Maryland State Highway Mobility Report. Morteza Tadayon

Similar documents
National Capital Region Congestion Report

National Capital Region Congestion Report

CONGESTION REPORT 4 th Quarter 2017

Using GPS Data for Arterial Mobility Performance Measures

CONGESTION REPORT 3 rd Quarter 2017

CONGESTION REPORT 4 th Quarter 2016

CONGESTION REPORT 2 nd Quarter 2017

Preliminary Transportation Analysis

Congestion Management Report

Basalt Creek Transportation Refinement Plan Recommendations

CONGESTED LOS ANGELES

Highway 217 Corridor Study. Phase I Overview Report

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

2015 Urban Mobility Scorecard. Scott Weber, Transportation Planner & Analyst James Winters, Regional Planner & Policy Analyst

Performance Criteria for 2035 Long Range Transportation Plan

Washington DC Section of ITE Project Briefing

92% COMMUTING IN THE METRO. Congested Roadways Mode Share. Roadway Congestion & Mode Share

Concurrent Monitoring, Analysis, and Visualization of Freeway and Arterial Performance for Recurring and Non-recurring Congestion

North Coast Corridor:

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Typical Rush Hour Commute. PennyforTransportation.com

MULTIMODAL NEEDS ASSESSMENT

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Route 7 Corridor Study

2009 URBAN MOBILITY REPORT: Six Congestion Reduction Strategies and Their. Effects on Mobility

Performance Measure Summary - San Jose CA. Performance Measures and Definition of Terms

Performance Measure Summary - Chicago IL-IN. Performance Measures and Definition of Terms

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute

Performance Measure Summary - Denver-Aurora CO. Performance Measures and Definition of Terms

Santa Clara I-280 CORRIDOR STUDY

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Defining Purpose and Need

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

Regional Transportation Needs Within Southeastern Wisconsin

VPP Suite User Group. January 20, Dial & enter # at the prompt

Chapter 4 Traffic Analysis

100 Most Congested Roadways in Texas

Governor s Transportation Vision Panel

Terwillegar Drive Expressway Draft Concept Plan

Transportation Master Plan Advisory Task Force

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

appendix b BLOS: Bicycle Level of Service B.1 Background B.2 Bicycle Level of Service Model Winston-Salem Urban Area

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Freeway Performance Report 2015, 3 rd Quarter. Photo courtesy of

Improving Mobility Without Building More Lanes

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Congestion Management Report

100 Most Congested Roadways in Texas

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

North Shore Transportation Improvement Strategy

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Mobility and Congestion

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Freeway Improvement Project

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department

What is the Congestion Management Process? What is Congestion? Growth in the Treasure Valley Development and Congestion

Appendix SEA Seattle, Washington 2003 Annual Report on Freeway Mobility and Reliability

5.0 Roadway System Plan

Managed Lanes: A National Perspective Managed Lane Strategies

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

We believe the following comments and suggestions can help the department meet those goals.

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

US 69 RELIEF ROUTE STUDY

WHAT IFS: Over the course of

Traffic Congestion in Houston. Presented by Bill King

THE 2007 URBAN MOBILITY REPORT

Route 29 Solutions Projects

Operational Comparison of Transit Signal Priority Strategies

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

The Region s Most Expensive Commutes:

FMATS Transportation Improvement Program Project Nomination Form

Public Opinion about Transportation Issues in Northern Virginia

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Route 29 Corridor Assessment Update. Development of Possible Solutions

Kentucky s Surface Transportation System

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

What if YOU could help plan Northern Virginia s transportation future?

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

I-105 Corridor Sustainability Study (CSS)

Purpose and Need Report. Appendix B. Purpose and Need Report

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Multimodal Analysis in the 2010 Highway Capacity Manual

Executive Summary June 2015

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

Appendix T 1: Additional Supporting Data

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Transcription:

Maryland State Highway Mobility Report Morteza Tadayon

Background Mobility is a Key Performance Area (KPA) in the SHA Business Plan SHA adopts a performance based approach Monitors Highway System to identify gaps, needs and opportunities Inform/ Drive Investment Related Decisions 2012 Mobility Report summarizes the highway system performance and SHA s efforts for 2011

Key Areas Mobility and Reliability Incident Management And Traveler Information Systems Multi-Modalism/ Smart Growth Freight

Stakeholders/ Contributors Stakeholders/ Contributors Maryland State Highway Administration MD Transportation Authority MD Department of Transportation and other Modals MWCOG and BMC MPOs UMD CATT Maryland SHA Offices and Divisions Office of CHART Office of Planning and Preliminary Engineering Office of Highway Development Office of Traffic and Safety Office of Policy and Research UMD CATT and JMT assisted the SHA Travel Forecasting Division to develop the report.

Key Datasets and Applications DATASETS INRIX Vehicle Probe Data on freeways/ expressways SHA Traffic Count Data SHA Signal System Data SHA Construction Project Information APPLICATIONS UMD CATT Lab Vehicle Probe Project (VPP) Suite SHA Traffic Monitoring System Application (I-TMS) Traffic Simulation Models and Other GIS Applications

AND

Vehicle Miles of Travel (VMT) In 2011, drivers in Maryland traveled 56.0 billion vehicle miles VMT in 2011 is about 1% less than the all time high of nearly 57 billion VMT in 2007

Congestion Costs for MD Freeways/ Expressways The total estimated statewide cost of congestion on the freeway/ expressway network in 2011 was $1.49 Billion. Cost Breakdown: Auto delay cost: $1,193 M Truck delay cost: $ 259 M Wasted fuel cost: $ 129 M Percent of Total Statewide Congestion Cost by Region (Total Congestion Cost = $1.49B) Baltimore Region Washington Region 3% 3% 34% Percent of Total Statewide Congestion Cost by Source 9% 11% Eastern Shore Western Maryland 60% Travel Delay Truck Delay 80% Wasted Fuel

