HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

Similar documents
PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Premium PowerPoint Presentation. Rigging Review

Slings Steel Chain, Wire Rope and Metal Mesh

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

Rigging Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-RIGGING 2014

References: EM Section 15 OSHA UFGS

Crane & Rigging Brain Teasers

Proof load is the load applied in performance of a proof test. Proof test is a nondestructive tension test performed by the sling manufacturer or an

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

National 400B. Certification CraneSafe Certification. CraneSafe + Fulford Harbour Group Tel:

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

SECTION 15 RIGGING. b. Defective rigging shall be removed from service.

Winchline n a box WINCH LINE SELECTION GUIDE. Wire Rope Winchlines are superior to most other winchlines found in the market place due to the

CORPORATE SAFETY MANUAL

Fall Protection Checklist. Guardrail System

8. Fall Protection Procedures WAC

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS PART 49. SLINGS

Warning CABLE REPLACEMENT INSTRUCTIONS. Questions? - Call Telpro Inc. Customer Service at or

Basic Rigging And Wire Rope

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

NEVER EXCEED WORKING LOAD LIMITS PAGE

Lift-All Wire Rope & Slings

Care and inspection of wire rope

Section 15 TABLE OF CONTENTS Rigging. 15.A General B Personnel Qualifications

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Suspension Ropes. Suspension Rope

Heavy Equipment Technician Rigging

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

SOP GEN-007X Crane and Winch Operations

WIRE ROPE AND SLING BASICS. Total. of Wires WIRE ROPE SLINGS. Use of EIP, IWRC rope gives 15% greater capacity than IP, IWRC ropes.

Care, Use and Inspection

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

SLINGS, HOISTING & RIGGING

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

GEMTOR. ... when your life is on the line OWNER'S MANUAL. FLW Series Self-Retracting Lanyard/Fall Limiter

Hoisting Equipment Cable puller & Accessories

Surface exploration drilling

Block & Tackle. Block & Tackle. Klein s line of block and tackle is engineered for high-strength requirements.

Care, Use & Maintenance of Wire Ropes on Cranes

operation WARNING! Operator must read and understand instructions here and on sling prior to use.

Sling Safety. Construction Safety and Health Outreach Program. U.S. Department of Labor OSHA Office of Training and Education May 1996 INTRODUCTION

For Review Only No Copying No Saving No Lending No Posting Online

British Columbia Carpenter Apprenticeship Program

FALL PROTECTION GUIDELINE

Hangt de baggerindustrie aan een (zijden) draadje

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

Risk Control at United Fire Group

MANITOWOC MODEL TON CAPACITY

TECH TIPS: ROPE DEFECTS

WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700

Occupational Protective Equipment

Crane Rental Heavy Machinery Moving Project Management

Roughneck TM Mesh Slings

INSTRUCTIONS FOR USE

WEB SLING BASICS AND HOW TO ORDER WEB SLINGS

This training session focuses on safe rigging for crane and derrick operations at construction sites. A critical job for the safety of any crane or

DLH online. Important factors in the selection of lifting slings

Session Objectives. Business & Legal Reports, Inc. 1011

Powerstrand Wire Rope

M S I C R A N E S C A L E

Crane Operator Practical Exam Examiner Observation Sheet

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

ISO INTERNATIONAL STANDARD. Cranes and lifting appliances Selection of wire ropes Part 1: General

You may order this publication from WCB Publications and Videos, Please quote ordering number BK60.

PSSI 6 Demarcation of Work Areas in Substations

USER S GUIDE LIFTING TERMINOLOGY

MoBiLe CrAnes. surelift. B y W i r e r o p e i n d u s t r i e s. tower CrAnes. port CrAnes

Once the job has been planned and the site has been inspected according to WHS and site requirements it is important to follow work procedure and

Ken Overton (Safety Engineering Services), CraneWorks Magazine (July-August 1994 Issue)

We live by the Life Saving Rules so that everyone goes home safe, every day.

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

PROCEDURES Power Lines

Progressive Safety Services LLC

OSHA s new walking working surfaces standards

Summary Report for Individual Task Perform field maintenance on lifting devices Status: Approved

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

Heavy Equipment & Rigging Specialist Training

Fall Protection- Part 2

Drawing Showing the Component Parts of a Standard Steel Wire Rope

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

Fall Protection STANDARD PROCEDURE INSTRUCTION. Fall Protection. Title SPI. Department. Supersedes SPI Dated. Jan 19, 2016.

