Model VR6 System. Installation, Operation & Maintenance

Similar documents
Gas Chlorination Systems Series E5000 Up to 100ppd Instruction Manual

HGC-200 Hydro Gas Chlorinator

ACV-10 Automatic Control Valve

Automatic Switchover Gas Chlorination Systems Series 900

Instruction Manual ADVANCE Series 480 Vacuum Regulator

Instruction Manual Series 200 ADVANCE Cylinder or Ton Container Mounted Vacuum Regulators

Chemical Injection Technologies Installation/Service Bulletin

RG1200 Service and Repair Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

MEGR-1912 Instruction Manual

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

INSTALLATION INSTRUCTIONS 1/2 THERMOSTATIC VALVE AND TRIM

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

LRS(H)4 Pressure-Reducing Regulator User Manual

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Hydraulic Punch Drivers

Chlorinator. MODEL C-731 (Floor Mounted)

Installation Instructions

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Latvin Luxury Shower Panel. Telephone Product Specification. ~ Minimum Working Pressure 1.0 bar ~ Maximum Working Pressure 3.

TECHNICAL DATA CAUTION

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Installation, Operation, and Maintenance Manual

WHEATLEY Series 500 Swing Check Valve

Capital Controls Series NXT3000 Modular design gas feed system with self-contained automatic switchover capability.

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

RD(H)20/25 Pressure-Reducing Regulator User Manual

Instruction Manual Updated 7/26/2011 Ver. 2.2

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

12S 1st Stage. -Maintenance Procedure-

Operation Manual Piston Sensed Gas Pressure Regulators

Manual Actuated Boiler Blowdown Valves

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Model Secure-Gard Pilot Operated Vent Valve SECTION II. Remove all packing material inside and outside of the valve prior to installation.

Vacuum Operated Liquid Chemical Feed Systems

MAINTENANCE PROCEDURE FOR X 650

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

Booster Pump PB4-60 Replacement Kits

Maintenance and Repair. AirHawk II Air Mask. Second Stage Regulator. Order No.: /02 Prnt. Spec (I) MSAsafety.

2008 by Controlmatik ABW

Installation Troubleshooting Maintenance Instructions Installation / Start-up

ASSEMBLY & USE MANUAL

Float Operated Level Controllers

Service and Repair Manual

CAPITAL CONTROLS SERIES NXT3000

1200B2 Series Service Regulators. Instruction Manual

American Meter Co. Five-Year Limited Warranty Industrial Regulators

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

GILMONT ACCUCAL FLOWMETERS

Installation Instructions

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

AIR/OVER HYDRAULIC JACK 20 TON

Installation, Operation, and Maintenance Manual

RS(H)20, 25 USER MANUAL

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

INTENDED USE TECHNICAL SPECIFICATIONS

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

DS05C,D,G Dial Set Pressure Regulating Valves

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

Aquor House Hydrant V2

4400 TwinHybrid Gas Seal

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

book : t95575.fm Seite 1 Mittwoch, September 20, :10 AM. Avensys. Exposed Single Lever Mixer

Drawn up by: / RK Revision: 01 Reviewed: Page: 1 of 23 HI-SR 540 USA. Operating instruction SR 540 Face Shield

Anderson Greenwood Series 400 Diaphragm Pilot Operated Safety Relief Valves. Installation and Maintenance Instructions for

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER DRYER

MEGR-1627 Instruction Manual

SWIRLFLO Refrigerated fountains with FLEXI-GUARD

1800C and 1800C-HC Series Service Regulators

! WARNING. Before using this product read and understand instructions.

