GOOD AFTERNOON, AND THANK-YOU FOR VISITING US AT D2! I AM LAURA HANSON BIKE/PED COORDINATOR HERE AT THE DISTRICT, AND I AM IN THE PROJECT DEVELOPMENT

Similar documents
Non-Motorized Overpass at SR 5/US1

Stakeholders Advisory Working Groups (SAWGs) Bridge and Bike / Pedestrian SAWG (#15)

Hennepin County Bicycle and Pedestrian Planning

Hampton Roads Pedestrian and Bicycle Advisory Committee

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships

DRAFT SHARED USE PATH AND ROADWAY INTERSECTIONS IN THE PIONEER VALLEY DECEMBER Prepared under the direction of the Pioneer.

Living Streets Policy

N E W P O R T L A N D Y O R K C I T Y. t o

Clay Street Bridge Replacement Project

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

Austin Avenue Bridges Project. Public Meeting Summary

Hampton Roads Pedestrian and Bicycle Advisory Committee

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Methuen Rail Trail City of Methuen Public Information Meeting Methuen City Hall

FY 2006 TRANSPORTATION CAPITAL PROGRAM

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Bicycle-Pedestrian Master Plan Update

CHAPTER 1 INTRODUCTION

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

Public Transportation and Bicycle & Pedestrian Stakeholder Webinar. April 11, :30 PM

FALL 2014 WORKSHOPS TAKEAWAYS

Getting Your SRTS Project Funded. Ryan Snyder

TRANSPORTATION TRAINING TOPICS. April 6, 2010

City of Springboro Bicycle & Pedestrian Plan

Walnut Street Extension Streetscape Improvement Project Funding Authorization Analysis Report

Rail Station Fact Sheet Downtown Carrollton Station

Ulster County Non-motorized Transportation Plan

Traffic Signs and Signals

Outreach Sessions for the Transportation Plan Update. April 29, May 13, and May 20

Welcome to the Sellwood Bridge Project Open House!

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Access Routes from US 101 to the Richmond San Rafael Bridge

1.0 EXECUTIVE SUMMARY

Florida DOT Case Study

Emergency Response Support Signage on Multi-Use Trails Plan

Our vision for Chicago s bike network focuses on three types of routes:

Statewide Pedestrian and Bicycle Transportation Plan and Economic Impact Study. Kick off Meeting November 28, Your Planning Team

S A F E R O U T E S T O S C H O O L H E R M A N TOW N S C H O O L S A N D P R O C TO R S C H O O L S P L A N A P P R OVA L S

Perryville TOD and Greenway Plan

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Appendix C 3. Bicycle / Pedestrian Planning

LANCASTER CITY BICYCLE NETWORK

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

COMPLETE STREETS DURING CONSTRUCTION

Oakland Bicycle and Pedestrian Advisory Committee, September 19, 2013 Meeting

Bicycle and Pedestrian Connectivity Study Phase 2

Congestion Management Process

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

MASTER BICYCLE AND PEDESTRIAN PLAN

Agenda Item # Page # RECOMMENDATION

Master Plan Joint Workgroup Meeting. Meeting Summary. Date: Sunday, November 5, :00pm 8:00pm Location: Ended at The Big Field at Dix Park

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee

Bicycling Routes on Provincial Roads Policy

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

City of Madison: 2017 Capital Budget Capital Improvement Plan

Traffic Engineering Update on Bike/Ped Topics. Marc Lipschultz, P.E. PTOE Central Office Traffic Engineering Division

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

BIKE PLAN CONTENTS GATEWAY

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Route 47 (North Main Street) Reconstruction

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Trail Running Western Massachusetts By Ben Kimball

Cycle Track Design Best Practices Cycle Track Sections

Pennsylvania Avenue (CR 484) Design Alternatives Study

City of McHenry Bicycle and Pathway System Plan

Rail Station Fact Sheet University of Dallas Station

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

Physical Implications of Complete Streets Policies

Golden s Plan. For the Highway 6 & 93 Corridor

Bicycle Master Plan Goals, Strategies, and Policies

Implementation Report # False Creek Bridges

2009 Franklin County Bikeway Plan Update

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019

ACTIVE TRANSPORTATION

City of Davis East Covell Corridor Plan

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

May 13, pm Government Center Public Meeting Room City of Waltham Planning Department

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

SECTION TRAFFIC REGULATIONS

State Bicycle and Pedestrian Advisory Committee Meeting. March 27, 2013 John Bolecek Statewide Bicycle and Pedestrian Planner

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Favorable factors for bicycling and walking investments & plan implemtation. Road Map for Success

Broad Street Bicycle Boulevard City Council Study Session Summary

Transcription:

GOOD AFTERNOON, AND THANK-YOU FOR VISITING US AT D2! I AM LAURA HANSON BIKE/PED COORDINATOR HERE AT THE DISTRICT, AND I AM IN THE PROJECT DEVELOPMENT SECTION. 1

HERE IS MA SHOWING THE SIX DISTRICTS AND 10 PARK PLAZA (HQ IN BOSTON). HERE IS D2 WE WORK WITH 4 PLANNING AGENCIES SERVING 56 CITIES & TOWNS: FRCOG MRPC CMRPC AND PVPC AND WE ARE LOCATED AT THIS STAR RIGHT NOW IN NORTHAMPTON. TODAY, I JUST WANT TO HIGHLIGHT SOME OF THE PROJECTS IN D2 TO SHOW THEIR DIVERSITY, AND SHARE SOME OF THE ACCOMMODATIONS BEING CONSTRUCTED FOR BICYCLISTS AND PEDESTRIANS. 2

WITH CONSIDERATION TO TIME -I HAVE DIVIDED D2 INTO A NORTHERN SECTION & SOUTHERN SECTION FOR THIS PRESENTATION. THE NORTHERN SECTION OF D2 INCLUDES COMMUNITIES IN FRANKLIN COUNTY AND IN MRPC. IT MIGHT DIFFICULT FOR YOU TO SEE FROM THE DISTANCE, BUT THIS MAP HIGHLIGHTS SOME DIFFERENT BICYCLE TRAILS: FOR EXAMPLE: BLUE LINES SHOW AN EXISTING FACILITY SUCH AS THE FRANKLIN COUNTY BIKEWAY -CT RIVER ROUTE JOINS THE CANALSIDE TRAIL THAT IS PART OF THE GREENFIELD- MONTAGUE LOOP -THERE IS THE LEVERETT-MONTAGUE ROUTE THAT JOINS THE NORTHFIELD CONNECTOR AND THE NORTH CENTRAL PATHWAY IS A SHARED USE PATH IN WINCHENDON. THE RED LINES REPRESENT ENVISIONED PATHS SUCH AS ON-ROAD FACILITIES. THESE YELLOW LINES ARE CURRENTLY UNDER REVIEW, SUCH AS A SHARED USE PATH FOR THE MILLERS RIVER GREENWAY IN ORANGE, AND THE WARE RIVER RAIL TRAIL IN TEMPLETON. NOW, I WILL TAKE YOU ON A QUICK TOUR OF 5 PROJECTS IN THE NORTHERN AREA: -3 ARE LOCATED FAIRLY CLOSE EACH OTHER IN MONTAGUE (WHICH HAVE BEEN COMPLETED), -AND 2 ARE PLANNED AS FUTURE PROJECTS -1 IN NORTHFIELD & 1 IN GREENFIELD. 3

4

INCLUDED IN A LARGER PROJECT FOR HACHERY ROAD & GREENFIELD ROAD IMPROVEMENTS. PICTURES INCLUDE CONCRETE DECK POUR (4/28/17), POLYSTYRENE APPROACHES (BEGINNING OF MAY 2017): UNIQUE SITUATION IN THIS AREA DUE TO HIGH WATER TABLE & ARTESIAN CONDITIONS WHERE WATER IS IN A CONFINED AQUIFER CONTAINING GW UNDER PRESSURE THAT FLOWS OUT TO THE SURFACE. THIS CONDITION WREAKED HAVOC AT THIS SITE, AND CAUSED THE BRIDGE TO BE SHUT DOWN ABOUT 10 YEARS AGO WHEN IT WAS DISCOVERED THAT THE RAILINGS GOT SEPARATED, SO THE BRIDGE WAS REMOVED TO PROTECT THE RR UNDERNEATH. THE POLYSTYRENE APPROACHES ARE LIGHTER THAN THE USUAL PAVEMENT APPROACHES, AND THIS NEW INNOVATION WILL CAUSE LESS PRESSURE ON THE WATER TO RISE, THEREBY MAKING IT LASTING LONGER. THIS RECENTLY COMPLETED BICYCLE/PEDESTRIAN BRIDGE WAS OPENED FOR PUBLIC USE ON 7/1/2017, AND SHOULD HAVE RIBBON-CUTTING CEREMONY THIS FALL. 5

LOCATED IN NORTHERN MA OVER CT RIVER (CLOSE TO NH & VT BORDERS) Historic Steel Truss CANTILEVER (ARCHED) BRIDGE (Donated in 1904 Francis Robert Schell in memory of his parents Closed in 1985 due to structural integrity STRUCTURE LENGTH = 515 FT/ HAS 3 SPANS BUT MAIN SPAN BETWEEN PIERS = 352 FT/ WIDTH = 19 FT WSP (MassDOT CONSULTANT GAVE A PI MEETING ON 6/1/2017 WHERE THEY SHARED 8 CONCEPTS OF LONG SPAN PED BRIDGE TYPES & SHARED ADV/DISADV TO GAIN FEEDBACK. NEED 352 FT FOR THE SPAN, WHICH POSES DIFFICULTY FOR CURRENT PIER AND ABUTMENT LAYOUT IF INTERESTED IN FEEDBACK SEE ME AFTER MEETING 6