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

User Instruction Manual For Davit Rescue System

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

Excavations and Trenches

GUIDELINES FOR USE GUARD

Worker s Safety Handbook for Rigger and Signalman

Fall Protection ABC s

Slings Natural Rope, Synthetic Rope and Synthetic Web

Fall Protection Introduction

Transcription:

HOW TO PREPARE FOR THE LEVEL A CRANESAFE ASSESSMENT Prepare for your assessment! Our website contains all the information you need for a successful assessment. Our goal is to find you competent on the assessment. We want you to be as prepared as possible for the assessment so that your chances of success are greatest. In our experience the part of the assessment people find most challenging is the load chart and rigging calculation exercises. Use these practise exercises to help you get ready for the assessment. www.fulford.ca/crane/cs_pex.html Learn more about the core skills & knowledge for all crane types as well as competency guides for each type of crane that give you more background on the competencies we are assessing against. www.fulford.ca/crane/crane_comp.html Please use this information to get yourself ready for a successful assessment. What does the Assessment Include The assessment has three main parts and is designed to allow you to demonstrate your skill and knowledge of safe craning. The assessment takes between 2 2½ hours (3 3½ hours for Lattice Friction Cranes). Results will be mailed to you within one week and, if found competent, you will receive your certificate. Part 1 Part 2 Part 3 Hand Signals Load Chart & Rigging Assess Yourself First On-Crane Practical Assessment A. Pre-Operational B. Crane Set Up & Hazard Assessment C. Crane Operation On-line Resources Go to our website for more details and practice exercises. What s Included in the Assessment www.fulford.ca/crane/crane_asst.html Load Chart & Rigging Practice Exercises www.fulford.ca/crane/cs_pex.html Core Skills & Knowledge www.fulford.ca/crane/crane_comp. html Log Book www.fulford.ca/resources/resourcessupplies.html Hand Signals www.fulford.ca/crane/cs_links.html Tower Crane Handbook www.fulford.ca/crane/cs_links.html Assessment Location & Fees www.fulford.ca/crane/ crane_assessdetails.html If you are unable to access our website, please call our office and we will make other arrangements for you. Employers If you are an employer, please ensure that your crane operators are aware of what the assessment involves and have had the opportunity to review the practice exercises prior to their assessment. CraneSafe + Fulford Certification Suite 508 602 West Hastings Street Vancouver BC V6B 1P2 Canada Toll free: 1.888.952.6033 Tel: 604.398.5230 Fax: 604.398.5236 info@fulford.ca www.fulford.ca 1 of 5

NOTES FOR THE CRANE OPERATOR Assessment appointments typically require a total of 2 to 2½ hours of operator and machine time (between 3 and 3½ hours for Lattice Friction Crane). Operators must complete the load chart and rigging calculations section and the on-crane practical section within the following time limits: Crane Type Times to Complete the Level A Assessment Load Chart & Rigging Calculations On-Crane Practical (With + Without Load) Lattice Friction 90 minutes 15 + 15 (total 30 mins) Hydraulic Friction 90 minutes 15 + 15 (total 30 mins) Mobile Hydraulic 60 minutes 15 + 15 (total 30 mins) Stiff Boom Truck 60 minutes 15 + 15 (total 30 mins) Folding Boom Truck 45 minutes 10 + 10 (total 20 mins) Tower n/a 10 minutes Self Erect Tower 45 minutes 20 minutes Crane & Site Requirements Please ensure that the crane being used for the assessment is out of storage and ready to be used when the Assessor arrives. Crane must possess valid certification The crane must have a valid inspection certificate. Failure to provide a valid certificate will result in the Assessor automatically terminating the Practical Portion of the Assessment. Additionally, if the assessor feels the crane is unsafe due to mechanical, electrical or hydraulic faults (which are not covered under Structural Certification inspection) the assessor will terminate the assessment. In either of these cases, the assessment fee will not be refunded and the cancellation policy applies. Crane must be equipped with a log book Occupational Health and Safety Regulations require all cranes to be equipped with an equipment log book. A sample log book is posted on our website: www.fulford.ca/crane/cs_logbook.doc. Load for assessment required on site The Assessor will require a Load to be used with an approximate weight of 300 to 500 pounds, ideally with an engineered lift point (e.g. on a lock block, a cast in lifting bar versus a wire rope stranded loop). Location for the load chart and rigging calculations This portion of the assessment requires a room where the operator can sit undisturbed to work through load chart and rigging calculation exercises. A lunch room or equivalent is fine so long as the operator will not be disturbed there; otherwise an office is a better choice. We provide all materials necessary for this portion of the assessment. Location of on-crane assessment The location for the on-crane assessment must be free of obstructions and should allow the crane to extend at least 75% of its maximum boom length in the case of hydraulic powered booms. Lattice Booms must have a minimum of 100 feet of boom rigged. Mobile Hydraulic Cranes and Boom Trucks must use a minimum of ¾ of the powered sections of the main boom. Operator Requirements & Hand-Outs To ensure the best chance of successfully completing the CraneSafe Level A assessment, crane operators need to be aware of what will take place during their assessment. In particular, it is important to note that one section of the assessment is comprised of written calculations using load charts and rigging tables supplied by the assessor. Practice Load Chart and Rigging Exercises are available on our website: www.fulford.ca/crane/cs_pex.html. It is strongly recommended operators complete these practice exercises successfully in advance of the assessment. Prior to assessment, all operators should read these documents: How to Prepare for the CraneSafe Certification Assessment WorkSafe Regulations: Wire Rope, Rigging and Attachments Operators should bring this document with them to their assessment to use as a reference. Sample Target Layouts for the On-Crane Practical portion of the assessment which must be completed with and without load. Cancellation Policy Cancellation Fees Over 30 days: $100.00 10-30 days: $275.00 2-9 days: $500.00 48 hours or less: $875.00 Rescheduling Fees Over 30 days: n/a 10-30 days: $200.00 2-9 days: $425.00 48 hours or less: $875.00 2 of 5