Definitions of Congestion and Reliability Travel Time Index (TTI) : (Average Travel Time/ Free flow Travel Time) = Uncongested (TTI<1.15) = Light (1.15<TTI<1.3) = Moderate (1.3<TTI<2.0) = Severe (TTI>2.0) Planning Time Index (TTI) : (Worst Case Travel Time/ Free flow Travel Time) = Reliable (PTI>1.5) = Moderately Reliable (1.5<PTI<2.5) = Unreliable (PTI>2.5)

2011 Congestion on Freeways/ Expressways PM Peak Hour % System Congested Statewide: 13% Baltimore-Washington Region: 20% % VMT in Congested Conditions: Statewide: 26% Baltimore-Washington Region: 29%

2011 Reliability Map Freeways/ Expressways % System Unreliable : 11% % VMT in Unreliable Conditions: 26%

Bottlenecks (Top 30) REGIONALLY SIGNIFICANT CORRIDORS All Interstates US 50 Maryland 295 US 29

Recurring Congestion Projects (2011) Major Projects Inter County Connector (ICC) opened in late 2011 Carries about 25-30K vehicles on an average weekday Diverted traffic from parallel roadways Significant savings in travel times MD 237 from MD 235 to Pegg Road MDTA reconstruction of I-95/ MD 24 and new interchange at MD 24/ MD 924 Minor Congestion Relief Projects Signal System Optimization Projects 48 traffic signal systems involving 298 signals retimed - $21 million dollars in user cost savings Transit Signal Prioritization Projects

AND

Incident Management and Traveler Information Systems Responded to and cleared more than 17,000 incidents and assisted more than 24,000 stranded motorists in 2011 Delay Reduction of 41.7 million vehicle-hours yielding annual user cost savings of $1.1 Billion. 511 System

AND

Multi-Modalism and Smart Growth Transit Improvements Major Projects - CCT, Red Line, Purple Line TSP/ Queue Jump TIGER Grant Projects Transit Oriented Developments Complete Streets Bicycle and Pedestrian Accommodations Bicycle and Pedestrian Priority Areas Bicycle Library/ Master Plan Update SHA has budgeted $70 Million for Bike/ Pedestrian improvements

Multi-Modalism and Smart Growth HIGH OCCUPANCY VEHICLE (HOV) LANES On I-270: HOV lanes carry 3,100 people per lane compared to 1,900 people per general use lane. On US 50: HOV lanes carry 1,600 people per lane compared to 1,500 people per general use lane. PARK AND RIDE LOTS SHA and MDTA operate lots in 20 of Maryland s 23 Counties Total 12,510 spaces with average 60% occupancy on any given day

Freight National Ranking Location Description Peak Average Speed Non-Peak Average Speed Non-Peak/ Peak Ratio 51 I-95 at I-495 (North), Washington, DC 38 53 1.41 56 I-495 at I-270 (East) 31 51 1.63 78 I-95 at I-695 (South), Baltimore 48 54 1.13 91 I-95 at I-395, Baltimore 48 52 1.08 100 I-95 at I-695 (North), Baltimore 47 55 1.15

USE OF MOBILITY PERFORMANCE MEASUREMENT FOR PROJECT PLANNING AND DECISION-MAKING I-695 SHORT TERM IMPROVEMENT STUDY

I-695 Corridor Fact Sheet Source: 2012 MD Mobility Report

I-695 Corridor Fact Sheet Source: 2012 MD Mobility Report

I-695 Study Approach Used Peak Period INRIX Congestion Data -TRAVEL TIME/ PLANNING TIME INDEX MAPS -SKYCOMP MAPS Identified Congestion Hotspots And Sources - RECURRING CONGESTION - CHART INCIDENTS/ CRASH DATA - WORK ZONES Developed Traffic Simulation Models Evaluated Low Cost Short Term Improvements (< $20 Million) analyzed in a Benefit/ Cost Context

I-695 Study Example Project Name: I-695, Baltimore Beltway Location of Project: I-695 Outer Loop: MD 144 (Edmonson Avenue) on ramp continuing to MD 372 (Wilkens Avenue) Description: Provide additional through lane from on ramp at Edmonson Avenue to end of acceleration lane from Edmonson Avenue. Project includes widening and restriping of I-695 Outer Loop and removal and placement of retaining wall. Total project length is 2,500 feet. Total User Cost Savings over 10 Years: Auto Delay Cost Savings $ ('000) Truck Total Auto/Truck Fuel Cost Savings $ ('000) Reliability Savings $ ('000) Safety Savings $ ('000) Total Savings 11,427 2,722 14,149 1,415 10,612 989 Approx. $27.2 Million Total Cost: $ 18.2 Million (in 2011 Dollars) Project Ranking: 10 out of 16

I-695 Study Example (Continued)

Next Steps Identify sources of congestion and relief solutions for top bottlenecks Improve reliability of system by focusing on most unreliable segments (ITS, Emergency Vehicle deployment etc.) Conduct Before/ After Studies to evaluate the impact of completed projects Use the Mobility Report as a performance monitoring mechanism to guide decisionmaking Coordination with MPOs, locals and other agencies

Questions? Morteza Tadayon Maryland State Highway Administration Office of Planning and Preliminary Engineering 707 North Calvert Street, Suite C-503 Baltimore, Maryland 21202-3601 mtadayon@sha.state.md.us