Curb Ramp Installation Matrix

Similar documents
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

Field guide for Accessible Public Rights-of-Way Edition

Accessible Sidewalk Requirements

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

Paul Vraney Bureau of Project Development 02/11/2016

12A Accessible Sidewalk Requirements. 12A Protruding Objects

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

ADA PRESENTATION (CURB RAMPS)

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

ADA & Public Rights of Way

ADA Retrofits Triggered by Paving: What, When, and Why

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

ADA Operations Contact Info

Americans with Disabilities Act and Curb Ramps

ADA on Construction. Guidance for Section C Plan Preparers

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Accommodating Pedestrians in the Work Zone

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

12A Accessible Sidewalk Requirements

Field guide for Accessible Public Rights-of-Way Edition

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Field Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

City of East Grand Forks. ADA Transition Plan. Inventory Manual. June, 2018 DRAFT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices

ADA Training Standard Plans

ADA Technical Frequently Asked Questions

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

ADA COMPLIANCE IN PUBLIC RIGHTS-OF-WAY. Ali Everett Accessibility Issues Coordinator City of Pasadena January 25, 2018

PEDESTRIAN CROSSING TREATMENTS

Designing Pedestrian Facilities for Accessibility

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Preparing a Curb Ramp Project. December 15, 2010

Designing Accessible Traffic Signals

ADA TRANSITION PLAN 2013

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

2017 Temporary traffic control guidelines for pedestrians. v.2

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

Citywide Sidewalk and Crosswalk Programs

Section 4: Inventory Methodology and Findings

ROUNDABOUTS/TRAFFIC CIRCLES

Please feel free to print this PDF form. The document is below. Please scroll down.

Portland Peninsula Sidewalk and Ramp Inventory

Keeping good roads good

SCOPE Application, Design, Operations,

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Steps to Conducting a Complete Streets Assessment

Driveway Design Criteria

ADA* for Roadway Design

Town of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Traffic Engineering and Highway Safety Bulletin Accessibility Compliance for Military Installations

Town of Wakarusa. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

MUTCD Part 6D: Pedestrian and Worker Safety

Restoration Requirements

ADA TRANSITION PLAN. For

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

Town of Roseland. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

City/ Town: Route: Intersection Name; Street Names:

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

City of Vallejo Traffic Calming Toolbox

COMPLETE STREETS DURING CONSTRUCTION

Marshall County. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

CITY OF PAPILLION, NEBRASKA

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

ADA Operations Contact Info

300 Cross Section Design

MUTCD Part 6: Temporary Traffic Control

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

CURBSIDE ACTIVITY DESIGN

CHAPTER 1 STANDARD PRACTICES

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

6. UNIVERSAL PEDESTRIAN ACCESS

301 Roadway Criteria... 1

Bases, Ballasts, and Paving

MNDOT PAVEMENT DESIGN MANUAL

ODOT Pedestrian and Bicycle Program

California Manual on Uniform Traffic Control Devices

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

Active Transportation Facility Glossary

2018 ROAD MAINTENANCE PROGRAM

Curb Ramp Guidelines. October Version 1.0

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Appendix 3 Roadway and Bike/Ped Design Standards

Ohio Department of Transportation Edition of the OMUTCD It s Here!

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

700 Multi-Modal Considerations

CHAPTER 10 ADA / Public Right of Way. Overview

Transcription:

CURB September 9, 2015 RA INSTA L L ATIO N M AT RIX

Curb Ramp Installation Matrix Table of Contents Introducon.....2 Secon 1: Definion of a Curb Ramp..2 Definion of a Corner Radius..3 Definion of Pedestrian Access Route..3 Examples of Curb Ramps...4 5 Secon 2: Exisng Curb Ramp Evaluaon Criteria....6 Secon 3: Guiding Principles Principle #1: Alteraons vs. Maintenance...6 7 Principle #2: Altered Roadway Exceeding 50% of the Road Width...7 Principle #3: Altered Intersecon Exceeding 50% of the Intersecon Area......8 Principle #4: End and Midpoint of the Radius for Work At or Behind the Curb......8 Secon 4: Curb Ramp Installaon Matrix Flow Chart...9 Appendix A: Curb Ramp Installaon Matrix Figures Figure 1: Street Paving Improvements Full Intersecon Figure 2: Street Paving Improvements T Intersecon Figure 3: Street Paving Improvements Beyond End of Radius Figure 4: Street Paving Improvements Up to or Within End and Mid Point of Radius Figure 5: Street Paving Improvements Exceeding 50% of Intersecon Area Figure 6: Pedestrian Crosswalk Improvements Figure 7: Sidewalk Improvements Figure 8: Curb and Guer Improvements Figure 9: Curb Ramp Construcon Scenarios Figure 10: On Street ADA Parking Figure 11: Bus Stops Appendix B: Variance Request Form 1 2015 City of Tacoma Curb Ramp Installaon Matrix