WORKSAFE REGULATIONS WIRE ROPE, RIGGING & ATTACHMENTS Hoist Lines 15.25 Wire Rope Rejection Criteria Wire rope must be permanently removed from service if (a) in running wire ropes, there are 6 or more randomly distributed wires broken in one rope lay or 3 or more wires are broken in one strand in one lay, (b) in stationary wire ropes, such as guylines, there are 3 or more broken wires in one lay in sections between end connections, or more than one broken wire within one lay of an end connection, (c) wear, or the effects of corrosion, exceed ⅓ of the original diameter of outside individual wires, (d) there is evidence of kinking,bird-caging or any other damage resulting in distortion of the rope structure, (e) there is evidence of heat or arc damage, or (f) there are reductions of normal rope diameter, from any cause, in excess of (i) 0.4 mm (⅟₆₄ in) for diameters up to and including 8 mm (⁵/₁₆ in), (ii) 1 mm (³/₆₄ in) for diameters greater than 8 mm (⁵/₁₆ in) up to and including 19 mm (¾ in), (iii) 2 mm (⅟₁₆ in) for diameters greater than 19 mm (¾ in) up to and including 29 mm (1⅛ in), or (iv) 3 mm (³/₃₂ in) for diameters greater than 29 mm (1⅛ in). 15.26 Non-Rotating Wire Rope Wire rope with non-rotating construction must be removed from service if (a) the rejection criteria in section 15.25 are met, (b) there are 2 randomly distributed broken wires in 6 rope diameters, or (c) there are 4 randomly distributed broken wires in 30 rope diameters. (b) in stationary wire ropes, such as guylines, there are 3 or more broken wires in one lay in sections between end connections, or more than one broken wire within one lay of an end connection, (d) there is evidence of kinking, bird-caging or any other damage resulting in distortion of the rope structure, 15.15 Wraps Required At least 2 full wraps of rope must remain on winding drums when the load hook is in the lowest position. 15.7 Wire Rope on Mobile Cranes The minimum design factor based on breaking strength for wire rope on a mobile crane, unless otherwise specified by the crane or wire rope manufacturer, is (a) for conventional wire rope (i) 2.5 for pendant lines, 3 for boom hoist reeving and 3.5 for load lines, during erection, and (ii) 3 for pendant lines, 3.5 for boom hoist reeving and 3.5 for load lines, at all times except during erection, and (b) 5 for wire rope of non-rotating construction. Blocks, Overhaul Balls, Hooks & Sheaves 15.17 Sheaves A sheave must (a) be correctly sized for the rope, (b) have a device to retain the rope within the groove, and (c) be removed from service if it has a damaged groove or flange. 15.10 Open Hook Restriction (1) A hook must have a safety latch or other means that will retain slings, chains, or other similar parts, under slack conditions. (2) A hook used in an application where manipulation of a safety latch or other retaining means may cause a hazard to a worker or where there is no hazard to a worker if the load becomes dislodged is exempt from the requirements of subsection (1). 15.29 Hook Rejection Criteria A worn or damaged hook must be permanently removed from service if: (a) the throat opening, measured at the narrowest point, has increased by more than 15% of the original opening, (b) the hook has twisted more than 10 from the original plane of the hook, (c) the hook has lost 10% or more of its cross-sectional area, (d) the hook is cracked or otherwise defective, or (e) wear or damage exceeds any criteria specified by the manufacturer. Rigging Design Factors Table 15-1: Minimum design factors for rigging Component Min. Design Factor Nylon fibre rope sling 5 Polyester rope sling 5 Polypropylene rope sling 5 Alloy steel chain sling 4 Wire rope sling 5 Metal mesh sling 5 Synthetic web sling 5 Synthetic roundsling 5 Chain fittings 4 Wire rope sling fittings 5 Other fittings as specified by manufacturer Non-rotating wire rope as specified by manufacturer but not less than 5 Conventional wire rope 5 3 of 5

