THE ROADMAP TO NORWAY S ARCTIC POLICY SARiNOR MAIN FINDINGS

Similar documents
2 SARiNOR MAIN FINDINGS A SUMMARY 2016 THE ROADMAP TO NORWAY S ARCTIC POLICY

Arctic Emergency Operations

Skipsoperasjoner i Nord

Institutional interplay in Arctic shipping governance: role of the Arctic Council in the development of the IMO's Polar Code

Fremtidsrettede prosjekter ved SMS

MIRG Seminar Mass Rescue Operations. David Jardine-Smith International Maritime Rescue Federation

Amendments to the International Convention on Maritime Search and Rescue of 27 April 1979

Arctic Fisheries and International Law

IMO Polar Code. Industry Seminar: Operational conditions for ships on the NSR Busan. Håvard Nyseth 30 May 2016 MARITIME. Ungraded

Organising the National Technology Needs Assessment (TNA) Process: An Explanatory Note

Amendments to the International Convention on maritime search and rescue of 27 April Concluded London, 18 May 1998.

Arctic challenges, Emergency towing success stories and failed operations. Kay Fjørtoft, T. E. Berg and Ø. Selvik, MARINTEK

Cooperative benefits and challenges in building the necessary preparedness capacities

Search and Rescue ESF 9

Agenda Item 6-ATM Coordination (Airspace restructuring, AIS and SAR agreements)

A reformed CFP needs to be based on sustainability, and use the principle of caution

5 th MARPART Conference, October 2016

AMSA A Roadmap Forward & Relevant Alaska Activities. Captain Bob Pawlowski, NOAA (Ret), MNI Legislative Liaison to the Denali Commission

Training of personnel on Norwegian emergency response vessels

Commonwealth of Dominica. Office of the Maritime Administrator

Crew Training for NSR Shipping

While oil and gas is the nations largest export product in value, fish is the second largest. Both activities are crucial for the Norwegian economy.

Arctic Mining, Shipping and Oil and Gas

Canadian Coast Guard s Role - SAR System in Atlantic Canada MASS15- October 13-15, 2015

oliet gaso danmark Norsk olje &qass Guidelines for Mutual Recognition of Specialised Safety and Emergency Response Training for North Sea Operations

Norwegian fisheries and aquaculture management

Transitioning from coal: An invitation to use Svea as a base for research and academic work. UNIS October 15th, 2015

INTERSPILL 2004 TRONDHEIM JUNE 2004 AN INTEGRATED MARITIME PROTECTION CONCEPT

Interim Investigation Report pertaining to the investigation report 71/17. Very Serious Marine Casualty

VIKING Defence We re right beside you

Outline of the Position Duties and Responsibilities

Creative Solutions for your compliance burdens

International Civil Aviation Organization

EVALUATION OF SEARCH AND RESCUE

COMMENTS ON THE INDUSTRIAL POLICY: THE CASE OF TURKEY

International Convention on Maritime Search and Rescue, 1979

Recent, Ongoing and Planned R&D in Offshore and Helicopter Safety

Why the need for SAR Cooperation

Re: Consultation on the addition of narwhal and two bowhead whale populations to the SARA List

The Austrian mine rescue service. Thomas Spörker Dublin, 9 th October 2014

BLUE ECONOMY IN THE PACIFIC REGION

International Search and Rescue Operations

Arctic Shipping and Risks: Emergency Categories and Response Capacities

CESA Yaoundé 2017 IMPROVING INFORMATION SHARING FOR MARITIME SAFETY IN AFRICA CDR LOÏC MOUDOUMA GABON NAVY 18/07/2017 CESA 1

UK INTERNATIONAL SEARCH AND RESCUE TEAM (UK ISAR) Contact for further information: Assistant Chief Fire Officer David Russel Telephone:

NZQA registered unit standard version 5 Page 1 of 5. Demonstrate knowledge of abandon ship procedures and sea survival techniques

Roadmap towards commercial autonomous shipping in 2025

BYPAD. Bicycle Policy Audit CITY OF GENT March Summary. Tim Asperges Liesbeth Reekmans. Langzaam Verkeer