Pressure Dump Valve Service Kit for Series 2300 Units

Binks SG-2 Plus TM Rotary 2 QT. PRESSURE CUP

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

Installation Instructions

Installation Instructions

Installation and Maintenance Manual. Compact Medical Gas Outlets

30T A/Manual Hydraulic Shop Press

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200

RAINBOW CHLORINE/BROMINE FEEDER MODEL #320

RB70 Automatic Diluent Valve Maintenance Manual. Version 1.1 November 2006 Written by Tino de Rijk. Page 1 of 23

Pressure Dump Valve Service Kit for Series 3000 Units

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INLOOP ACE CRUDE OIL SAMPLER

64 Series Pressure Reducing Regulators

Helium-Oxygen Blender

TEST SPECIFICATION NYT-909-C

Transcription:

Model VR6 System Installation, Operation & Maintenance General: All Archer Instruments chlorination systems are carefully designed and tested for years of safe, accurate field service. All Archer Instruments chlorination systems are carefully tested prior to shipment. All Archer Instruments products are made of the finest materials. To ensure best operation, read these instructions carefully and completely and store them where all maintenance personnel will have access to them. Safety: When working with chlorine, always use caution and follow applicable safety procedures. General safety considerations: * Store chlorine separately from ammonia. * When using chlorine, avoid locations that expose the cylinder and equipment to direct sunlight. * Do not apply heater or heat source directly to chlorine cylinders. * 150lb (upright) cylinders: Always keep cylinders upright and ensure the steel valve cap is in place when moving cylinders. Once cylinder is in place, a safety chain should be used to secure the cylinder. * Ton Containers: Use appropriate handling equipment when moving ton containers. When readying ton container for use, ensure valves are aligned vertically. The top valve accesses gaseous chlorine and the bottom valve accesses liquid chlorine. The bottom valve should never be touched unless your system employs a chlorine heat exchanger (evaporator) designed expressly for use with liquid chlorine. When drawing gas from ton containers an appropriate ton container adapter and drip leg must be used (also available from Archer).

Installing the VR6 Vacuum Regulator: 1) Carefully inspect the cylinder valve outlet surfaces and vacuum regulator inlet capsule surfaces for damage or debris prior to installation. 2) Note that the inlet port on the VR6 regulator ships with a filter cartridge installed. Do not remove this filter, as doing so will bring on maintenance requirements. 3) Always use a new lead gasket when connecting the vacuum regulator to a chlorine cylinder valve. 4) Holding the vacuum regulator upright, settle it over the cylinder valve and fit the inlet capsule into the cylinder valve outlet port. 5) Using a 3/8 wrench, tighten the yoke assembly half-dog set screw so that the lead gasket is crushed between the valve and the inlet capsule. 6) Connect the vent and vacuum tubing to the regulator (these are labeled). See Figure 1. NOTE: Vent tubing should always be connected and run to a safe location (outside of any building). A vent bug cap (provided with every Archer vacuum regulator) should be fitted over the end of vent tubing to prevent insects from entering the equipment. Installing the Remote Meter: 1) The remote meter panel is typically installed on a wall or panel using the two pre-drilled mounting holes found on the meter body. However, the VR6 design allows for mounting the remote meter directly to the VR6 vacuum regulator, using the ¼ pipe nipple and mounting screw, which are include in your accessory pack. 2) The remote meter panel must be installed in the system between the vacuum source (ejector) and the gas source (chlorine cylinder / vacuum regulator). Refer to Figure 1. 3) Note that the gas flows up through the remote meter panel, and from the chlorine cylinder to the ejector. The top tubing connector is connected to the ejector (vacuum source) and the bottom tubing connector to the vacuum regulator. 4) Once the remote meter panel is mounted and the tubing connected, it can be used to perform a quick check on the system for vacuum leaks. By operating the ejector with the chlorine cylinder valve(s) shut, the ball in the remote meter panel should settle at the bottom and not move. If the ball continues to float or if it continually bounces, a vacuum leak is indicated in the system.