Curb Ramp Installation Matrix Introducon The Curb Ramp Installaon Matrix provides guidance on work in the right of way that triggers the requirement to construct curb ramps in the City of Tacoma. Per Title II of the Americans with Disabilies Act, the City of Tacoma is required to ensure that people with disabilies have equal access to pedestrian facilies in the right of way. Vercal curbs impede pedestrian access to sidewalks and are one of the major barriers for people with disabilies. The Curb Ramp Installaon Matrix provides a consistent method for determining what type of work in a specific loca on will require the construcon of curb ramps. Street overlays, sidewalk construcon, and curb repairs are a few examples of construcon that may trigger the provision of curb ramps. The Curb Ramp Installaon Matrix was a collaborave effort between staff from various City departments. The following federal and state laws, as well as case law, were used as a basis for the Matrix. Americans with Disabilies Act 1990 (as amended 2008) Secon 504 of the Rehabilitaon Act DOJ/DOT Joint Technical Assistance on Requirements to Provide Curb Ramps 28 CFR Part 35 49 CFR Part 27 RCW 35.68.075 PROWAG Public Right of Way Accessibility Guidelines Secon 1: Definion of a Curb Ramp Definions: Curb Ramp Curb Ramp: Ramp: Running Slope: Cross Slope: Turning Space: A ramp that cuts through or is built up to the curb. Curb ramps can be perpendicular or parallel, or a combination of parallel and perpendicular ramps. A walking surface with a running slope steeper than 20H:1V (5%). A slope measured in the direc on of travel, normally expressed as a percent. The grade that is perpendicular to the direction of pedestrian travel. A level paved area, within or at top and boom of a stair or ramp, designed to provide turning and maneuvering space for wheelchair users and as a resng place for pedestrians. Detectable Warning Surface: A tacle surface feature of truncated dome material built into or applied to the walking surface to alert persons with visual impairments of vehicular ways. Federal yellow is the color used on City of Tacoma projects to achieve visual contrast. Colors other than federal yellow that meet the light on dark/dark on light requirements may be used at the approval of the ADA Coordinator. 2 2015 City of Tacoma Curb Ramp Installaon Matrix

Definions: Corner Radius Corner Radius: A circular area having an extent determined by the length of the radius from a given or specified central point. End of Radius (): the beginning or ending of a radius. Mid Point of Radius (): The middle of a radius central between two End of Radius points. Definions: Pedestrian Access Route Pedestrian Access Route (PAR): A continuous and unobstructed path of travel provided for pedestrians with disabilities within or coinciding with a pedestrian circulation path. Pedestrian access routes consist of one or more of the following pedestrian facilies: Walkways/sidewalks, curb ramps (excluding flares), landings, and crosswalks. Note: Typical Pedestrian Access Route is between the end or mid point of the radius; however, when the Pedestrian Access Route does not intersect the corner radius (e.g. large planter strips, mid block crossings, shared use path) curb ramps are required to assure an accessible pedestrian access route. 3 2015 City of Tacoma Curb Ramp Installaon Matrix

Examples of Curb Ramps The following examples are not intended to be used for design purposes. For informaon on designing curb ramps, please refer to the City of Tacoma Standard Plans. Perpendicular Curb Ramp Photo Here Parallel Curb Ramp, Type A Photo Here Single Direconal Curb Ramp 4 2015 City of Tacoma Curb Ramp Installaon Matrix

