Part I - Dispersal Probability

Similar documents
Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Gas Sampling in the DST

LCLS Heavy Met Outgassing Tests * K. I. Kishiyama, D. M. Behne Lawrence Livermore National Laboratory

Operating the LCLS gas attenuator and gas detector system with apertures of 6 mm diameter

INTEGRITY MANAGEMENT OF STRESS CORROSION CRACKING IN GAS PIPELINE HIGH CONSEQUENCE AREAS

DISCLAIMER. Government. Neither the United States Government nor any agency thereof, nor any of their

Regulatory Concerns for Leakage Testing of Packagings with Three 0-Ring Closure Seals

~ goss7-- OSTI RECEIVED LEAKAGE TESTING OF PACKAGINGS WITH THREE-O-RING CLOSURE SEALS. c=t) SUMMARY INTRODUCTION

SAFETY PLAN REVIEW. FirstElement Safety Plan Review Submission for the California Energy Commission General Funding Opportunity GFO

Safety manual for Fisher GX Control Valve and Actuator

Advanced LOPA Topics

DeZURIK. KGC Cast Knife Gate Valve. Safety Manual

This manual provides necessary requirements for meeting the IEC or IEC functional safety standards.

Every things under control High-Integrity Pressure Protection System (HIPPS)

Liquid Abrasive Pressure Pot Scoping Tests Report

DeZURIK. KSV Knife Gate Valve. Safety Manual

SAFETY PLAN REVIEW ITM

st Symposium of Northeastern Accelerator Personnel A TIMESHARED FORELINE AND ROUGHING VACUUM SYSTEM. Oak Ridge, TN

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

PROCEDURE. April 20, TOP dated 11/1/88

HIGH SPATIAL RESOLUTION NEUTRON IMAGING OF INERTIAL FUSION TARGET PLASMAS USING BUBBLE DETECTORS

DeZURIK Double Block & Bleed (DBB) Knife Gate Valve Safety Manual

TRI LOK SAFETY MANUAL TRI LOK TRIPLE OFFSET BUTTERFLY VALVE. The High Performance Company

Technical Specifications of Hydrogen Isotope Handling and Recovery System

Section 1: Multiple Choice

Introduction to Emergency Response & Contingency Planning

IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning)

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Gerald D. Anderson. Education Technical Specialist

Optimizing Compressed Air Storage for Energy Efficiency

QUARTERLY REPORT NO. 3 DE-FG22-94PC /01/95

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

RESILIENT SEATED BUTTERFLY VALVES FUNCTIONAL SAFETY MANUAL

Section 1: Multiple Choice Explained EXAMPLE

Using LOPA for Other Applications

Quantitative Risk Analysis (QRA)

Module No. # 01 Lecture No. # 6.2 HAZOP (continued)

Impact on People. A minor injury with no permanent health damage

User-Calibration of Mettler AT200 Analytical Balance

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

DETAILS OF THE ACCIDENT PROGRESSION IN 1F1

A study on the relation between safety analysis process and system engineering process of train control system

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment

MAHB. INSPECTION Process Hazard Analysis

Lecture 04 ( ) Hazard Analysis. Systeme hoher Qualität und Sicherheit Universität Bremen WS 2015/2016

(C) Anton Setzer 2003 (except for pictures) A2. Hazard Analysis

Sizing, Selection, and Installation of Pressure-relieving Devices in Refineries

Impact of imperfect sealing on the flow measurement of natural gas by orifice plates

FP15 Interface Valve. SIL Safety Manual. SIL SM.018 Rev 1. Compiled By : G. Elliott, Date: 30/10/2017. Innovative and Reliable Valve & Pump Solutions

CFD SIMULATIONS OF GAS DISPERSION IN VENTILATED ROOMS

Eutectic Plug Valve. SIL Safety Manual. SIL SM.015 Rev 0. Compiled By : G. Elliott, Date: 19/10/2016. Innovative and Reliable Valve & Pump Solutions

Review and Assessment of Engineering Factors

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

EL-O-Matic E and P Series Pneumatic Actuator SIL Safety Manual

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

Pressure Gauge Failure Causes Release

Automatic Valve Proving Control

Ultima. X Series Gas Monitor

Critical Systems Validation

L&T Valves Limited SAFETY INTEGRITY LEVEL (SIL) VERIFICATION FOR HIGH INTEGRITY PRESSURE PROTECTION SYSTEM (HIPPS) Report No.

