Pump Performance Testing

Similar documents
Cover Page for Lab Report Group Portion. Pump Performance

Cover Page for Lab Report Group Portion. Head Losses in Pipes

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump.

Exercise 4-2. Centrifugal Pumps EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Pumps

Cover Page for Lab Report Group Portion. Drag on Spheres

Cover Page for Lab Report Group Portion. Lift on a Wing

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Installation, Operating, Maintenance and Safety Instructions for. Pressurised water systems for boats

Ammonia Treatment Instructions Page 1 of 5

icon i150 / i350 Installation / Operation Manual

Cover Page for Lab Report Group Portion. Boundary Layer Measurements

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Read Before Operating!

Lab #4 Pipe Flow, Minor and Major Losses, and Walking in Osborne Reynolds Shoes CEE 331 Fall 2006

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

Chapter 10: Bidirectional Flow Controls

INSTALLATION AND OPERATION INSTRUCTIONS

The Discussion of this exercise covers the following points:

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Installation Instructions

Macro-Infusion Guide

INSTALLATION AND OPERATION INSTRUCTIONS

Operator: Save these instructions for future use!

Operating Instructions Model and Hydrostatic Test Pump

General Training Pty Ltd

GM Series Dual-Block Multi-Function Gas Control Valves

Operating Instructions

Instructions for Use

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range

1.2 Example 1: A simple hydraulic system

Teacher s Assistant Laboratory Guide

LAB 7. ROTATION. 7.1 Problem. 7.2 Equipment. 7.3 Activities

Installation Instructions

Douglas Call 4/11/2008 1/5. Ammonia Treatment

Service Installation: 48 V Power Supply September 27, 2018 SI Written by BTA

Operator: Save these instructions for future use!

icreasepro Creaser Operators Manual

Installation Operation Maintenance

6900 Maintenance Instruction System Flush

Refiner Trial Working Manual Rev 3 updated July 26, 2012 by Nici Darychuk

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out

Read Before Operating!

INSTALLATION INSTRUCTIONS Non-Pressurized Tank. Non-Pressurized Tank Part Number: AFCG1PT

Instruction and Practice Manual

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

VERTICAL AIR COMPRESSORS

Installation of Your SprayMaster System

Evaluation copy. Interdependence of Plants and Animals. computer OBJECTIVES MATERIALS

STAINLESS STEEL GRAND SERIES

PDF-A Magnetic drive pumps. MD series

Rules for ME 491 Design Competition Fall 2017

KEY CONCEPTS AND PROCESS SKILLS. 1. Creating models is one way to understand and communicate scientific information.

HYDRAULICS. H89.8D - Hydraulic Bench

Installation, Operating, Maintenance and Safety Instructions for MAXI-SYSTEM Pressurised water systems for boats

Oxygen Dialflow Meter. Instructions for Use

HOW TO DO STUFF: CHAPTER I WATER WELLS CHECKING GRAVEL PACKING DISINFECTING WATER WELLS

TUTORIAL. NPSHA for those who hate that stuffy word. by Jacques Chaurette p. eng. copyright 2006

Chlorination Manual. I. Before going to the field. II. In the field. Sierra Leone

Livewell/Baitwell Pumps. Livewell/Aerator

The Discussion of this exercise covers the following points:

Module 6. Tightness Testing

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Introduction. Part one: Identify the Hydraulic Trainer Components

Owner's Manual Sealweld SuperSeal II Pump

OPERATING INSTRUCTIONS AND PARTS LIST AUTOMATIC FILLING MACHINE DE-401-GB-AUTO

CONTENT. General Requirement. 2 Lab Format Lab Reports Self-evaluation Grading of Lab Reports Reference

Load Controls Screw In Cartridge Valves Pressures to 350 bar (5000 psi) Flows to 190 l/min (50 USgpm)

Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

Met One E-BAM Particulate Monitor

Air Ball! Evaluation copy

living with the lab control of salinity 2012 David Hall

Application of Flex-Z release agent with a pneumatic gun

Operator: Save these instructions for future use!

Bell & Gossett ESP-Systemwize Pump Selections

Calcium Reactor. CalcFeeder PRO. User Manual 1.1a. Model. CalcFeeder AC1 PRO CalcFeeder AC2 PRO CalcFeeder AC3 PRO CalcFeeder AC4 PRO

Declining Weight Blending System Quick Start Manual E Main St Marshall, IL Phone: Fax: Website:

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

Pumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE

Reset Volume Controller 2 Reversing Relay 3 Air Valve Actuator 4 Lower-of-Two-Pressures Relay 4 Diverting Relay 5 Higher-of-Two-Pressures Relay 5

CHAPTER 3 : AIR COMPRESSOR

VERTICAL AIR COMPRESSORS

36H SERIES Combination Gas Valve

Manual for continuous distillation

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Biochemistry Laboratory I CHEM 4401 Pipetting & Scales

FX134, FX1234, FX3030 Problem and Solutions

THE INNER WORKINGS OF A SIPHON Jacques Chaurette p. eng. January 2003

User Manual for the Mars Calibration Bench

Free Surface Flow Simulation with ACUSIM in the Water Industry

Nikuni KTM Series Pumps

(Refer Slide Time: 2:16)

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

Installation and Operation 370ESP (Electric Single-Point Purger) & 370ESPR (Retrofit Purger)

OPERATING INSTRUCTIONS AND PARTS LIST HAND OPERATED LPG PISTON PUMP WITH SCALE 301-DH-SP

TABLE OF CONTENTS SAFETY FIRST!...3 BASIC OPERATION...4 ADJUSTMENTS...5. Cocking Pressure...5. Three-Way Valve Adjustment...6

Transcription:

Pump Performance Testing

SAFETY Keep water away from all electrical equipment except the pump, and do your best to keep the pump motor dry. Don t handle the power supply or multimeter(s) with wet hands or wet feet (or when in contact with water). Prevent water from splashing onto or near the power supply. Wipe up any water that leaks onto the floor. Report any problems encountered to your instructor. 2

Goal: Measure the pump curve(s) Head versus flow rate: Efficiency versus flow rate:

Pump testing in a nutshell Table of Content: Prep: 1. Dry test: Make sure the pump works 2. Wet test: Make sure the pump moves water 3. Wire the circuit to measure voltage and current 4. Configure tubing for the pump test Data Collection: Change height of exit tube. Record mass flow rate, voltage and current.