Examples of a Curb Ramps The following examples are not intended to be used for design purposes. For informaon on designing curb ramps, please refer to the City of Tacoma Standard Plans. Parallel Curb Ramp, Type B Combinaon Curb Ramp Curb Ramp at Trail 5 2015 City of Tacoma Curb Ramp Installaon Matrix

Secon 2: Exisng Curb Ramp Evaluaon Criteria When exisng curb ramps are within the limits of affected work as defined by the Four Guiding Principles in Secon 3, an evaluaon of those ramps are required to determine if they need to be reconstructed. Following is a list of curb ramp elements that must be evaluated to determine if an exisng curb ramp needs to be reconstructed: (Note criteria used to evaluate exisng curb ramps does not ensure full compliance with current codes. Curb ramps that do not meet current codes will be replaced at a later date). Exisng curb ramp barriers if one or more of these barriers exist, a new curb ramp is required: A curb ramp with a longitudinal slope greater than 10%; or A curb ramp cross slope exceeding the guer slope; or A curb ramp with no turning space/landing.; or Vercal surface disconnuies greater than 1/2 inch. Exisng curb ramp barriers if more than two (2) barriers exist, a new curb ramp is required: A longitudinal slope greater than 8.3%, but less than or equal to 10%. Non compliant turning space/landing (running and/or cross slope greater than 2%) Change in level (not flush) at grade breaks. Non compliant or missing detectable warning Ramp or turning space/landing are cracked, broken, or damaged Out of alignment with opposing curb ramp (more than 1/2 ramp width from opposing ramp). Secon 3: The Four Guiding Principles In the development of the Curb Ramp Installaon Matrix, the City of Tacoma has idenfied Four guiding principles. These Principles are: Principle #1: Alteraons vs. Maintenance 1. Title II of the American Disabilies Act (35.151: New Construcon and Alteraons) requires that state and local governments ensure that persons with disabilies have access to the pedestrian routes in the public right of way. An important part of this requirement is the obligaon whenever streets, roadways, or highways are altered to provide curb ramps where street level pedestrian walkways cross curbs. This requirement is intended to ensure the accessibility and usability of the pedestrian walkway for persons with disabilies. 2. What is road Maintenance compared to a road Alteraon? An alteraon is a change that affects or could affect the usability of a facility or building. Alteraons of streets, roads, or highways include acvies such as reconstrucon, rehabilitaon, resurfacing, widening, and projects of similar scale and effect. Maintenance acvies on streets, roads, or highways, such as filling potholes, are not alteraons. Refer to the following list of examples of alteraon and maintenance acvies. 6 2015 City of Tacoma Curb Ramp Installaon Matrix

What is the difference between Alteraon and Maintenance Acvies? Here are some examples: Alteraon vs. Maintenance Alteraon Maintenance HMA Resurfacing Crack Sealing Overlay Surfacing sealing w/ liquid Mill and Fill asphalt Thin li overlays Chip Seal (by itself, not a Reconstrucon cape seal) Full depth reclamaon Slurry Seal (by itselt, not a Cold in Place Recycling cape seal) Rehabilitaon Fog seal Full slab jacking Scrub sealing Slab jacking Joint crack seals (roung widening prior to crack seal) Open Graded Fricon Course Dowel bar retrofits Microsurfacing Spot high fricon treatments Cape Seal (chip seal in comb. Diamond Grinding w/ either slurry seal or Pavement patching (either microsurface applied on top) full or paral depth) In Place asphalt recycling Source: Department of Jusce/Department of Transportaon Joint Technical Assistance on the Title II of the Americans with Disabilies Act Requirements to Provide Curb Ramps when Streets, Roads, or Highways are Altered through Resurfacing. This document as well as a glossary of terms can be found on the City of Tacoma Project Development website. Principle #2: Altered Roadway Exceeding 50% of Road Width Alteraon impacng more than 50% of the road width is considered by the City as an alteraon and therefore triggers the installaon of accessible features. New ramps are required when: Alteraon extends up to or within the End and Midpoint of the Corner Radius; and Pavement/Overlay is greater than 50% of Roadway Width (regardless of Pavement/Overlay length); and Exisng curb ramp is non compliant (See Secon 2: Exisng Curb Ramp Evaluaon Criteria Curb ramp construcon is required if there is sidewalk or curb present at either end of the pedestrian crossing. Evidence of pedestrian traffic (e.g. goat path) may require a ramp or turning space/landing. NOTE: Every required curb ramp shall have an exisng opposing curb ramp that meets the Exisng Curb Ramp Evaluon Criteria in Secon 2 or a new curb ramp. 7 2015 City of Tacoma Curb Ramp Installaon Matrix