Operating the VR6 Vacuum Regulator: 1) Prior to placing the vacuum regulator into operation, it is important to carefully test the lead gasket seal. A small squeeze bottle (provided with every Archer vacuum regulator) should be partially filled with ammonia. Squeezing the bottle allows the ammonia fumes to be used to test for chlorine leaks. A leak is detected by a visible light gray / white gas cloud when the two fumes interact. To test for leaks, open the cylinder valve 1/3 turn and then close immediately. This pressurizes the lead gasket seal but ensures the full cylinder of chlorine is isolated during leak testing. Use ammonia fumes around the cylinder valve and lead gasket to check for any signs of leaking gas. If a leak is found, this must be addressed before placing the unit into operation. 2) After confirming no leaks exist, open the chlorine cylinder valve 1/3 of a turn. This is fully open and there is no need to open the valve further. 3) If the remote meter is not mounted on the VR6, no further action is needed. 4) If the remote meter is installed on the VR6, adjust the remote meter s rate valve knob until the desired feed rate is indicated on the graduated meter tube.

Operating the Remote Meter: 1) Once installed and connected, the remote meter panel is placed into operation by opening the cylinder valves and operating the ejector. 2) Turn the rate control knob until the desired feed rate is indicated. NOTE: The rate control valve is not designed to be used as a shut-off valve. To shut off gas feed, shut off motive water to the ejector. Maintaining the VR6: Recommended Maintenance Frequency: Archer recommends yearly routine maintenance. -Refer to the parts diagram when performing maintenance on the VR6. 1) To disassemble, remove the two yoke screws and pull the metal yoke & inlet assembly out of the back of the vacuum regulator. 2) Remove the four body screws and separate the front and back bodies. The diaphragm assembly can then be removed by carefully pulling it straight out of the front body. Take care to not lose the vent spring, which is located between the diaphragm assembly and the front body. 3) The guide pin is threaded into the rear diaphragm plate and should not need to be removed during routine maintenance. 4) The rear diaphragm plate and front diaphragm plate are threaded together and can often be unscrewed by hand. If they will not unscrew by hand, it may be necessary to use a vice and / or channel locks. Unscrewing these two parts allows for the removal of the diaphragm. 5) Whenever routine maintenance is being performed, all parts should be thoroughly cleaned. It is recommended that all o-rings (with the exception of the OA-VIT-332) be replaced. 6) When reassembling, new o-rings should be given a thin film of the Fluorolube grease. NEXT: The inlet assembly is a critical component in the safe function of the vacuum regulator. Improper handling or reassembly can result in dangerous leakage of chlorine gas. Archer recommends that only trained personnel or those familiar with vacuum regulator maintenance service the inlet assembly.

To service the inlet assembly: 1. Remove the two screws holding the metal yoke plate to the vacuum regulator body. 2. Grasp the metal yoke and with a slight turning motion pull it out of the back body. 3. Remove the OA-VIT-214 O-Ring from the Seal Plug. 4. Remove the Inlet Filter Holder (and/or the filter) from the Seal Adapter. 5. Using a short flat head screwdriver and a pair of pliers unscrew the YMA-100A Inlet Valve Stem from the VRA-601A Spring Retainer. NOTE: Protect the VRA-601A Spring Retainer from the pliers with a cloth or paper. NOTE: This should be done with the Seal Plug installed in the Yoke Assembly unless the Yoke Assembly is being replaced. 6. Now the VRA-601A, YMA-100A and SPA-104 should be removed and cleaned. NOTE: Especially clean the YMA-100A in the region where it meets the YPA-101A to form the seal. This surface should be polished as smooth as possible without scratching the surface. 7. Using a rod of 0.250" diameter, the YPA-101A Inlet Valve Seat can be pressed out of the Seal Plug from the spring side. The YPA-101A should be cleaned and carefully inspected for scratches or cuts especially where it is to seal with the YMA-100A. NOTE: Sometimes the YPA-101A will be cut or deformed such that it cannot seal. If you perform this service and the Vacuum Regulator is still leaking to vent, then the YPA-101A should be replaced with a new one. 8. Clean the Seal Plug thoroughly before reassembling the unit in the following order: a. Lubricate O-Rings with Fluorolube grease. b. Insert the new or cleaned YPA-101A with O-Ring OA-VIT-010. c. Insert and retighten the YMA-100A, VRA-601A and SPA-104 as shown in the drawing. NOTE: DO NOT USE EXCESSIVE FORCE IN TIGHTENING the YMA-100A to the VRA-601A. d. Insert a new Filter Cartridge. e. Install a new OA-VIT-214 O-Ring on the Seal Plug. -Should you have any questions during maintenance of your vacuum regulator, please contact your local service provider or Archer for support.