BASIC SAFETY GUIDANCE FOR YACHT RACES OR OCEANIC VOYAGES BY NON-REGULATED CRAFT

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

Search and Rescue Emergency Support Function

AY 2015 Year in Review

Baltic Marine Environment Protection Commission Task Force on migratory fish species Gothenburg, Sweden, 9 May 2016

Inter-RAC Conference Decision-making within a reformed Common Fisheries Policy (CFP)

TRAINING PROGRAMS 24/7 EMERGENCY RESPONSE

PRESENTATION OF NORSK RIKSTOTO

The Florida Bicycle and Pedestrian Partnership Council

Participate in a rescue operation

Pan-European 2020 Strategy for Biodiversity

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

Training Course for Personnel Involved in Emergency Towing Operations

Fisheries and Oceans Canada Aquatic Invasive Species (AIS) Funding Update. Becky Cudmore, AIS Program Fisheries and Oceans Canada

ATC Volunteer Leadership Handbook Appendix 7. Appendix 7 Trail Crew Safety and Skills Training Policy

An Overview of Recent Projects to Study Thermal Protection In Liferafts, Lifeboats and Immersion Suits

International Convention on Maritime Search and Rescue, 1979

Salmon farming in Norway Controversies, challenges and regulatory responses

The Coast Guard has 145 Years of Arctic Service UNCLASSIFIED

ROAD SAFETY IN COUNTRIES WITH LESS DEVELOPED INFRASTRUCTURES: Policies to maximize effect with minimum resources

THE NORWEGIAN MANAGEMENT OF THE RED KING CRAB. Guri Hjallen Eriksen The Norwegian Ministry of Fisheries and Coastal Affairs,

Report No. 27 to the Storting

Collaboration between the Institute of Marine Research, the fishing fleet and the fishing industry

Reporting on progress made since 2009 on the attainment of the Amsterdam Goals

SAR Co-operation Plan. Part III, IV, V and VI

Korea-Norway Joint Research for Fisheries Industry Focusing on Fisheries Equipment

Council CNL(14)45 The management approach to salmon fisheries in Norway (Tabled by Norway)

Proceedings of the ASME nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France

AWARENESS ON HIGH RISK SITUATION OF BATU BERHANTI LIGHT BUOY IN SINGAPORE STRAIT (assure sustainable isolated danger marking)

Università di Pisa Facoltà di Ingegneria Dipartimento di Ingegneria Meccanica, Nucleare e della Produzione. Emergency Planning.

COWLEY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF9-Search and Rescue

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

Challenges and opportunities in managing Atlantic salmon - the international aspects

Protection Group Providing Solutions. Developing Your Emergency Preparedness

Developing a Mandatory Polar Code Progress and Gaps

Upstream Deepwater Logistics-Aviation

Bent-Håkon Lauritzen Coordinator Nordic Proof

WP 1 Administration. What has happened this period Feb-May 2017

EFICA 2017 Sommarøy Nordic Coastal & Fishing vessel trends

Metropolises on the move ALLIANCE FOR CYCLING

WWF POSITION STATEMENT 63 nd INTERNATIONAL WHALING COMMISSION (IWC) MEETING Jersey, th July 2011

Sustainable coastal fishery in the Baltic Sea in Jurkalne, Latvia

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013

GUIDE TO THE ARCTIC SHIPPING CALCULATION TOOL

Research Programme. USA and China, involving both researchers and stakeholders interested in land used for managed turfgrass areas.

The Icelandic Information System on Weather and Sea State Related to Fishing Vessels Crews and Stability

LETTER OF AGREEMENT BETWEEN THE GOVERNMENT AND THE GOVERNMENT OF INDIA FOR THE CO-OPERATION SEARCH AND RESCUE SERVICES

Government Accelerators

Fisheries administration and new fisheries legislation in Finland

The Emerging Arctic. A New Maritime Frontier

Warming of the North Conference Ottawa Convention Centre (Shaw Centre) 2-3 March 2015

Nordatlantisk Fiskeriministerkonference i Shediac 29. august 2017

Transcription:

THE ROADMAP TO NORWAY S ARCTIC POLICY SARiNOR MAIN FINDINGS Baltimore 2017 April 19 th Tor Husjord www.maritimt-forum.no

www.maritimt-forum.no Arctic Mayday

The Roadmap to Norway s Arctic Policy Content: Why focus on Search and Rescue Vision and goal Project organization and contributors Main findings and recommendations SARiNOR 2 SARiNOR 3 (application)

Norwegian Governmental Arctic Policy (2012) The Government will ensure Norway s capability to exercise SAR within own and neighbouring SAR areas by maintaining and improving the capacity to conduct search and rescue All parties and their organizations have a responsibility to focus on reducing the risk for an accident and systematically handle own incidents in polar waters The government want transparency about the challenges and contribute to development of knowledge and experience transfer

The SAR-Agreement, Arctic Council 2011 - Agreement on cooperation on aeronautical and maritime search and rescue in the arctic. Arctic Council Member states : Canada, Denmark (including Greenland and Faroe islands), Finland, Iceland, Norway, Sweden, Russian Federation, USA

Arctic maritime activity 90% of Norway's maritime zone is located in the Arctic area. 80% of all Arctic maritime activity takes place inside Norway's sector ~ 80% of the risk 4,3 million people live inside the Arctic area. of which 500.000 in Norway 2013 AIS data: totally 1025 vessels representing 60 different flags An accident will occur The question is; are we prepared? AIS-data 2010-2012 1 dot = 1 ship/day

Added risk of arctic operations Risk = Probability x Consequence North Sea/World wide Arctic R R Identify Mitigate Source: DNV GL Additional risk

Increasing and the activity activity level is increasing Turisme Fiskeri

Emergence preparedness, Search and Rescue are prerequisites for future development, value creation and management of the resources in polar areas. The future increased activity includes: Oil and gas Regular Cargo Shipping Tourism Fisheries Aquaculture Sea bed minerals etc.

The vision Norway shall be world leading in planning, coordinating and executing search and rescue operations at sea in the High North.

Main goals Identify information, generate knowledge and new technology contributing to more efficient SAR operations in polar waters Create an arena for information sharing and cooperation among all relevant parties Contribute to the general awareness about maritime operations in polar waters in general and SAR in particular Update the authorities, to ensure a common understanding of the current preparedness level and influence on future implementation of new measures

Participants in the project Ship owners and operators Energy companies Insurance Research institutes Classification Society Consultants Authorities Start: Q4 2013 Duration: 3 years Budget: NOK 20 mill. Financing: 50 % public 50 % private

Partners

Professional and Specialist Contributors Admiral Makarov State University of Maritime and Inland Shipping Christian Michelsen Research, CMR GMC Maritime AS Handelshøgskolen UiN Hansen Protection Harding Safety Kystvakten Lufttransport Sintef Ocean Memorial University of Newfoundland Nord Universitet Nordland fylkeskommune Fiskeri- og Havbruksnæringens Forskningsfond (FHF) Norsafe NORUT Polar Safety Systems SINTEF Tromsø Skipperforening Universitetet i Stavanger Universitetet i Tromsø Universitetssykehuset Nord-Norge Viking Life-Saving Equipment Viking Supply 133 Luftving 330-skvadronen

Project Organization Project Owner Maritimt Forum Nord Steering Committe Financial Contributors Project Manager Advisory and Quality Board WP 1 WP 2 WP 3 WP

Course of Events and Main Challenges Alerting and Incident Search Rescue Notification Survival in Cold Climate Shared Situational Awareness Training and Skills Development

Alerting and Notification Goal: Send and receive correct and sufficient information required for a successful SAR operation Alerting and Notification Main Challenges: Communication limitation far north Practical design of equipment Culture, language and general knowledge about alerting Main findings: Develop a common standard for alerting Improve satellite coverage Better sharing of available information

Search Goal: To find the casualties asap Alerting and Notification Search Søk Main Challenges: Long distances and difficult polar conditions Long time to implement new technology Long way from end user to decision makers Main Findings: Simplify acquisition process- more end user impact Implement state of art equipment Increase helicopter range by establishing more fuel depos