Principle #3: Altered Intersecon Exceeding 50% of Intersecon Area New curb ramps are required on all corners of the intersecon when: Alteraon affects more than 50% of the total area of the intersecon; and Exisng curb ramp is non compliant (See Secon 2: Exisng Curb Ramp Evaluaon Criteria). Curb ramp construcon is required if there is an exisng sidewalk or curb present at either end of the pedestrian crossing. Evidence of pedestrian traffic (e.g. goat path) may require a ramp or turning space/landing. NOTE: Every required curb ramp shall have an exisng opposing curb ramp that meets the Exisng Curb Ramp Evaluon Criteria in Secon 2 or a new curb ramp. Principle #4: End and Midpoint of the Radius for Work At or Behind the Curb New curb ramps are required when: (Typically used for sidewalk and curb ramp replacement projects) Curb/Sidewalk improvements extends up to or between the end and mid point of the corner radius adjacent to the roadway (see Example 1: Sidewalk Construcon) Exisng curb ramp is non compliant (See Secon 2: Exisng Curb Ramp Evaluaon Criteria). Curb ramp construcon is required if there is sidewalk or curb present at either end of the pedestrian crossing. Evidence of pedestrian traffic (e.g. goat path) may require a ramp or turning space/landing. NOTE: Every required curb ramp shall have an exisng opposing curb ramp that meets the Exisng Curb Ramp Evaluon Criteria in Secon 2 or a new curb ramp. Example 1: Work behind the curb extends up to or between the end or mid point of the radius at curb ramp #1 requires work on curb ramp #2 which in turn requires work on curb ramps #3 & #6. Work behind the back of curb that extends beyond the end of radius but does not go beyond the mid point of the radius at curb ramp #4 requires work on curb ramp #5 only. Example 1: Sidewalk Construcon Example 2: New or replaced curb extends up to or between the end or mid point of the radius at ramp #A requires work on curb ramp #B which in turn requires work on curb ramps #C & #F. New or replaced curb extends beyond the end of radius but does not go beyond the mid point of the radius at curb ramp #E requires work on curb ramp #D only. Example 2: Curb Construcon 8 2015 City of Tacoma Curb Ramp Installaon Matrix

Principle #1: Alteraon vs. Maintenance Does Work Improvements include new or altered roadway? Secon 4: ADA Curb Ramp Matrix Flow Chart Principle #2: YES Altered Roadway Exceeding 50% of Road Width Is roadway alteraon greater than 50% of the roadway width and extend up to end of radius or between the end and midpoint of a corner s radius? NO Principle #3: Altered Intersecon Exceeding 50 % of Intersecon Area Is roadway alteraon greater than 50% of the intersecon area? YES YES ADA Ramps are required ADA Ramps are required YES Principle #4: End and Midpoint of Radius for Work At or Behind Curb NO Do Improvements impact the curb or area behind the curb up to end of radius or between end and mid point of corner s radius? NO NO ADA Ramps are required YES Principle #4: End and Midpoint of Radius for Work At or Behind Curb Do Improvements impact the curb or area behind the curb up to end of radius or between end and mid point of corner s radius? NO ADA Ramps are not required 9 2015 City of Tacoma Curb Ramp Installaon Matrix

Appendix A Curb Ramp Matrix Installaon Drawings 10 2015 City of Tacoma Curb Ramp Installaon Matrix