HYDROGEN STANDARDIZATION INTERIM REPORT For

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

HIGH WIND PRA DEVELOPMENT AND LESSONS LEARNED FROM IMPLEMENTATION Artur Mironenko and Nicholas Lovelace

Peter Swift Sandia National Laboratories, P.O. Box 5800, Albuquerque, NM Nancy Brodsky

These Terms and conditions apply to audit trails incorporated in weighing and measuring devices and systems 1.

&lliedsignal AEROSPACE. Lubricant Replacement in Rolling Element Bearings for Weapon Surety Devices. Federal Manufacturing & Technologies

September 2018 Pressure Test

Valve Communication Solutions. Safety instrumented systems

Verification Of Calibration for Direct-Reading Portable Gas Monitors

LOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/12

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

Why do I need dual channel safety? Pete Archer - Product Specialist June 2018

Operator Exposed to Chlorine Gas

Section 1.3: PRESSURE VESSEL COMPONENTS AND SYSTEMS AND COMPRESSED GAS CYLINDERS

Safety-Critical Systems

Raw Material Spill. Lessons Learned. Volume 05 Issue USW

Pneumatic QEV. SIL Safety Manual SIL SM Compiled By : G. Elliott, Date: 8/19/2015. Innovative and Reliable Valve & Pump Solutions

Solenoid Valves used in Safety Instrumented Systems

The Future of Hydraulic Control in Water-Systems

Workshop Functional Safety

SPR - Pneumatic Spool Valve

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

ENS-200 Energy saving trainer

Hydraulic (Subsea) Shuttle Valves

The Estimation Of Compressor Performance Using A Theoretical Analysis Of The Gas Flow Through the Muffler Combined With Valve Motion

Smart Water Application Technologies (SWAT)

FUNDAMENTAL PRINCIPLES OF SELF-OPERATED PRESSURE REDUCING REGULATORS. John R. Anderson Emerson Process Management Fluid Controls Institute

Safety Analysis: Event Classification

Bespoke Hydraulic Manifold Assembly

DRAFT REGULATORY GUIDE DG-1074

Risks Associated with Caissons on Ageing Offshore Facilities

36 th Gas-Lift Workshop. Reverse Flow Check Valve Reliability and Performance Testing of Gas Lift Barrier Check Valves

Hydro Plant Risk Assessment Guide

Incorrect Relief Valve Material Causes Release

DESIGN DATA. Dry 105a. September 5, 2008

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Solenoid Valves For Gas Service FP02G & FP05G

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment

ACV-10 Automatic Control Valve

Transcription:

UCRLJC118795 PREPRINT t Risk from a Compressed Toxic Gas System: Part I Dispersal Probability Thomas J. Altenbach Sandra J. Brereton 8 This aper was prepared for submittal to the A ME Pressure and Piping Conference Honolulu, Hawaii July 2327,1995 February 13,1995 I Thisisapreprintofapaperintendedforpublicationin a journalorprofeedigs Since changes may be made before publication, this preprint is made available with the understanding that it will not be cited or reproduced without the permissionof the author. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof..

DISCLAIMER This document was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the University of California nor any of their employees, makes any warranty. express or implied. or assumes any legal liabdity or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial products, process. or service by trade name, trademark. manufacturer. or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or the University of California. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or the University of California, and shall not be used for advertising or product endorsement purposes.

DECLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

ASME Pressure Vessels and piping Conference Risk and Safety Assessments Sessions July 2327, 1995, Honolulu, Hawaii Risk from a Compressed Toxic Gas System: Part I Dispersal Probability by Thomas J. Altenbach Risk Assessment and Nuclear Engineering Group Applied Research Engineering Division Fission Energy and System Safety Program and I Sandra J. Brereton Hazards Control Department Lawrence Livermore National Laboratory University of California 7 East Ave., P.O. Box 88, Livermore, CA 9455 L196 Phone 514221285, Fax 514245489 ABSTRACT At the Lawrence Livermore National Laboratory, we have prepared a Safety Analysis Report for the Department of Energy on our Building 332 Plutonium Handling Facility. This SAR includes an analysis of potential accident scenarios which could lead to offsite consequences to the public having not only radiological exposures, but also exposures to toxic gases such as chlorine. This paper presents a risk analysis of pressurized chlorine gas system proposed for use at Building 332. The focus of the analysis is to calculate the predicted frequency of an unmitigated leak of chlorine from the system which could result in the dispersal of the entire contents of the gas cyleder to the environment. Modeled are postulated valve leaks or pipe ruptures occurring anywhere in the distribution system, as well as the potential failure of leak mitigation. The fundamental credibility of this type of accident is established. The importance of a reliable leak mitigation system is demonstrated, and the dependence of the results on less than optimal data is discussed in the context of uncertainty and sensitivity analyses. Work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract W745Eng48.