7

THE SOUTHERN SECTION OF D2 INCLUDES COMMUNITIES IN PIONEER VALLEY & CMRPC. REMEMBER RED LINES INDICATE ENVISIONED FACILITIES, AND THE BLUE LINES INDICATE EXISTING FACILITIES SUCH AS THE MANHAN RAIL TRAIL IN EASTHAMPTON THAT CONNECTS TO THE MASS CENTRAL BIKEWAY IN NORTHAMPTON, AND CONTINUES TO HADLEY ON THE NORWOTTUCK RAIL TRAIL. THE YELLOW LINES SHOW FUTURE AREAS UNDER REVIEW SUCH AS THE CT RIVERWALK IN WEST SPRINGFIELD. SO LET S TAKE A QUICK TOUR, AND I WILL SHOW YOU SOME INTERESTING PROJECTS FOR: - 2 RECENTLY COMPLETED PROJECTS IN BARRE & NORTHAMPTON, - 2 PROJECTS IN THE NEAR FUTURE IN SPRINGFIELD AND AGAWAM/W. SPRINGFIELD, -A CURRENT SRTS PROJECT IN SOUTHAMPTON & FINALLY, AN UPCOMING PROJECT IN WESTFIELD. 8

9

10

11

NOTE: THE GREEN WILL NOT BE HERE ON THE BRIDGE. 12

Bid Price -$1M Construction Began 3/27/2017 13

14

THE RIVER ROLL & STROLL EVENT WAS THE FIRST OF ITS KIND IN MA. IT INVOLVED CLOSING THE BRIDGE THAT CARRIES RT 116 OVER THE CT RIVER IN ORDER TO PROMOTE WALKING, BIKING, & USING ALTERNATIVE MODES OF TRANSPORTATION! DURING THE CLOSURE, SIGNS & JERSEY BARRIERS WERE ERECTED FOR A TRAFFIC DETOUR OVER THE ROUTE 202 BRIDGE, SO YOU CAN SEE THIS TOOK A LOT OF COORDINATION. ARE ANY OF YOU AWARE OF THIS EVENT OR DID YOU ATTEND (RAISE YOUR HAND)? -HOLYOKE & SOUTH HADLEY COORDINATED THE FUND RAISING, AND PUBLIC OUTREACH FOR (ABOUT 75) VOLUNTEERS FROM BOTH COMMUNITIES. D2 WORKED WITH THEM FOR A PERMIT TO CLOSE THE BRIDGE TO TRAFFIC FOR 4 HOURS (11AM-3PM) ON A SUNDAY. AS YOU CAN IMAGINE, THERE HAD TO BE A LOT OF COORDINATION ESPECIALLY INVOLVING THEIR POLICE & PUBLIC WORKS DEPARTMENTS, - AND THE EMERGENCY RESPONSE PERSONNEL FOR SAFETY COORDINATION, - A MILITARY GUARD FIRE THEIR MUSKETS 3X, - THERE WAS A VIETNAM VETERAN MEMORIAL BRIDGE NAMING CEREMONY (COMPLETE W/ A BALD EAGLE FLY OVER-I DON T KNOW HOW THEY DID THAT!) - THERE WERE MANY TYPES OF MUSIC AT THE EVENT INCLUDING THE SOUTH HADLEY MIDDLE SCHOOL BAND. 15

THERE WERE ALL KINDS OF FUN ACTIVITIES TO DO INVOLVING: - DANCING/ LIVE MUSIC BY A VARIETY OF BANDS INCLUDING A DANCING SEA LAMPHREY, - MASSDOT INSTALLED A TEMPORARY SEPARATED BIKE LANE, AND HAD A TABLE TO DISTRIBUTE FREE GIFTS/INFORMATION, - GAVE THE PUBLIC AN OPPORTUNITY TO TAKE A BIKE SURVEY REGARDING SAFETY MEASURES, AND LOCATIONS FOR FUTURE FACILITIES, - AND THERE WAS HOLA-HOOPING, BUBBLE-MAKING, BIKE DECORATING, CHALK DRAWING, FACE-PAINTING, AND OF COURSE - ENJOYING THE VIEW OF THE HOLYOKE DAM FROM THE BRIDGE WHERE YOU COULD EXPERIENCE THE CT RIVER IN A WHOLE NEW WAY. 16