EX. CURB & GUTT EX. CURB & GUTT EX. CURB & GUTT EX. EDGE OF ASPHALT EX. CURB & GUTT NEW PAVEMENT OR ALTATION THROUGH INTSECTION EX. CURB & GUTT NEW CURB RAS REQUIRED ON ALL CORNS WHE THE IS EXISTING OR PROPOSED CURB OR SIDEWALK. NOTES: NEW CURB RAS REQUIRED ON ALL CORNS OF THE INTSECTION WHEN: PAVEMENT/OVLAY EXTENDS UP TO OR WITHIN THE CORN'S RADIUS; AND PAVEMENT/OVLAY IS GREAT THAN 50% OF ROADWAY WIDTH (REGARDLESS OF PAVEMENT/OVLAY LENGTH). EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. FOR DEFINITION OF ALTATION, REF TO SECTION 3 - GUIDING PRINCIPLES OF THE CURB RA INSTALLATION MATRIX. WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. LEGEND: : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 1 STREET PAVING IROVEMENTS FULL INTSECTION ISSUED: September 9, 2015

IN MOST INSTANCES, ONLY ONE CROSSING WILL BE REQUIRED. CITY TO MAKE FINAL DETMINATION ON LOCATION AND ALIGNMENT. NEW PAVEMENT OR ALTATION THROUGH T-INTSECTION NOTES: NEW CURB RAS REQUIRED ON ALL CORNS OF THE INTSECTION WHEN: PAVEMENT/OVLAY EXTENDS UP TO OR WITHIN THE CORN'S RADIUS; AND PAVEMENT/OVLAY IS GREAT THAN 50% OF ROADWAY WIDTH (REGARDLESS OF PAVEMENT/OVLAY LENGTH). EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. FOR DEFINITION OF ALTATION, REF TO SECTION 3 - GUIDING PRINCIPLES OF THE CURB RA INSTALLATION MATRIX. WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. NEW CURB RAS REQUIRED ON ALL CORNS WHE THE IS EXISTING OR PROPOSED CURB OR SIDEWALK. LEGEND: EX. CURB & GUTT EX. CURB & GUTT : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 2 STREET PAVING IROVEMENTS T-INTSECTION ISSUED: September 9, 2015

EX. CURB & GUTT EX. CURB & GUTT NOTES: NEW CURB RAS REQUIRED WHEN: PAVEMENT/OVLAY EXTENDS UP TO OR WITHIN THE CORN'S RADIUS; AND PAVEMENT/OVLAY IS GREAT THAN 50% OF ROADWAY WIDTH (REGARDLESS OF PAVEMENT/OVLAY LENGTH). EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX NEW CURB RA (TYP.) NEW PAVEMENT OR ALTATION CORN RADIUS (TYP.) > 50% OF ROADWAY WIDTH ROADWAY CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. FOR DEFINITION OF ALTATION, REF TO SECTION 3 - GUIDING PRINCIPLES OF THE CURB RA INSTALLATION MATRIX. CORN RADIUS (TYP.) WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. LEGEND: EX. CURB & GUTT EX. CURB & GUTT : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 3 STREET PAVING IROVEMENTS EXTEND UP TO OR WITHIN CORN'S RADIUS ISSUED: September 9, 2015

EX. CURB & GUTT EX. CURB & GUTT NOTES: NEW CURB RAS REQUIRED WHEN: PAVEMENT/OVLAY EXTENDS UP TO OR WITHIN THE CORN'S RADIUS; AND PAVEMENT/OVLAY IS GREAT THAN 50% OF ROADWAY WIDTH (REGARDLESS OF PAVEMENT/OVLAY LENGTH). EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX NEW CURB RA (TYP.) NEW PAVEMENT OR ALTATION CORN RADIUS (TYP.) > 50% OF ROADWAY WIDTH ROADWAY CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. FOR DEFINITION OF ALTATION, REF TO SECTION 3 - GUIDING PRINCIPLES OF THE CURB RA INSTALLATION MATRIX. CORN RADIUS (TYP.) WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. LEGEND: EX. CURB & GUTT EX. CURB & GUTT : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 4 STREET PAVING IROVEMENTS UP TO OR WITHIN END AND MID-POINT OF RADIUS ISSUED: September 9, 2015