EXECUTIVE SUMMARY Compressed toxic gas systems are widely used throughout industrial and research facilities, in both the private and government sectors. Though the use of gasses such as chlorine is well accepted by the public, the risks of their use are not well understood and often ignored until a major leak or accident occurs. At the Lawrence Livermore National Laboratory, we have prepared a Safety Analysis Report (SAR) for the Department of Energy on our Building 332 Plutonium Handling Facility. This SAR includes an analysis of potential accident scenarios which could lead to offsite consequences to the public having not only radiological exposures, but also exposures to toxic gases such as chlorine. This paper presents a risk analysis of compressed chlorine gas system proposed for use at Building 332. The focus of the analysis is to calculate the predicted frequency of an unmitigated leak of chlorine from the system which could result in the dispersal of the entire contents of the gas cylinder to the environment. Modeled are postulated valve leaks or pipe ruptures anywhere in the system from the gas cylinder stored outside the building, through various valve and piping sections, ending at the laboratory inside the building. Also modeled is potential failure of leak mitigation, composed of a gas sensorkinside the gas cabinet, remote alarm in the control room, and human intervention to control the leak. The leaks are assumed to be initiated by the random failure of the components. The analysis does not include potential leaks occurring during bottle changeover procedures due to human errors such as cylinder mishandling, or natural phenomena initiators such as earthquakes. The predicted leak frequency is calculated via a computerized fault tree analysis, and evaluated with published industrial component and human error failure rate data. Since the system is only operational during normal working hours, the total leak frequency is found by summing separate calculations for normal and offnormal hours.

During offnormal hours, the system is in a standby mode, dependeht upon daily human action to effect that lowerrisk state. Several cases are calculated to illustrate the sensitivity of the model to changes in data and to demonstrate reduced risk through potential changes in operational procedures. For each case, the fault tree is solved for the minimal cut sets and the mincut upper bound. Then an importance analysis and an uncertainty analysis is presented. Several conclusions are evident. The fundamental credibility of this type of accident is established, with implications for toxic gas systems throughout the Laboratory and DOE complex. The importance of a reliable leak mitigation system is demonstrated, and the dependence of the results on less than optimal data is discussed in the context of the uncertainty and sensitivity analyses. This paper presents the first part of series of two papers on this topic. In order to complete the risk analysis, the second paper discusses the consequence calculations done for chlorine releases at the site. Then the appropriate regulations and dose guidelines are presented, as well as comparison with potential hazards and the standards set for a nearby water treatment plant also using chlorine. 111 SY~TEM DESCRIPTION The proposed compressed chlorine gas system is shown in Fig. 1. It is composed of a gas cabinet located outside the building, with piping and monitoring signals extending inside the building. A single gas cylinder with manual shutoff valve is placed inside the gas cabinet. This is connected by a 1inch pipe to a solenoidoperated excess flow valve. Downstream of the flow valve, a 4inch pipe connects to the emergency shutoff valve. The chlorine is then distributed through an 8foot pipe which exits the cabinet, and continues with 1 1foot pipe terminating inside the building. The excess flow valve is selfactuated to shut off when it detects flow above the set point.

The emergency valve shuts off automatically upon either detection of excess flow by the flow sensor or detection of a gas release inside the cabinet by the gas sensor located there. The gas sensor also sends a signal to the control room triggering an alarm. The system is operational during working hours only. At the end of each day, an operator manually closes the main cyiinder valve. IV MODEL ASSUMPTIONS The purpose of the analysis is to estimate the frequency of unmitigated leaks of chlorine during normal operation, including standby conditions. This model does not include leaks incurred during bottle changeover operations, which would require a separate human factors analysis. An unmitigated leak is defined as a leak which has the potential to release a significant quantity of chlorine, up to the entire inventory at the maximum theoretical rate. They are assumed to originate from either external valve or cylinder leaks, or rupture of piping sections. It is assumed that leaks have a small enough flow that they can be mitigated through emergency operator response. Therefore failure of leak mitigation is also modeled. This includes the gas sensor, control room alarm, and human action. If leak detection fails, the leak is assumed to develop into a major failure &e. "leakbeforebreak" is assumed). It is also assumed * that pipe rbptures can only be mitigated by automatic actuation of those valves located upstream of the rupture. Therefore, failure of the appropriate valves to close on demand is also modeled. Failure of the operator to shut off the system at the end of each day is included as a basic event. The working hours are taken to be 5 dayslweek at 1 hours/day (to be conservative), less 1 holidays/year, which comes to 25 houdyear. Off hours are then 626 hours/year. V FAULT TREE CONSTRUCTION