Maintaining the Remote Meter: 1. Unscrew the rate valve knob and stem (by hand) completely out of the rate valve bonnet. NOTE: Be careful not to let the meter tube drop in the next step. It will come loose. 2. Unscrew the rate valve bonnet using pliers (carefully and using a cloth to protect the part). The rate valve sleeve should also be removed. 3. Replace the OA-VIT-008 O-Rings on the rate valve stem by separating the valve bonnet and sleeve. 4. Lubricate the new O-Rings lightly with Fluorolube grease before replacing the sleeve, bonnet and rate valve. Cleaning The Glass Meter Tube: 1. Remember to be careful not to lose the stops or ball in the following steps. 2. Remove the white stops at either end of the tube (you could use a paper clip). 3. Soak the tube in warm water with a cleaner like Lime-Away or muriatic acid. Also, brush the inside of the tube with a pipe cleaner. NOTE: Always follow safety precautions with muriatic acid and other chemicals. 4. Dry the meter tube and reinstall the ball and stops. 5. It is recommended that new meter tube gaskets be used when reinstalling the tube. 6. Reinstall the meter gaskets and meter tube, making sure to center the tube on the top and bottom meter gaskets. 7. Tighten the rate valve bonnet with reasonable force to make a seal. Do not use excessive force.

Item# Qty. Part # Description Item# Qty. Part # Description 1 1 OA-VIT-014 O-Ring * 14 1 KFA-300 Filter Holder 2 1 VRA-104 Pin guide 15 1 VRA-5015 Filter * 3 1 VRA-600 Guide Pin 16 1 YMA-100A Inlet Valve 4 1 OA-VIT-006 O-Ring * 17 1 YPA-101A Inlet Valve Seat * 5 1 DPA-103 Double Diaphragm * 18 1 OA-VIT-010 O-Ring * 6 1 FBA-600 Front Body 19 1 SPA-104 Inlet Spring 7 1 OA-VIT-156 O-Ring 20 1 VRA-601A Spring Retainer 8 1 BBA-600 Back Body 21 1 OA-VIT-009 O-Ring * 9 1 OA-VIT-332 O-Ring 22 1 VRA-56A Rear Diaphragm Plate 10 4 BTA-123 Body Screws (Monel) 23 1 OA-VIT-029 O-Ring * 11 1 OA-VIT-214 O-Ring * 24 1 VRA-269 Front Diaphragm Plate 12 1 YMA-605A Back Plate 25 1 SPA-100 Vent Spring 13 1 SAWS-US3 Seal Adapter 26 2 TCA-64 ¼ NPT x 3/8 tube connector * Notes: * - These parts are included in the Parts - Maintenance Kit KT6-10C Date: Feb 2016 Drawing: VR6

Item# Qty. Part # Description Item# Qty. Part # Description 1 1 RVA-402 Knob 6 1 MTA-108-XXX Meter Tube 004 / 010 / 025 / 050 / 100 = PPD 2 1 RVA-349 Rate Valve Bonnet 7 2 MGA-X Meter Gasket 1 / 2 / 3 10, 25, 100 PPD 3 1 MPA-447 Meter Body 8 2 OA-VIT-112 O-Ring 4 2 TCA-64 Tubing Connector 9 2 OA-VIT-008 O-Ring 5 1 RVA-351 Sleeve 25 PPD & below 10 1 RVA-418 Stem 25 PPD & below or RVA-350 Sleeve 50 & 100 PPD or RVA-665 Stem 50 & 100 PPD Notes: Vacuum Tube Connector supplied for 3/8 tubing. Tap size is ¼ NPT. Date: Feb 2016 Drawing Number: MPA-6