EX. CURB & GUTT EX. CURB & GUTT ROADWAY ROADWAY EX. CURB & GUTT EX. EX. EDGE CURB OF & ASPHALT GUTT LIMIT OF INTSECTION PAVING IACTS EXCEED 50% OF INTSECTION'S TOTAL AREA UTILITY REPAIR/CONSTRUCTION, (TYP.) LIMIT OF INTSECTION NOTES: NEW CURB RAS REQUIRED ON ALL CORNS WHEN STREET PAVEMENT IROVEMENTS REQUIRES MORE THAN 50% OF THE INTSECTION'S TOTAL AREA. SEE FIGURE 3 & 4 FOR CURB RA REQUIREMENTS WHEN PAVING IS LESS THAN 50% OF THE INTSECTION'S AREA. EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. FOR DEFINITION OF ALTATION, REF TO THE GUIDING PRINCIPLES SECTION OF THE CURB RA INSTALLATION MATRIX. WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. INTSECTION AREA AREA WHE REPAIR/CONSTRUCTION/STREET RESTORATION IS PLANNED. LEGEND: : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 5 STREET PAVING IROVEMENTS EXCEEDING 50% OF INTSECTION AREA ISSUED: September 9, 2015

EX. CURB & GUTT EX. CURB & GUTT NOTES: NEW CURB RAS ARE REQUIRED FOR ALL NEWLY STRIPED CROSSWALKS. RESTRIPING OF EXISTING CROSSWALK DOES NOT REQUIRE NEW CURB RAS. EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. NEW PEDESTRIAN CROSSWALK MAINTENANCE RESTRIPING STRIPED MID-BLOCK CROSSING NEW PEDESTRIAN CROSSWALK (TYP.) EX. CURB & GUTT EX. CURB & GUTT NEW PEDESTRIAN ACTIVATED FLASHING BEACON (TYP.) NEW CURB RAS ARE REQUIRED. NEW CURB RAS ARE REQUIRED AT ALL NEWLY STRIPED PEDESTRIAN CROSSWALKS. LEGEND: : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 6 PEDESTRIAN CROSSWALK IROVEMENTS ISSUED: September 9, 2015

ADJACENT LEG NEW SIDEWALK OR TRAIL UP TO END OF CORN'S RADIUS OR BETWEEN THE END AND MIDPOINT OF THE CORN'S RADIUS. MINIMUM OF 4 CURB RAS REQUIRED. NEW EX. CURB & GUTT EX. CURB & GUTT CORN RADIUS MID-POINT NOTES: NEW CURB RAS REQUIRED WHEN NEW OR RECONSTRUCTED SIDEWALK OR TRAIL IS INSTALLED UP TO OR WITHIN THE CORN'S RADIUS. IF CONSTRUCTION EXTENDS BEYOND THE MIDPOINT OF THE CORN'S RADIUS, THEN A NEW CURB RA IS REQUIRED ON THE ADJACENT LEG OF THE INTSECTION. EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. CORN RADIUS (TYP.) WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. CORN RADIUS (TYP.) NEW SIDEWALK NEW CURB RA (TYP.) CURB RAS REQUIRED IF CONSTRUCTION EXTENDS BEYOND THE END-POINT OF THE CORN'S RADIUS OR BETWEEN THE END-POINT AND MID-POINT OF THE CORN'S RADIUS. EX. CURB & GUTT EX. CURB & GUTT RECONSTRUCT SIDEWALK MID-BLOCK/OUTSIDE THE CORN RADIUS, NO CURB RAS REQUIRED. SEE SIDEWALK MAINTENANCE POLICY FOR ADDITIONAL INFORMATION. LEGEND: : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 7 SIDEWALK IROVEMENTS ISSUED: September 9, 2015