A fault tree was developed using the IRRAS computer code (Russell, et a1.,1992). The highlevel fault tree [Fig. 21 has three branches from the OR Gate leading to the top event. The branches represent: 1) leaks in the cylinder/manual valve unit which is always at risk; 2) leaks in the distribution system during working hours (downstream of the manual valve); and 3) leaks in the distribution system during off hours, which include the human error of failing to close the manual valve [Fig. 31. In Figure 3, the developed paths include a rupture of the piping upstream of the flow valve, a leak at the flow valve, a rupture of the piping connecting the flow and emergency valves, a leak at the emergency valve, a rupture of the piping downstream of the emergency valve and inside the cabinet, and a rupture of the piping outside the cabinet. Failure of leak mitigation [also Fig. 21 is developed as a subtree and appears as an input to an AND Gate along with each valve or cylinder leak event. The fault tree for distribution system leaks during working hours is not shown, however it has a similar structure to Figure 3. The only difference is that the upper OR gate now becomes the top event, since the human error failing to close the manual valve is not applicable, and the top AND gate is therefore deleted. VI QUANTIFICATION Thk fault tree was quantified with data from the Savannah River Data Base (Blanton and Eide,1993, and Benhardt, et al., 1994). Table 1 lists the basic events as they appear on the fault tree, along with the baseline values used and the source. Values for pipe ruptures and valve leaks are given in units of eventdyear, and must be mulitiplied by the appropriate ratio to represent either working or off hours to get the values used in each fault tree. The fault tree was solved for the minimal cut sets and mincut upper bound. The top four of the 27 total cut sets contribute approximately 98% of the mincut upper bound. These cut sets are: 1) cylinder leak AND alarm failure (57%); 2) cylinder leak

AND gas sensor failure (19%); 3) flow valve leak during working hours AND alarm failure (16%); 4) flow valve leak during working hours AND gas sensor failure (5%). The mincut upper bound is 2.~14 /year. An importance calculation ranked the top 4 basic events according to both the FussellVesely equation and the Risk Reduction Ratio as: 1) cylinder leak; 2) alarm failure; 3) gas sensor failure; 4) flow valve leak during working hours. Undetected leaks from the cylinder/manuai valve clearly dominate the system failure frequency for the base case. These leaks contribute 77.6% of the mincut upper bound. Leaks or ruptures in the distribution system during working hours contribute 22.3% to the mincut upper bound, while offhours leaks or ruptures contribute only.3%. However, since the cylinder leak risk is spread over the entire time, the predicted frequency of offhours leaks from all sources is actually higher than the workinghours rate, contributing 55.5% and 44.5% respectively to the mincut upper bound. VI1 SENSITIVITY AND UNCERTAINTY Three additional cases were run in order to conduct a sensitivity study on some parameters of interest. For the base case, it was assumed that the chlorine monitoring system wa tested annually, therefore a mean time to failure of 6 months was applied to the failure rates from the data base. Since these components, the gas sensor and alarm, are highly ranked in the importance calculation, it is interesting to study the effects of a more frequent inspection schedule. A calculation was done using a monthly inspection period, which implies a mean time to failure of.5 months for the gas sensor and alarm, a factor of 12 smaller than the base case. This results in a mincut upper bound estimate of ~. O X ~ O/year, ~ or a factor of 1 decrease in the system failure rate. However, the alarm and gas sensor still remain ranked in the top 4 most important basic events.

The next case studies the effects introduced by assumptions made in development of the data base. In Blanton and Eide (1993), it is noted that the values listed for compressed gas systems are "based on comparisons of (limited) compressed gas system data for component groups with the much more extensive water system data." The failure rates used for pipe ruptures and cylinder leaks were taken from water system results and multiplied by 1. Similarly, the failure rates for valve leaks were taken from water system results and multiplied by 3. Since no justification is presented in Blanton and Eide (1993) for these factors, we ran a calculation removing these multipliers from the water system data. With the leak and rupture failure rates reduced as described, the mincut upper bound result is 3.1~15 /year. The final case combined the changes from the two previous cases, giving the most optimistic view of system failure by using the lower failure rates for water system data and the monthly inspection for the monitoring system. This results in a mincut upper bound of 3.~16 /year. A Latin Hypercube uncertainty calculation was performed for all four cases. A lognormal probability distribution was assumed for all basic events, with error factors taken from the data bases. Pipe ruptures have an error factor of 3., sensors have an error factor of 3., and the remainder of the basic events all use 1. Table 2 summarize% the results of the uncertainty calculations based on 1, runs for each case, and Figure 4 plots the frequency distributions.

