PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. Existing 10' sidepath Existing 10' sidepath MATCH LINE. Project Number: 310. Drawing Number: 1/1

Similar documents
Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Lawrence Avenue Streetscape Concepts August 30, 2011

ADA Operations Contact Info

Emergency Response Support Signage on Multi-Use Trails Plan

Final Sidewalk Feasibility Study

Preliminary Engineering Study

Orange Center Elementary School

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

PEDESTRIAN CROSSING TREATMENTS

May 4, Dear Mr. Thomas and Mr. Snyder,

Welcome to the Quebec Alternatives Analysis Public Meeting

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

IMPLEMENTATION WORKBOOK

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

Route 47 (North Main Street) Reconstruction

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Henderson Ave. Complete Streets Project

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Establishing Procedures and Guidelines for Pedestrian Treatments at Uncontrolled Locations

Tonight is for you. Learn everything you can. Share all your ideas.

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Restoration Requirements

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Construction Newsletter No. 32 October 14, 2016 On-Going

Derby Street. Project Updates. Salem, Massachusetts

California Manual on Uniform Traffic Control Devices

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking


Board of Supervisors February 27, 2017

UF Center Drive Pedestrian Crosswalk Study Gainesville, Alachua County, FL. University of Florida Facilities Planning & Construction

Broad Street Bicycle Boulevard Design Guidelines

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

TRAFFIC IMPACT ANALYSIS

ACTION TRANSMITTAL No

Off-Road Facilities Part 1: Shared Use Path Design

Preparing a Curb Ramp Project. December 15, 2010

This page intentionally left blank.

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

Knox Street Complete Streets Project

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Water Street Promenade Engineering and Design Services

Retrofitting Urban Arterials into Complete Streets

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

New Orleans Complete Streets Experience CITY OF NEW ORLEANS. Louis Haywood Department of Public Works January 19, 2016

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

ADA Training Standard Plans

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Bases, Ballasts, and Paving

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Roosevelt Estates Neighborhood Improvements

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Designing for Pedestrian Safety in Washington, DC

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Omaha s Complete Streets Policy

COMMUNITY MEETING AGENDA

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

SECTION 14: LANDSCAPING AND BEAUTIFICATION

Lincoln Highway Streetscape Plan Concept Plan

Pine Point Study Committee. Report and Recommendations to Scarborough Town Council. December 10, 2009

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Minutemen Causeway Pedestrian Safety Study City of Cocoa Beach

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Guidelines for Pedestrian Treatments at Uncontrolled Locations

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Transportation Planning Division

FOR LOOP RAMPS-TAPERED DECELERATION LANE

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

Improving intersections for people that walk in Minneapolis

Chapter 2: Standards for Access, Non-Motorized, and Transit

GLOSSARY CROSSWALK. CROSSING TYPES

ADA PRESENTATION (CURB RAMPS)

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Committed to Service

CHAPTER 1 STANDARD PRACTICES

F L E T C H E R A V E N U E

NJDOT Complete Streets Checklist

Transcription:

Existing 10' sidepath Existing 10' sidepath otes: : One signpost with two signs (one facing north, one facing south). Attach to existing light pole 3.04 Existing s ew road edge ew lane lines (yellow) ew lane lines (white) ew s Date: 3/27/2012 Project umber: 310 Drawing umber: 1/1 Description: Lincoln from Lincoln Path to Michigan

Replace existing standard crosswalks with continental style crosswalks Remove existing 6' and replace with 10' sidepath Remove existing 6' and replace with 10' sidepath otes: : One signpost with two signs (one facing north, one facing south). Remove existing 6' (a total of 4598 sq ft of pavement) and replace with 10' sidepath (pour 7309 sq ft). Could also consider leaving 6' in place and adding an additional 4' of pavement to the west of the existing walk. Proposed walk will be 8" thick, have expansion joints at a maximum of 40' apart, have score joints at a maximum of 6' apart, and provide positive drainage at slope of ¼ inch per foot. Shorten nose of median by 9' 3.00 Install continental style crosswalk Existing s ew road edge ew lane lines (yellow) ew lane lines (white) ew s Date: 3/27/2012 Project umber: 320 Drawing umber: 1/1 Description: Lincoln from Pennsylvania to Florida

