CURB RAMP INSPECTION REPORT

Similar documents
ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

ADA Operations Contact Info

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

Restoration Requirements

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

City of East Grand Forks. ADA Transition Plan. Inventory Manual. June, 2018 DRAFT

ADA Technical Frequently Asked Questions

ADA Training Standard Plans

Preparing a Curb Ramp Project. December 15, 2010

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Portland Peninsula Sidewalk and Ramp Inventory

Americans with Disabilities Act and Curb Ramps

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

ADA Operations Contact Info

Field guide for Accessible Public Rights-of-Way Edition

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

Town of Wakarusa. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Field Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)

Paul Vraney Bureau of Project Development 02/11/2016

City/ Town: Route: Intersection Name; Street Names:

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Town of Roseland. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Field guide for Accessible Public Rights-of-Way Edition

Town of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

Designing Accessible Traffic Signals

ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Section 4: Inventory Methodology and Findings

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

L C E C.P. #2. BASIS OF BEARINGS: Texas Coordinate System of 1983 (NAD83), North Central Zone (4202) as tied to GEOSHACK VRS SYSTEM.

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

ADA PRESENTATION (CURB RAMPS)

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

Marshall County. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Driveway Design Criteria

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

CITY OF PAPILLION, NEBRASKA

ADA TRANSITION PLAN FOR ACCESSIBILITY OF PEDESTRIAN FACILITIES WITHIN THE PUBLIC RIGHT-OF-WAYS FRANKLIN COUNTY, FLORIDA

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

Segment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification:

Citywide Sidewalk and Crosswalk Programs

ADA on Construction. Guidance for Section C Plan Preparers

Curb Ramp Installation Matrix

Town of Osceola. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Accommodating Pedestrians in the Work Zone

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices

Accessible Sidewalk Requirements

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

CITY OF SAN JOSÉ, CALIFORNIA DETAILED ADA TRANSITION PLAN UPDATE FOR SIDEWALKS REVISED DRAFT - MARCH 20, 2008

Steps to Conducting a Complete Streets Assessment

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

DPW Order No:

ADA TRANSITION PLAN 2013


Traffic Engineering and Highway Safety Bulletin Accessibility Compliance for Military Installations

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score

City of Margate, Florida. Neighborhood Traffic Management Manual

ADA TRANSITION PLAN. For

300 Cross Section Design

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Accessible Sidewalks and Street Crossings

301 Roadway Criteria... 1

ADA & Public Rights of Way

ADA COMPLIANCE CHECKLIST (RESTAURANT) Meet Fail N/A. Parking Lot

Designing for Individuals who are visually impaired or blind

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

BI-DIRECTIONALS FREE-ACCESS

12A Accessible Sidewalk Requirements

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Van Ness Avenue Bus Rapid Transit

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

Complete Streets and the Americans with Disabilities Act (ADA) Jennifer E. Ruley, PE Active Transportation Engineer Louisiana Public Health Institute

Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance

First Annual Colorado Chapter Conference Englewood, CO. Accessible Pedestrian Facilities in the

GENERAL. 1. Description

Off-road Trails. Guidance

CHAPTER 10 ADA / Public Right of Way. Overview

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

PERMANENT PAVEMENT MARKING PLAN

4 GENERIC COST ESTIMATING TOOL

PERMANENT PAVEMENT MARKING PLAN

Regional Transit (RT) District Priority Survey

BUREAU OF LOCAL ROADS & STREETS 42-3(12) BICYCLE FACILITIES Jan 2006

Riverside County Transportation Department Summary of Bids

2018 ROAD MAINTENANCE PROGRAM

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

Transcription:

11.9% St Ltg Box Pac Bell Elec St Ltg Box CURB RAMP INSPECTION REPORT 149 BLUXOME STREET - SAN FRANCISCO - 5TH STREET & TOWNSEND STREET APPLICANT: ZAYO GROUP DATE: 2/9/17 1 0.3% 1.4% 12.1% 0.3% 0.6% 12.7% 11.4% 0.4% 3.2% Fire Alarm 3.0% 2 3 3.2% 2.7% 0.3% 0.5% 0.6% 1.1% 0.1% 0.3% 0.2% LEGEND: 2.... ADA RAMPS INSPECTED ALMENDARIZ CONSULTING, INC. 1136 SUNCAST LN STE 9 EL DORADO HILLS, CA 95762 (888) 306-1211 OFFICE (888) 768-7022 FAX CA C31 LIC #979806.... TRENCH ROUTE M.S............ MEETS DPW STANDARD PLAN 55,017, REV.4, DWG. CR-1