Basic Event Name / Description ALARMFAILS / Toxic gas alarm fails to annunciate in control room. Value 1.3x1l CONNECTPIPEBRK / Rupture in piping between valves. EMERGVALVEFAIL / Emergency solenoidoperated shutoff VdVe fails to close upon demand. EMERGVALVELEAK / Emergency solenoidoperated shutoff valve leakage (external). FLOWSENSORFAIL / Flow sensor fails to detect leak. 2.9~15 per year 3.~13 per demand FLOWVALVEFAILS / Solenoidoperated flow valve fails to close upon 3.~13 Der demand FLOWVALVELEAK / Solenoidoperated flow valve leakage (external) GASSENSORFAILS / Chlorine gas sensor fails to detect leak or rupture inside cabinet. HUMANRESPONSE / Control room operator fails to respond to toxic gas alarm. : INSIDEPIPEBRK / Piping rupture downstream of valves and inside cabinet. MANVALVEOPEN / Operator fails to close manual valve at end of day OUTSIDEPIPEBRK / Piping rupture downstream of valves and outside cabinet TANKLEAK / Pressurized chlorine cylinder leakage (external) UPSTREAMPIPE / Piping rupture upstream of both valves. 1 Data Source / Justification Ref. 2 page 41, 3.x15/hr * 876 / 2, assuming yearly inspection, take mean time to leak as.5 year. Ref. 2 page 31 l.oxlog/hrft * 876hr/year * 4 in. length Ref. 2 page 3 8.8~14 Per Year Ref. 2 page 3, l.o~lo~/hr * 876 hr/year 1.3~12 Ref. 2 page 41 3.x1 6/hr * 876 / 2, assuming yearly inspection. Ref. 2 page 3 Ref. 2 page 3, l. O ~ l O ~ / h r * 876 hr/year Ref. 2 page 41 1.x15/hr 4.4~12 * 876 / 2, assuming yearly inspection, take mean time to leak as.5 year. 3 ~ ~ 1 3 Ref.3 p. 13, failure to respond to compelling signal assuming few competing 8.8~14 per year Ref. 2 page 31 l.oxlog/hrft * 876 hr/year * 8 ft length Ref. 3 page 31, failure to lockout, typical lockout plan 9. 6 ~ 1 ~ Ref. 2 page 31 l.o~lo~/hrft * 876hr/yr * 11 ft length per year 8. 8 ~ 1 ~ Ref. 2 page 32 1.~1~/hr per year * 876 hrryear Ref. 2 p.31 l,oxlog/hrft * 7.3~17 876 hr/year * 1 inch length. per year 7.~15 per year 5.~14

CASE Monthly Inspections 95% 6.88~ 14 7.5~15 Water system data Combined study 9. 9 5 15 ~ 1. 9 15 ~ Base VI11 MEAN 1.85~1~ 2.1~15 2. 7 4 ~15 3. 9 16 ~ MEDIAN 6.4~ 15 6.7 l x 16 9. 9 3 1~6 1. 6 1~6 5% 6. 8 8 16 ~ 8. 3 8 1~7 1.22x 16 1. 4 3 17 ~ CONCLUSIONS We estimated the frequency of a significant release of chlorine from postulated hardware failures and human errors involved in the normal operation of the system during both working hours and in standby condition during offhours. The basic credibility of this type of accident was established to be on the order of per year. Reliability improvements in the monitoring system are easily achievable which would bring this frequency down by an order of magnitude. These estimates are conservative, in that they are based on data which has been conservatively extrapolated from water systems. However, the total risk of a chlorine release at the facility must also account for human errors in bottle changeover procedures, which has not been addressed in this study. IX REFERENCES 1. ftntegrated Reliabilitv and Risk Analvsis Svstem (TRRAS) Version 4., K. D. Russell, et al., NUREGKR5813 EGG2664, January 1992. 2. Savannah River Site Generic Data Base DeveloDment, C. H. Blanton and S. A. Eide, WSRCTR93262, June 1993. 3. Savannah River Site Human Error Data Base DeveloDment for Nonreactor Nuclear Facilities, H. C. Benhardt, et al., WSRCTR93581, February 1994.

Figure I. Toxic Gas System Schematic Used for Fault Tree Analysis rr 8ft piping length \ inside cabinet Toxic Gas Sensor IOft piping length outside of cabinet to labs To control room alarm Manual Valve + Gas Cabinet

U r e: r

Q) b (D m d.. N.\ ' cv m u! u!? 7 9 c d 9 u! 9 In (9 r a3 u! c u! c u! u!? ( i A lad] A~3uanbai~ 9?. i