8.29 12.85 12.08 5.87 6.60 MUTCD W11-1 17.42 12.87 12.14 9.60 Road diet. Change from four lanes to two lanes with a two-way left-turn lane. Road diet. Change from four lanes to two lanes with a two-way left-turn lane., P2 Project umber: 540 Drawing umber: 1/2 Description: Lincoln Avenue from Hazelwood to Windsor

, P1 6.26 12.13 12.44 6.17 Road diet. Change from four lanes to two lanes with a two-way left-turn lane Road diet. Change from four lanes to two lanes with a two-way left-turn lane 5.55 11.99 11.61 12.02 9.08 MUTCD R4-4 6.02 11.97 11.96 12.03 9.32 Existing crosswalk Existing s ew road edge ew lane lines (yellow) ew lane lines (white) ew s otes: : Use one signpost with two signs, one facing north and one facing south. Proposed 6' wide walk will be 8" thick, have expansion joints at a maximum of 40' apart, have score joints at a maximum of 6' apart, and provide positive drainage at slope of ¼ inch per foot. Project umber: 540 Drawing umber: 1/2 Description: Lincoln Avenue from Hazelwood to Windsor

Existing crosswalk 12.97 Remove all parking on east side of street 13.04 6.01 13.03 13.22 6.00 MUTCD R4-4 Parking on west side of street to remain, as shown Remove all parking on east side of street MUTCD R4-4 8.62 6.01 10.78 6.03 10.16 6.24 12.02 5.88 Parking on west side of street to remain, as shown. Project umber: 520 Drawing umber: 1/2 Description: Lincoln Avenue from Florida to St. Mary's

otes: Design concept for Lincoln and St. Mary's intersection based on 2008 St. Mary's Road Corridor Study by the Champaign County Regional Planning Commission. Remove all parking on east side of street (39 spaces). Reconfigure parking on west side of street as shown (change from 43 to 37 spaces). : Use one signpost with two signs, one facing north and one facing south. Proposed 6' wide walk will be 8" thick, have expansion joints at a maximum of 40' apart, have score joints at a maximum of 6' apart, and provide positive drainage at slope of ¼ inch per foot. Existing s ew road edge ew lane lines (yellow) ew lane lines (white) ew s Project umber: 520 Drawing umber: 2/2 Description: Lincoln Avenue from Florida to St. Mary's

Remove all parking on east side of street 11.48 5.93 11.09 11.30 5.61 Install bumpout to aid with pedestrian visibility at crossing. Parking on west side of street to remain, as shown Remove all parking on east side of street Install bumpout to aid with pedestrian visibility at crossing. 6.00 11.99 10.52 6.02 8.85 5.91 12.01 5.95 MUTCD W11-1 MUTDC R1-1 Add crosswalk and bicycle crosswalk Parking on west side of street to remain, as shown. Project umber: 530 Drawing umber: 1/2 Description: Lincoln Avenue from St. Mary's to Hazelwood

otes: Design concept for Lincoln and St. Mary's intersection based on 2008 St. Mary's Road Corridor Study by the Champaign County Regional Planning Commission. Remove all parking on east side of street (44 spaces). Reconfigure parking on west side of street as shown (change from 38 to 44 spaces). : Use one signpost with two signs, one facing north and one facing south. MUTCD R1-1: Use 18" sign appropriate for shared-use path. Install bumpouts at pedestrian crossing near the Vet Med building and at Hazelwood drive intersection. Extend ramps to meet street. Concrete for bumpouts and six foot should be 8" thick, have expansion joints at a maximum of 40' apart, score joints at a maximum of 6' apart, and provide positive drainage at a slope of 1/4 inch per foot. Fill remainder of bumpout area with topsoil and seeded lawn. Provide positive drainage. Existing s ew road edge ew lane lines (yellow) ew lane lines (white) ew s Project umber: 530 Drawing umber: 2/2 Description: Lincoln Avenue from St. Mary's to Hazelwood