WORKSAFE BC + BC HYDRO HIGH VOLTAGE EQUIPMENT 3 Keys of Electrical Safety Look Up & Down Plan your work to prevent electrical contact and call for assistance Identify overhead and underground power lines Keep Back Know Your Limits On foot, stay at least 10 metres (33 feet) away from equipment operating around power lines. Use a spotter to make sure you keep equipment back at least 6 metres (20 feet) from power lines Stay Back & Call for Help Stay back 10 metres (33 feet) from a fallen power line, exposed underground power line or any object in contact with a line. If your equipment contacts a line, stay put until help arrives. If it s a life threatening situation, jump clear of your vehicle, feet together, and shuffle away keeping both feet close together. Never contact the ground and your vehicle at the same time. Call for Help. Do not attempt a rescue until directed by BC Hydro personnel. How Electricity Behaves Ripple Effect If anything makes contact with a high voltage power line, such as a tree or an uninsulated boom on a truck, or if a broken power line falls to the ground or lands on a vehicle, electricity will flow to the ground and spread out in concentric circles like the ripples in a pool of water. Voltage is very high at the point where electricity makes contact with the ground. The level of intensity decreases as the distance increases from the point of contact. Zero voltage is approximately 10 metres (33 feet) from the point of contact. Step Potential Due to the difference in voltage as one moves towards or away from the source of electricity, it is possible to step between high and low voltage differences. As the human body is usually a better conductor of electricity than the ground, the electricity can flow between the feet through the body with sometimes devastating results. This is referred to as step potential. Touch potential Trees can be very conductive. If a tree comes into contact with a high voltage power line and a person is touching the tree or touching a ladder leaning against the tree, there will be a high to low voltage difference between the person and the ground. This will force electrical current to flow through them to the ground and may easily result in serious injury or worse. This is referred to as touch potential. What to Do in Case of Electrical Contact Is there an immediate threat to life or a fire? If YES, call 911. They will contact BC Hydro to shut off the power. If NO, call 1 888 POWERON (769 3766 or *49376) to have BC Hydro shut off the power. Shuffle or Hop Don t Step If the ground becomes energized while you work, avoid shock by keeping your feet close together and shuffle away never allowing the heel of one foot to move beyond the toe of the other. If you cannot shuffle approximately 10 metres (33 feet) away from the energized area, put your feet together and hop, but never walk. Limits of Approach Planning to work near energized highvoltage equipment and conductors? Where work is to be conducted in the vicinity of energized high-voltage electrical conductors, WorkSafe BC regulations specify the safe limits of approach that must be maintained by any worker, work, tool, machine, equipment or material. VOLTAGE Phase to Phase MINIMUM DISTANCE Metres Over 750 V to 75 kv 3 Over 75 kv to 250 kv 4.5 Over 250 kv to 550 kv 6 Plan Before You Start You must notify BC Hydro if your work or equipment, or any inadvertent movement of persons or equipment located outside the limits of approach, could possibly result in encroachment of the limits of approach. BC Hydro will work with you to determine what steps are required to protect you, your workers and the BC Hydro distribution system. If necessary, we will also help you complete WorkSafe BC s 30M33 form. For more information, contact BC Hydro s Electric Service Coordination Centre at 1 877 520 1355. WorkSafeBC 30M33 Form: Assurance in Writing Form 30M33 is provided to and used by all power system owners in B.C. It is currently the only assurance in writing form that is acceptable to WorkSafeBC. This form must be completed prior to commencement of work near energized overhead powerlines.

ON-CRANE PRACTICAL ASSESSMENT SAMPLE TARGET LAYOUTS Front Mobile Cranes Truck Bed Cab Folding Boom Trucks Truck Bed Cab Stiff Boom Trucks Not to scale 4 of 5

ON-CRANE PRACTICAL ASSESSMENT SAMPLE TARGET LAYOUT TOWER CRANE Block Scale: Start & End Target NTS Tower Cranes Note: The assessor will modify the target course or evaluate production lifts if site conditions require it. Self Erect Tower Crane 5 of 5