NEW GUTT UP TO AND BETWEEN THE END-POINT AND MID-POINT OF THE CORN'S RADIUS. MINIMUM OF 4 CURB RAS REQUIRED. EX. CURB & GUTT EX. CURB & GUTT NEW CURB AND GUTT (TYP.) EX. CURB & GUTT CORN RADIUS MID-POINT CORN RADIUS (TYP.) NOTES: NEW CURB RAS REQUIRED WHEN NEW/UPGRADED CURB AND/OR GUTT EXTENDS UP TO OR WITHIN THE CORN'S RADIUS. CURB RA UPGRADE IS REQUIRED ON THE LEG OF THE INTSECTION THE CONSTRUCTION APPROACHES, INCLUDING ON THE ADJACENT LEG IF CONSTRUCTION EXTENDS BEYOND THE MIDPOINT OF THE CORN'S RADIUS. EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX IF CURB RAS ARE LOCATED OUTSIDE THE CORN'S RADIUS, BUT IACTED BY CURB AND/OR GUTT IROVEMENTS, CURB RAS SHALL BE REPLACED AS DESCRIBED ABOVE OR AS REQUIRED BY THE CITY. CURB RA CONSTRUCTION IS REQUIRED IF THE IS SIDEWALK OR CURB PRESENT AT EITH END OF THE PEDESTRIAN CROSSING. EVIDENCE OF PEDESTRIAN TRAFFIC (I.E. GOAT PATH) MAY REQUIRE A CURB RA OR TURNING SPACE. SEE FIGURE 9 FOR THE VARIOUS CURB RA CONSTRUCTION SCENARIOS. NOTE: EVY REQUIRED CURB RA SHALL HAVE AN EXISTING OPPOSING CURB RA THAT MEETS THE EXISTING CURB RA EVALUATION CRITIA IN SECTION 2 OF THE CURB RA INSTALLATION MATRIX OR A NEW CURB RA. WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. NEW CURB RAS REQUIRED IF CONSTRUCTION EXTENDS BEYOND THE END-POINT OF THE CORN'S RADIUS. LEGEND: EX. EDGE CURB & OF GUTT ASPHALT : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 8 CURB AND GUTT IROVEMENTS ISSUED: September 9, 2015

SCENARIO A CONSTRUCT A CONCRETE CURB RA AND 5'X5' LANDING AS DIRECTED BY THE CITY. EX. EDGE OF ASPHALT CORN CURB RA CONSTRUCTION SCENARIOS A B C EX. EDGE OF ASPHALT EX. CURB & GUTT EXISTING CONCRETE CURBING, NO SIDEWALK EXISTING SIDEWALK, NO CONCRETE CURBING NO CONCRETE CURBING OR SIDEWALK PRESENT SCENARIO C MODIFY ASPHALT EDGE AND CONSTRUCT A TEORARY 5'X5' ASPHALT LANDING AS DIRECTED BY THE CITY. ASPHALT EX. CURB & GUTT EX. CURB & GUTT STANDARD CONCRETE CURB RA (TYP.) EX. EDGE OF ASPHALT SCENARIO B CONSTRUCT A TEORARY ASPHALT CURB RA AND LANDING (AS NEEDED) AS DIRECTED BY THE CITY. ASPHALT CURB RA NOTES: CURB RA CONSTRUCTION SCENARIOS: A IF ONLY CONCRETE CURBING (NO SIDEWALK) EXISTS AT A CROSSING'S RECEIVING END, A TEORARY CONCRETE CURB RA/WINGS/LANDING (MINIMUM OF 5'X5') SHALL BE CONSTRUCTED AS DIRECTED BY THE CITY. B IF ONLY SIDEWALK (NO CONCRETE CURB) EXISTS AT A CROSSING'S RECEIVING END, A TEORARY ASPHALT CURB RA/LANDING (MINIMUM OF 5'X5') SHALL BE CONSTRUCTED AS DIRECTED BY THE CITY. C IF THE IS NO SIDEWALK AND CURB AT A CROSSING'S RECEIVING END, THE EDGE OF PAVEMENT SHALL BE MODIFIED AND AN ASPHALT LANDING (MINIMUM OF 5'X5') SHALL BE CONSTRUCTED AS DIRECTED BY THE CITY. EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX CURB RAS AND TURNING SPACES/LANDINGS MAY BE CONSTRUCTED OUT OF ASPHALT (2" OF 3 8" COMMCIAL HMA OV 3" CSTC) AS APPLIES P THE GUIDELINES BELOW. TACTILE SURFACES ARE REQUIRED ON ALL PMANENT CURB RAS AND LANDINGS. VANGUARD, OR EQUIVALENT, MAY BE APPLIED TO ASPHALT PAVEMENT. WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. LEGEND: : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 9 CURB RA CONSTRUCTION SCENARIOS ISSUED: September 9, 2015

