LIQUID METER PROVING TECHNIQUES CT 4095

Similar documents
Validation of Custody Transfer Metering Skid at Site After Laboratory Proving

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Accurate Measurement Guidelines

ONSITE PROVING OF GAS METERS. Daniel J. Rudroff WFMS Inc West Bellfort Sugar Land, Texas. Introduction

Truck-mounted Mass Flow Metering for LPG Delivery

Sizing Pulsation Dampeners Is Critical to Effectiveness

Installation and User Manual

INSTRUCTION MANUAL. CVS P37 LP Gas Reducing Regulator

Type , , S2.20 Specialized test procedure Procedure for testing LPG bulk meters using a vapour displacement prover

Manual of Petroleum Measurement Standards Chapter 6 Metering Assemblies Section 3A Pipeline and Marine

Constant Pressure Inlet (CCN) Operator Manual

ONSITE PROVING OF GAS TURBINE METERS Daniel J. Rudroff Invensys Metering Systems

Precision Liquid Settlement Array Manual

Gerald D. Anderson. Education Technical Specialist

LPG DRIVER ATTENDED TRANSPORT LOADING

INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE

NMISA NEW GAS FLOW CALIBRATION FACILITY. Deona Jonker 7 October 2013

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

Vehicle- or rack-mounted liquefied gas meters, pump supplied

GM Series Dual-Block Multi-Function Gas Control Valves

Cover Page for Lab Report Group Portion. Pump Performance

Glass tube flowmeters Series 2000

Vehicle-mounted meters, pump supplied

Best Practice Guide, Servomex 2700

Cover Page for Lab Report Group Portion. Head Losses in Pipes

The ERCB Directive 017 Overview

ProSoft Technology, Inc. Summary Regarding Alberta Energy and Utilities Board Directive 017 of May 2007

Powers Controls D Day-Night Thermostats

RCD - Ultra-Rugged Differential Pressure Flowmeter

DEVICES FOR FIELD DETERMINATION OF WATER VAPOR IN NATURAL GAS Betsy Murphy MNM Enterprises 801 N. Riverside Drive Fort Worth, Texas 76111

Installing a Probe. Typical Installation

Generating Calibration Gas Standards

CORESTA RECOMMENDED METHOD N 6

Oil and Gas Custody Transfer

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module:

Gas Measurement Fundamentals Certification. Curriculum

SECTION PRESSURE TESTING OF PIPING

Pneumatic Powered - Plunger Pumps

Glass tube flowmeters Series 2000 Variable area flowmeter for low flows of liquids and gases

"INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives" Project

Level MEASUREMENT 1/2016

Cold-acclimatised pipelines

TGD-L (LP) Tank Gauging Device TGD L (Level) TGD LP (Level Pressure) Main features:

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER

New! ProFlow. Sliding Vane Meters DN (½ - 2 ) _ 142. Product Bulletin

AMT-Ex Dewpoint Transmitter

Micro Motion 3098 Gas Specific Gravity Meter

Coriolis Mass Flow Meter

VS Series Leak Detectors for Vacuum Furnaces LEAK DETECTION FOR VACUUM FURNACES

TEST SPECIFICATION NYT-909-C

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

Orifice Plate Flow Meter

Improving distillation tower operation

MIL-STD-883G METHOD

Operational experiences with the EuroLoop Liquid Hydrocarbon Flow Facility

Developments on Flow Rate And High Pressure Stability of Peroxide Dosing Pumps For The Chemical Industry

Gas Flow Calibration Basics

Torque Tube TB300 Digital Transmitters

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Significant Change to Dairy Heat Treatment Equipment and Systems

Manual of Petroleum Measurement Standards Chapter 4.9.1

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Acoustical Modeling of Reciprocating Compressors With Stepless Valve Unloaders

Succeeding with Production Air Leak Testing Methods. Paul Chamberlain President, CEO

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Field Testing of an Automated Well Tester in a Heavy Oil Application. Rafael Bastardo, Weatherford José Scoglio, Petrozuata Asher Imam,, Weatherford

Tube rupture in a natural gas heater

Pressure and Vacuum Switches for Process Applications

628 Differential Pressure Decay Leak Tester

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller.

PRACTICAL TIPS FOR TRACE-LEVEL OXYGEN MONITORING WITH ELECTRO-CHEMICAL SENSORS

FAQs about Directive 017

Float Operated Level Controllers

INSTALLATION OPERATION MAINTENANCE

Turbine Flowmeters for Gas Applications

Micro Motion 7812 Fiscal Gas Density Meter

Integral type Differential pressure flowmeter VNT Series

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

CHAPTER 3 RESULTS AND DISCUSSION

FUNDAMENTALS OF DIAPHRAGM DISPLACEMENT METERS. Julie Ellington. Itron, Inc. Utility Measurement

OxyCheq Expedition-X Oxygen Analyzer. Operator s Manual

Chapter Pipette service & maintenance. Pipette specifications according to ISO Repair in the lab or return for service?

