as an internal campus circulator. NEW DROP-OFF FACILITIES Additional campus drop-off facilities will be provided along Rose Avenue (pull-out in line with the LRC) at various campus entries accessible from the new Campus Loop Road and at the Performing Arts Center. BUS FACILITIES AND ACCESS The Southern California Area Transit (SCAT) route Number 7 will continue to serve the campus, utilizing a campus loop path entering from Rose Avenue and exiting westbound onto Bard Road. An improved bus stop facility could be built in the current location or on the adjacent land along the south side of South Campus Road. As the campus grows, Oxnard College and the VCCCD should work with SCAT to provide better campus bus connections with the Oxnard Transportation Center and with the under-connected parts of the Oxnard College primary service area. SERVICE ACCESS / EMERGENCY ACCESS Additional service access will be provided to all new and/or relocated facilities. Dedicated access facilities will serve major centers requiring regular truck service access: The new Student Services Center and the Performing Arts Center. Campus pedestrian pathways will double as service ways for facilities needing only light vehicle or occasional truck service access. All campus roads, service ways and campus pathways will be devised to form a workable emergency vehicle access system. An emergency vehicle access plan will be developed based upon providing 2 foot wide clear heavy vehicle support lanes to serve all campus buildings. BICYCLE CONNECTIVITY New bike racks and or enclosures are planned at several locations on the campus to encourage bicycle use by student and community visitors. 3

4 ALTERNATIVE TRANSPORTATION PLAN EXISTING SCAT BUS ROUTE (route number indicated) POTENTIAL FUTURE SCAT ROUTE 8 (REROUTE THROUGH CAMPUS) POTENTIAL FUTURE CAMPUS DROP-OFF POINT EXISTING SCAT ON-SITE BUS STOP PROPOSED BICYCLE RACK LOCATION EXISTING CIT Y OF OXNARD CLASS 2 BIKE LANE FUTURE PARKING EXPANSION 8 EXISTING PARKING N 7 0 200' 400' 600'

ALTERNATIVE TRANSPORTATION PLAN BUS FACILITIES The Southern California Area Transit (SCAT) route Number 7 could continue to serve the campus utilizing the existing campus loop path entering from Rose Avenue and exiting west bound onto Bard Road. An improved bus stop facility could be built in the current location or on the adjacent land along the south side of South Campus Road. As an alternative, a new Route 7 loop through the campus could enter the proposed campus loop road at Rose Avenue and Gary Drive, proceed east along the campus loop road to service a new bus stop at the northern terminus of the campus walk/paseo de Las Palmas from which point it could proceed further along the campus loop road to another new bus stop at the Gym or further south at the walkway centered on the LRC. From that point, the new campus SCAT loop could proceed to the extended South Campus Road, turn west and connect with an updated bus stop facility in the current location and finish out its service to the campus on the present route. COMMUNITY AND REGIONAL BUS CONNECTIVITY Oxnard College and the VCCCD should work with SCAT to provide better campus bus connections with the Oxnard Transportation Center (OTC) and under-connected parts of the Oxnard College primary service area. In particular there may be an opportunity as the campus population grows to develop a dedicated bus connection with the OTC that would allow more rapid access to the campus from a central gathering point of the SCAT System. This may become more appropriate with the eventual development of College Park as a large community facility with regionally important programs. BICYCLE CONNECTIVITY New bike racks and or enclosures are planned at several locations on the campus to encourage bicycle use by student and community visitors. The campus lies along the route of two Class 2 (striped lane) bike paths: Rose Avenue and Bard Road. At the time of FMP publication, no new major bicycle routes were being considered in the Oxnard College area by the City of Oxnard. Widening and other improvements to Pleasant Valley Road between Bard Road and the Route 1/Oxnard Blvd. interchange could include a Class 2 bike lane facility.