Ramp Number: 1 - N RIGHT - Corner Ramp N Curb Return Corner ADD PHOTO

Ramp Number: 1 - N RIGHT - Corner Ramp CURB RAMP CHECKLIST: IS THERE A CURB RAMP DOES IT MEET DPW STANDARD CURB RAMP PLAN 55,017 Rev.3 RAMP: 4FT. WIDE RAMP 4FT. X 4FT. LEVEL LANDING AT TOP (2% MAX. GRADE IN ALL DIRECTIONS 2FT. 2FT. X 4FT. LEVEL LANDING AT BOTTOM (2% MAX. CROSS SLOPE GRADE) SLOPE OF RAMP MEETS REQUIREMENTS (MAX. 8.3%) CROSS SLOPE OF RAMP 2% MAX OR LESS RAMP CENTERLINE PARALLEL TO CROSSWALK IF NOT PARALLEL, GIVE LOCATION: RAMP SURFACE IS SLIP RESISTANT RAMP FLARES: RAMP FLARE IS 10% OR LESS DISTANCE BETWEEN FLARES IS 4FT. OR MORE IF NOT, EXPLAIN IF THERE IS A SITE CONDITION THAT DOES NOT ALLOW FOR 4FT. OF SEPARATION: STREET NAME: IS STREET NAME STAMPED ON THE RAMP FLARE Y / N CURB RAMP BORDER: CURB RAMP GROOVES - 12" WIDE & 1/4" WIDE GROOVES. SPACES 3/4" APART IF NOT, DESCRIBE THE EXISTING CONDITION:

Headquarters: (916)939-3392 Toll Free: (888)306-1211 Fax: (916)720-0273 Ramp Number: 1 - N RIGHT - Corner Ramp GUTTER LIP: IS THERE NO LIP AT THE GUTTER SO THE TRANSITION IS SMOOTH IF THERE IS A LIP, DESCRIBE THE EXISTION LIP: VERTICAL OBSTRUCTIONS: ARE THERE ANY OBSTRUCTION IN THE FLARED SIDES IF YES, DESCRIBE OBSTRUCTION: Fire alarm DETECTABLE SURFACE: IS THERE A TRUNCATED DOME IF NO, IS THE RAMP SLOPE GREATER THAN 6.67% BUT LESS THAN 8.33% RECOMMENDATIONS: MEETS DPW STANDARD PLAN 55,017, REV. 4, DWG. CR-1 IF NO, COMPLETE ONE OF THE FOLLOWING IMPROVEMENT PLAN EXCEPTION WAIVER HARDSHIP Ramp does not meet DPW Standard Curb Ramps Plan 55,017 Rev. 4, Dwg. CR-1. We recommend leaving the existing ramp in place and installing truncated domes. See improvement plan. See hardship waiver.

CONSTRUCTION NOTES 1 INSTALL TRUNCATED DOMES MEETING DPW STANDARD CURB RAMPS PLAN 55,017.1 REV. 1, DWG. NO. CR-2. Pac Bell St Ltg Box St Ltg Box Elec 1 SEE SHEET 3B FOR IMPROVEMENTS. CORNER RAMP #1 - NORTH RIGHT CORNER SCALE: 1"=5' ALMENDARIZ CONSULTING, INC. 1136 SUNCAST LN STE 9 EL DORADO HILLS, CA 95762 (888) 306-1211 OFFICE (888) 768-7022 FAX REVISIONS REV DONE REV. DESCRIPTION BY DATE PROJECT NO. DRAWN DESIGNED CHECKED 149 BLUXOME ST. JAV JAV REP DATE FEBRUARY 9TH, 2017 SHEET NO. 3A OF 10