Rescue Goal: Ensure that most of the casualties are rescued Main Challenges: Climate Equipment are not adapted to the actual operation Effective utilization of available resources Main Findings: Need to develop test and performance standards for polar rescue equipment ü lifeboat, rafts, clothing, personal equip., drop-kit Develop more effective equipment for evacuation and rescue of personnel from vessels, sea, lifeboats etc. Develop training courses and accomplish practical training to ensure effective utilization of all available resources Search Rescue

Survival in cold climate Goal: Ensure that the casualties survive until rescue arrives Survival in Cold Climate Main Challenges: Time Low temperatures (hypothermia) Lack of equipment Main findings: Need to adapt existing equipment and procedures to polar environment General training must include evacuation and survival in cold climate Holistic approach to the total rescue chain

Shared Situational Awareness Goal: Everyone involved in an incident has the same understanding of the task at hand and can thereby administer their own resources in the best possible way Shared Situational Awareness Main Challenges: Difficult to get access to the right information Different interface, - no common standard platform for sharing of information Today s technological potential for sharing text, images and live streaming is not fully exploited Main Findings: Need for a common standard interface between the the C31 systems. (command, control, communications and information) Access to Broadband will expand the possibilities to sharing of data Drills are important for establishing and developing a shared situational awareness

Training and Competence Goal: More efficient SAR operations Training and Competence Main Challenges: Different actors Different background and competence Different experience Main Findings: Need for a common basic training All phases to be included: ü Preparedness before an incident ü Ensure a common understanding about a typical SAR operation ü Follow up and implementation of improvements after an incident

Main Findings of the SARiNOR Project Main Finding 1: Survival at accident site, (MF1) MF1 Main Finding 2: Emergency Preparedness (MF2) MF2 Probability to survive = ability to survive at accident site + emergency preparedness

Main Finding 1: Survival at accident site Factors increasing the probability to survive at accident site Avoid hypothermia Further development and implementation of equipment contributing to reduced probability for hypothermia The physical and physiological state as well as basic competence and training Availability of pre-hospital treatment The required equipment will depend on the actual situation Need to improve the requirements to Life Saving equipment to comply with IMO Polar Code s 5-day requirement

Main Finding 2: Rescue and Emergency preparedness Response time is Crucial Measures identified to reduce response time: Swift mobilisation of all actors Adapt equipment to polar challenges Establish equipment depots Presence in polar waters Immediate Access to the different resources

The next steps More activity in polar waters will increase the probability for an accident! The increased risk is not addressed in today s procedures and regulations Norway has a special responsibility for an acceptable rescue and emergency preparedness SARiNOR has revealed several gaps in today s rescue and emergency preparedness

The next steps Scaling and further development of rescue and emergency preparedness to be risk based Acquisition of equipment and infrastructure to be based on a holistic socio-economic analysis SAR equipment needs to be adapted to polar water conditions More training and common drills Based on the expert recommendations from SARiNOR, Maritimt Forum Nord will contribute in the further process to prioritize, develop and implement the main findings

Bilde line

SARiNOR phase 2: Protection of the Environment and Salvage of Property

SARiNOR 2: Protection of the Environment and Salvage of Property SARiNOR phase 1 and 2 will cover all phases following and accident in polar waters Start: Q2 2016 Budget: NOK 18 mill. Finish : Q1 2018 Financing: 50 % Ministry of Foreign Aff. 50 % Private and other public

SARiNOR 2: Salvage of Environment and Property INCIDENT Alerting and Notification Salvage of Property Salvage of Environment Roles and Responsibilities Common Situational Awareness Operation in Cold Climate

SARiNOR 3: Improved safety for operations in Polar Waters Funding applied for 2017 Budget: 20 MNOK (50/50 private/public) Work packages: WP-1 The identification of gaps and input to standards for ensuring survival at an accident scene for at least 5 days, in accordance with the minimum requirements of the Polar Code. WP-2 Testing an verification of critical equipment WP-3 Further development of measures to reduce the response time WP-4 International co-operation and experience sharing

A TOUGH CLIMATE FOR SAR Preparedness by awareness Thank you for the attention.