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results.

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

MODEL HICV-130Ti7-331N. Lot NAGOYA JAPAN PAT.

1800CPB2 Service Regulators

Sartorius CCL kg Prototype Mass Comparator

CRYOGENIC PRESSURE REGULATOR

CALIBRATION SYSTEM REQUIREMENTS. ESCC Basic Specification No

White Paper. Chemical Sensor vs NDIR - Overview: NDIR Technology:

abc OPERATING, INSTALLATION & MAINTENANCE MANUAL FOR G6 GAS SAMPLER

OIL AND GAS INDUSTRY

Model 1800 PFM Series Regulator For Constant Outlet Pressure Precise Fixed Factor Measurement From 0.5 to 30 PSIG

Declining Weight Blending System Quick Start Manual E Main St Marshall, IL Phone: Fax: Website:

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

Transcription:

LIQUID METER PROVING TECHNIQUES CT 4095 J. H. (Harry) James Gibson Energy Ltd. 1700, 440-2 nd Avenue S.W. Calgary, Alberta Canada, T2P 5E9 BACKGROUND Producers and shippers are becoming more and more aware of the importance of accurate measurement. Their bottom line depends on it. As a result, measurement accuracy is being scrutinized more vigorously than in the past. Companies are being required to Verify their metering accuracy. Therefore it is essential that all procedures and auxiliary equipment be operated in a defendable manner. In addition, meters are not always in clean product service and could be subject to severe wear. Even meters in clean service will experience wear over time. To ensure meters give accurate results requires regular precision calibration by a prover operated by a competent individual. Meter proving is the means by which meters are calibrated to provide a factor that can be applied to the metered output that will result in a recorded volume that can be traced back to a regulated standard. This is accomplished by passing an identical volume of liquid through both the meter and the prover. The prover is precisely calibrated using regulated standards. LIQUID METER PROVERS There are a number of devices that can be used for proving of meters, however, in continuous service and for proving on-line there are basically two types of provers that are commonly employed. 1. Pipe Provers i. Uni-directionnel ii. Bi-directional 2. Small Volume. Note: Small Volume provers are sometime called Ballistic or Double Pulse Chronometry provers. These provers can be fixed or portable and are manufactured in various sizes according to requirements. The small volume prover is essentially a uni-directional prover with a significantly reduced volume that employs high speed clocking technology to provide equivalent or better calibration resolution than standard pipe provers. PLANNING AHEAD Because there are a number of details that can affect the accuracy and precision of the proving, it is essential that a systematic procedure be in place.

Parameters such as temperature, pressure, density flow rate meter wear etc. do not remain constant from proving to proving. As a result, meter factors can and usually will change from proving to proving. Before proving the following should be determined: - Is the flow rate within the design range of the meter? - Is the prover suitable for the flow rate and pressure? - Are the prover seals, o-rings etc. compatible with the product? - Are all prover temperature and pressure devices current in their calibration? - Is the prover certification current? If the above list of items is not in order, don t waste your time trying to prove the meter. Get these items in order before you attempt to prove. It is also a good idea to ensure that all parties agree what criteria are going to be used in the proving before you begin. PRE PROVING ASSESSMENT Once we know the meter and prover are suitable for the product and flow rate, the prover can be connected to the meter. Once connected, the pre-proving assessment can start. The following items should be checked: 1. Is the flow rate constant? The flow rate should be adjusted to the same as the operating flow rate of the meter. 2. Check divert valve for sealing integrity 3. Check all block & bleed valves to ensure there are no leaks or by-pass. 4. Check all flanges and fittings on the prover for evidence of leakage 5. Ensure all temperature and pressure devices are operational. 6. Operate the divert valve to verify operation. 7. Identify where the prover ball/displacer is. 8. Cycle the prover several times ensuring the ball enters the launch tube before reversing the flow. This helps stabilize the temperature and removes the product from a previous proving. 9. Check wiring connections to ensure they are secure and will not vibrate loose during operation. 10. Check operation of switches and triggering of the prover counter. 11. Record position of the ball or displacer. 12. Operate the pulse check on the prover counter to ensure it is counting all pulses. 13. Record prover data on the proving report.