Ramp Number: 2 - N LEFT - Corner Ramp N Curb Return Corner ADD PHOTO

Ramp Number: 2 - N LEFT - Corner Ramp CURB RAMP CHECKLIST: IS THERE A CURB RAMP DOES IT MEET DPW STANDARD CURB RAMP PLAN 55,017 Rev.3 RAMP: 4FT. WIDE RAMP 4FT. X 4FT. LEVEL LANDING AT TOP (2% MAX. GRADE IN ALL DIRECTIONS 2FT. 2FT. X 4FT. LEVEL LANDING AT BOTTOM (2% MAX. CROSS SLOPE GRADE) SLOPE OF RAMP MEETS REQUIREMENTS (MAX. 8.3%) CROSS SLOPE OF RAMP 2% MAX OR LESS RAMP CENTERLINE PARALLEL TO CROSSWALK IF NOT PARALLEL, GIVE LOCATION: RAMP SURFACE IS SLIP RESISTANT RAMP FLARES: RAMP FLARE IS 10% OR LESS DISTANCE BETWEEN FLARES IS 4FT. OR MORE IF NOT, EXPLAIN IF THERE IS A SITE CONDITION THAT DOES NOT ALLOW FOR 4FT. OF SEPARATION: STREET NAME: IS STREET NAME STAMPED ON THE RAMP FLARE CURB RAMP BORDER: CURB RAMP GROOVES - 12" WIDE & 1/4" WIDE GROOVES. SPACES 3/4" APART IF NOT, DESCRIBE THE EXISTING CONDITION:

Headquarters: (916)939-3392 Toll Free: (888)306-1211 Fax: (916)720-0273 Ramp Number: 2 - N LEFT - Corner Ramp GUTTER LIP: IS THERE NO LIP AT THE GUTTER SO THE TRANSITION IS SMOOTH IF THERE IS A LIP, DESCRIBE THE EXISTION LIP: VERTICAL OBSTRUCTIONS: ARE THERE ANY OBSTRUCTION IN THE FLARED SIDES IF YES, DESCRIBE OBSTRUCTION: DETECTABLE SURFACE: IS THERE A TRUNCATED DOME IF NO, IS THE RAMP SLOPE GREATER THAN 6.67% BUT LESS THAN 8.33% RECOMMENDATIONS: MEETS DPW STANDARD PLAN 55,017, REV. 4, DWG. CR-1 IF NO, COMPLETE ONE OF THE FOLLOWING IMPROVEMENT PLAN EXCEPTION WAIVER HARDSHIP No ramp currently exists at this corner. We recommend installing a ramp which meets DPW Standard Curb Ramps Plan 55,017 Rev. 1, Dwg. CR-1. See improvement plan.

CONSTRUCTION NOTES 1 CONSTRUCT NEW CURB RAMP MEETING DPW STANDARD CURB RAMPS PLAN 55,017 REV. 4, DWG. NO. CR-1 AND INSTALL TRUNCATED DOMES MEETING DPW STANDARD CURB RAMPS PLAN 55,017.1 REV. 1, DWG. NO. CR-2. AREA SHOWN IS TO PROVIDE THE CONTRACTOR WITH AN APPROXIMATION OF THE LIMITS OF REMOVE AND REPLACE FOR THE CURB RAMP. ANY SIDEWALK CURB AND GUTTER AND ASPHALT PAVEMENT SHOWN WITHIN THE LIMIT IS CONSIDERED AS PART OF THE CURB RAMP CONSTRUCTION WITH NO ADDITIONAL COMPENSATION. 2 REMOVE AND REPLACE ASPHALT CONCRETE ROADWAY WITH 6" HMA OVER 12" CLASS 2 BASE OR MATCH EXISTING, WHICHEVER IS GREATER. Pac Bell 3 REMOVE AND REPLACE CURB AND GUTTER WITH NEW CURB AND GUTTER PER DPW STANDARD COMBINED CURB AND GUTTER PLAN 87,170 TO MATCH EXISTING. St Ltg Box 10.77TS (E)10.76TS St Ltg Box 4 REMOVE AND REPLACE CONCRETE SIDEWALK WITH CITY STANDARD SIDEWALK. CONCRETE LANDING TO BE 4' X 4' WITH MAXIMUM 2% CROSS SLOPE. Elec 10.71TS 2% 4 1.5% 4 10.69TS 9.7% SEE SHEET 3B FOR IMPROVEMENTS. (E)10.00FL BASIS 10.63TS 1.5% 9.6% 8% 1 10.19FL (E)10.23FL 10.22FL 10.10FL 10.11FL 10.13FL 3 2 CORNER RAMP #2 - NORTH LEFT CORNER SCALE: 1"=5' ALMENDARIZ CONSULTING, INC. 1136 SUNCAST LN STE 9 EL DORADO HILLS, CA 95762 (888) 306-1211 OFFICE (888) 768-7022 FAX REVISIONS REV DONE REV. DESCRIPTION BY DATE PROJECT NO. DRAWN DESIGNED CHECKED 149 BLUXOME ST. JAV JAV REP DATE FEBRUARY 9TH, 2017 SHEET NO. 3B OF 10