1. Dry Test: Make sure the impeller spins Note: Don t run your pump too long without water. The purpose of the dry test is to verify that the motor works and that the impeller can rotate freely.

1. Dry Test: Make sure the impeller spins Debugging: If the impeller does not spin: Is the lid so tight that impeller rubs? If so, loosen the screws holding the lid in place. Is the motor misaligned? Try wiggling it. Are the electrical leads making good contact? Is the current limit on the power supply exceeded? Increase the current dial.

2. Wet Test: Make sure the pump can move water Priming the pump: Priming is the addition of water to the pump cavity so that the impeller can create enough suction to pull water from the supply reservoir. a) a) Connect the outlet tube first. b) Connect the inlet tube from the supply pail. c) Allow water to flow into the pump cavity (using gravity feed). d) Connect the power to the pump. Set voltage to 12V d) c) b)

2. Wet Test: Make sure the pump can move water Debugging: If water is not flowing: Are there bubbles in the line between the pail and the pump? If so, tap the lines to move the bubbles. Is there water in the pump cavity? If not, make sure the inlet is below the surface of the water in the supply pail, and prime the pump.

3. Wire the circuit to measure voltage and current Use your own multimeter to measure voltage: multimeter is in parallel with motor. Set to DC Volts Use the provided multimeter to measure current multimeter is in series between power supply and motor. Set to DC Amp

3. Wire the circuit to measure voltage and current

4. Configure tubing for the pump test Instructions in following slides Note: h is the distance from outlet of the hose (top) to the free surface in the pail (bottom).

Preliminary Procedure 1. Fill the supply pail to about one-third of full. 2. IMPORTANT: Align the bottom of vertical scale to the water level in the bucket. 3. IMPORTANT: Set the tare weight of the small bucket. 4. Connect the pump to the supply pail and exit tube. All steps are important!

Align the vertical scale to the level of the water surface in the bucket Adjustment screws Look here!

Align the vertical scale to the level of the water surface in the bucket

Use the tare function to cancel the dry weight of the pitcher used to collect water samples. Empty pitcher on the scales Before clicking zero After clicking zero

Collecting Data: Basic Ideas 1. You choose h, then measure V, I, m and t 2. Allow t of at least 15 seconds. Use longer times at low flow rates. 3. Use strategic selection of the order of h First measure at the extremes: Find the maximum h first. Fill in the middle of the range in random order 4. Use multimeters to measure V and I. Do not trust the meters on the power supply

Collecting Data: Basic Ideas (2) 5. Do not make physical changes (e.g. changing impellers) during a single data set. If you make changes, start over, but keep your data. 6. Do not throw away data. Make notes about suspicious data. Discard measurements only at the analysis stage when you are certain that the data is not valid.

Data Collection Procedure Note: Keep the pump running during these measurements. 1. Empty the collection bucket. 2. Move the exit hose to a selected height Water jet should exit the hose horizontally 3. Start the timer as the collection bucket is moved to capture the water 4. Collect enough water 5. Record h, m, t, V and I 6. Repeat for at least 10 settings (10 h values).

Exit tube should be horizontal Like this: Not like this:

Data sheet Label the sheet with team members, date, type of impeller (if more than one is used) Make columns of data for h, V, I, m, t. h (inch) V (volts) I (amp) m (g) t (s) This is just a sample data sheet. Make your own version on a full sheet of paper. Be prepared to take more data than you will eventually use.

Strategic data collection:

Strategic Data Collection Take data where it matters. There is no reason to use the same t for each flow rate measurement. The scientifically best procedure is to use longer t for lower flow rates. Why? There is no reason to use even increments of h. The scientifically best procedure is to use a random order of h values. Why?

Naive data collection h There is no need to use equal spacing of h values. Don t do it! The laws of Physics don t care about equal h! h h h Q h There is no need to collect data in order of increasing or decreasing h. In fact, it s a bad idea 9 8 7 6 5 Don t do it! Take h values in random and in strategic order. 4 3 2 1 Q

Strategic data collection First, establish the range of h for your pump. Note that the maximum h may change during the test. Your pump performance will change as you run your pump.

Strategic data collection The middle value of h determines the curvature of the data set

Strategic data collection h Perform the remainder of the measurements by selecting a random order of h values in the range between minimum and maximum h. Q

Strategic data collection h If the data reduction spreadsheet is created before taking measurements, you can see the pump curve emerge as data is collected. Otherwise, you will have to visualize the data with simple hand sketches. Q

Head (m) Efficiency (%) Living with the Lab Sample results 1.2 1 0.8 0.6 0.4 0.2 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Flow rate (L/min) Measured data Quadratic fit 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 0.00 0.20 0.40 0.60 0.80 Flow rate (L/min) Measured data Quadratic Fit

Summary Study these slides before coming to lab Create a data collection sheet (or spreadsheet) before starting the measurements. Use dry and wet tests to debug your pump before setting up your measurements Set up the V and I measurements Take data strategically