EX. CURB & GUTT NOTES: NEW CURB RAS ARE REQUIRED WHEN STRIPING NEW OR ALTING EXISTING STRIPING OF PARKING STALLS. CURB RAS ARE REQUIRED FOR EACH ACCESS AISLE. REF TO PROWAG AND CONTACT ADA COORDINATOR. CONCRETE WHEN CONSTRUCTING NEW CURB RAS AT INTSECTIONS/CROSSINGS WITH PEDESTRIAN ACTUATED PUSH BUTTONS, THE PLACEMENT OF THE PUSHBUTTONS SHALL COLY WITH THE MUTCD. EXISTING CURB RAS SHALL BE EVALUATED P SECTION 2 OF THE CURB RA INSTALLATION MATRIX ROADWAY REF TO STANDARD PLANS FOR STRIPING ADA PARKING STALL ACCESS AISLE ADA PARKING STALL CORN RADIUS (TYP.) LEGEND: EX. CURB & GUTT : END OF RADIUS : MID-POINT OF RADIUS CURB RA INSTALLATION MATRIX FIGURE 10 ON-STREET ADA PARKING ISSUED: September 9, 2015

NOTES: CURB RAS ARE REQUIRED WHEN ALTING OR CONSTRUCTING NEW BUS STOPS COORDINATE WITH TRAFFIC DIVISION FOR ADDITIONAL REQUIREMENTS REGARDING STREET CROSSING CURB RA REQUIRED BUS ZONE EX. CURB & GUTT EX. CURB & GUTT BUS ZONE CURB RA REQUIRED CURB RA INSTALLATION MATRIX FIGURE 11 ALTED OR NEW BUS STOP WITHOUT PARKING ISSUED: September 9, 2015

Appendix B Variance Request Form 11 2015 City of Tacoma Curb Ramp Installaon Matrix

Public Works Department Curb Ramp Matrix Variance Request Form Application for Variance to the City of Tacoma Curb Ramp Installation Matrix Purpose: The COT Curb Ramp Installation Matrix was developed in an effort to ensure a consistent method for assessing and providing curb ramps throughout the City. The City of Tacoma is committed to equal access and removing barriers that may prevent people for navigating our rights-of-way. Due to the varying nature of projects and their impact on the rightof-way, a set of principles was developed that could be equally applied. However, there may be circumstances that may require an exception to the Curb Ramp Matrix. For example, an intersection with curb and gutter is being overlaid and there is no existing or proposed sidewalk for a few blocks in any direction. For situations such as this, a process has been established to review construction projects on a case by case basis. Process: In order for a project to be considered for an exception to the Curb Ramp Installation Matrix, the applicant must conduct a thorough analysis of the possible impact to pedestrians. Please submit a Curb Ramp Matrix variance request form to the Street Operations Division Manager and ADA Coordinator. They will meet with applicant to review the application. If approved, a note will be added to the design plans that will include the reason for the request and the considerations that led to an approval. Submit a Request: 1) Scope of work 2) Specific proposal for work. What are you requesting? 3) The site specific factors or reasons supporting the request: a. Are there indications of pedestrian traffic such as goat paths? b. Proximity to nearest bus stops c. Proximity to businesses, social service agencies, government facilities d. Proximity to nearest sidewalks (a map/plan shall be included to support request) Please submit your request by sending an email or hard copy to: Rae Bailey, Street Operations Division Manager at rbailey@cityoftacoma.org, phone 253-591-5488 Gail Himes, ADA Coordinator, at ghimes@cityoftacoma.org phone 253-591-5785 Last Revised: 4 25 2012

Public Works Department Curb Ramp Matrix Variance Request Form The undersigned requests a variance from the requirements set forth in the Curb Ramp Matrix Submit to: City of Tacoma Attn: Street Operations Division Manager Public Works Department Street Operations Division 2324 South C Street Tacoma, WA 98402 Permit Number: Location or Address of Variance Request: Variance Requested for Policy Section(s): Name of Permittee: Phone: Address of Permittee: City: State: Zip: Signature of Permittee: Date: Please state below the reason for the request of variance. Include additional pages and supporting documentation, if necessary. Approved Denied ADA Coordinator/Street Operations Division Manager Date Last Revised: 4 25 2012