Ramp Number: 3 - W LEFT - Corner Ramp W Curb Return Corner ADD PHOTO

Ramp Number: 3 - W LEFT - Corner Ramp CURB RAMP CHECKLIST: IS THERE A CURB RAMP DOES IT MEET DPW STANDARD CURB RAMP PLAN 55,017 Rev.3 RAMP: 4FT. WIDE RAMP 4FT. X 4FT. LEVEL LANDING AT TOP (2% MAX. GRADE IN ALL DIRECTIONS 2FT. 2FT. X 4FT. LEVEL LANDING AT BOTTOM (2% MAX. CROSS SLOPE GRADE) SLOPE OF RAMP MEETS REQUIREMENTS (MAX. 8.3%) CROSS SLOPE OF RAMP 2% MAX OR LESS RAMP CENTERLINE PARALLEL TO CROSSWALK IF NOT PARALLEL, GIVE LOCATION: Towards center of intersection RAMP SURFACE IS SLIP RESISTANT RAMP FLARES: RAMP FLARE IS 10% OR LESS DISTANCE BETWEEN FLARES IS 4FT. OR MORE IF NOT, EXPLAIN IF THERE IS A SITE CONDITION THAT DOES NOT ALLOW FOR 4FT. OF SEPARATION: STREET NAME: IS STREET NAME STAMPED ON THE RAMP FLARE Y / N CURB RAMP BORDER: CURB RAMP GROOVES - 12" WIDE & 1/4" WIDE GROOVES. SPACES 3/4" APART IF NOT, DESCRIBE THE EXISTING CONDITION:

Headquarters: (916)939-3392 Toll Free: (888)306-1211 Fax: (916)720-0273 Ramp Number: 3 - W LEFT - Corner Ramp GUTTER LIP: IS THERE NO LIP AT THE GUTTER SO THE TRANSITION IS SMOOTH IF THERE IS A LIP, DESCRIBE THE EXISTION LIP: VERTICAL OBSTRUCTIONS: ARE THERE ANY OBSTRUCTION IN THE FLARED SIDES IF YES, DESCRIBE OBSTRUCTION: DETECTABLE SURFACE: IS THERE A TRUNCATED DOME IF NO, IS THE RAMP SLOPE GREATER THAN 6.67% BUT LESS THAN 8.33% RECOMMENDATIONS: MEETS DPW STANDARD PLAN 55,017, REV. 4, DWG. CR-1 IF NO, COMPLETE ONE OF THE FOLLOWING IMPROVEMENT PLAN EXCEPTION WAIVER HARDSHIP Ramp does not meet DPW Standard Curb Ramps Plan 55,017 Rev. 4, Dwg. CR-1. We recommend leaving the existing ramp in place and installing truncated domes. See improvement plan. See hardship waiver.

CONSTRUCTION NOTES 1 INSTALL TRUNCATED DOMES MEETING DPW STANDARD CURB RAMPS PLAN 55,017.1 REV. 1, DWG. NO. CR-2. 1 CORNER RAMP #3 - WEST LEFT CORNER SCALE: 1"=5' ALMENDARIZ CONSULTING, INC. 1136 SUNCAST LN STE 9 EL DORADO HILLS, CA 95762 (888) 306-1211 OFFICE (888) 768-7022 FAX REVISIONS REV DONE REV. DESCRIPTION BY DATE PROJECT NO. DRAWN DESIGNED CHECKED 149 BLUXOME ST. JAV JAV REP DATE FEBRUARY 9TH, 2017 SHEET NO. 3C OF 10