OPERATING THE PROVER (Bi-directional) 1. Launch the ball and compute the flow rate on the first pass. 2. Record the inlet and outlet temperatures and pressures. 3. Obtain a sample of the product being sampled and determine its density/specific gravity/api Gravity as required. 4. When the ball has passed the second prover switch, record the number of pulses on the prover counter. 5. Check the Temperatures and Pressures to ensure they have remained stable. 6. After the ball has entered the launch chamber, reverse the divert valve to launch the ball in the reverse direction. 7. When the Ball has completed the reverse pass and the counter has stopped counting, record the roundtrip total. 8. Reset the prover counter. 9. Repeat the sequence, recording the inlet and outlet temperature and pressure for each round trip. 10. The sequence should be repeated until the required number of runs within the required tolerance is achieved. OPERATING THE PROVER (Uni-directional) 1. Launch the ball/displacer and compute the flow rate on the first pass. 2. Record the inlet and outlet temperatures and pressures. 3. Obtain a sample of the product being sampled and determine its density/specific gravity/api Gravity as required. 4. When the ball/displacer has passed the second prover switch, record the number of pulses on the prover counter. 5. Check the Temperatures and Pressures to ensure they have remained stable. 6. Reset the prover counter. 7. Repeat the sequence, recording the inlet and outlet temperature and pressure for each round trip. 8. The sequence should be repeated until the required number of runs within the required tolerance is achieved. Once all the data has been collected it must be recorded on a prover report. The repeatability should be checked to ensure it meets acceptable tolerance. The meter factor or K-Factor should then be computed and recorded. All extraneous information obtained during the proving such as ambient temperature, time of day, clouds, humidity etc. should be recorded on the report even if it seems trivial Once the report is completed, all interested persons witnessing the proving should sign the Proving Report.

THINGS TO WATCH FOR There are a number of things that can affect the results of an otherwise acceptable proving. 1. If the number of counts shows a continuous decline from run to run and the repeatability is still in the acceptable range, it is likely that the temperature of the steel in the prover has not yet stabilized. The same applies to a continuous rise in counts. This is particularly critical to a Small Volume Prover. 2. If there is trapped air in the prover, this can affect the ability of the prover to yield repeatability. 3. If the pressure of the system is not above the equilibrium vapour pressure of the liquid, repeatability will be hard to achieve. The pressure of the system should be at least 125% of the equilibrium vapour pressure. 4. If the sphere is not symmetrical, repeatability will be hard to achieve. 5. In a bi-directional prover, if the ball is not allowed to travel all the way to the next launch/receive chamber before reversing the direction of the flow, the temperature in the prover can be different than the inlet or outlet temperature. 6. Has the flowrate remained constant? If not repeatability could be hard to achieve and a meter factor within 0.25% of the previous proving could be hard to achieve. 7. If the temperature or pressure is not stable, it is difficult to determine which correction factors to apply. 8. Inconsistent density and viscosity can affect repeatability. 9. If information revealed during a proving is not recorded, IT DIDN T HAPPEN. Ensure all pertinent information is recorded when it happens. Memories become fuzzy with time. If repeatability cannot be attained, the above list of items should be investigated and problems corrected before trying to reprove. NOTE: Temperature correction sensitivity is not fully appreciated by inexperienced measurement personnel. A simple set of rules of thumb is: For normal crudes 825 kg/m3 (40 deg. API) - 0.1 % per degree C. - 0.056 % per degree F. For condensates 700 kg/m3 (70 deg. API) - 0.2 % per degree C. - 0.11 % per degree F. For NGL s 575 kg/m3-0.3% per degree C. - 0.17% per degree F. These are only approximations that show the relative sensitivity of temperature correction factors for different densities.

COMMONLY ACCEPTED PRACTICES Most companies have published Rules and Regulations that state the acceptable procedures, number of runs, repeatability etc. Some commonly accepted criteria for number of runs and repeatability are: - 5 runs with 0.05% repeatability - 10 runs with 0.10% repeatability - 15 runs with 0.17% repeatability Commonly accepted criteria for rejection of a meter are: - Inability to achieve acceptable repeatability. - Failure to achieve a factor within 0.25% of the previous proving without a defendable reason unless it is a first proving. The acceptability of criteria should be agreed to between interested parties before beginning the proving. CONCLUSIONS Good proving cannot be rushed. Care must be taken to ensure accurate and defendable results are obtained. Effective proving is as much an art as it is a science. Experience will allow a good operator to identify issues before they become problems. Proving requires attention to detail. The results of inattention are typically: - Inability to get a good proving, - Questionable results, - Wasted time, and - Reduced confidence in the prover operator.