AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

NORMAL OPERATING PROCEDURES Operating Parameter Information

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

GAS COMPRESSION SYSTEM

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

INSTALLATION OPERATION MAINTENANCE

Wellhead Safety Valve Control System (Wellhead Control Panel)

SECTION P4 SEPARATION SYSTEMS

O&M MANUAL HIGHLIGHTS

GAS DEHYDRATION SYSTEM

Lockout/Tagout Training Overview. Safety Fest 2013

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is

Veriforce TG CCT 609OP. Training Guide

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

GAS DEHYDRATION SYSTEM

Lockout / Tag out Program

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

Lockout Tagout Policy

Control of Hazardous Energy Lockout / Tagout Program

LOCKOUT SYSTEM AND POLICIES

Hazardous Energy Control (Lockout-Tagout)

LO/TO LOCKOUT/TAGOUT PROGRAM

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Lockout Tagout Program

Safe Work Permits A Safety Advantage

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

SEMS II: BSEE should focus on eliminating human error

Covered Task 614OP Training Guide Purging Pipeline Facilities with Air or Inert Gas

GAS DEHYDRATION SYSTEM

Veriforce TG CCT 661OP. Training Guide

LOCKOUT/TAGOUT PROGRAM

Kelsow Work Instruction. Subsea Well Control Hydraulic Panel Operation

LOCKOUT/TAGOUT PROGRAM

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations

H. Control of Hazardous Energy: Lockout/Tag Out

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Control of Hazardous Energy. Environmental Health and Safety

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Control of Hazardous Energy Program (LOTO)

Lock Out/Tag Out Control of Hazardous Energy

CHE Well Testing Package/Service:

HUMAN FACTORS CHECKLIST

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Lockout/Tagout - Control of Hazardous Energy Program

Pressure Regulators. Operating Instructions. Instrumentation

HYDROSTATIC LEAK TEST PROCEDURE

Lockout/Tagout Program

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

230-LOCKOUT/TAGOUT PROGRAM

HEALTH AND SAFETY MANUAL

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

Hazardous Energies Control and Lockout/Tagout Program

WW-720. Pressure Reducing Control Valve

University of Arkansas Office of Environmental Health and Safety

Hazardous Materials Management Guidelines

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Lockout Tagout Program

Temperature Controllers

THE OSHA LOCK-OUT/TAG-OUT STANDARD

THE UNIVERSITY OF NORTH CAROLINA

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

Electrical, electronic and control engineering at the operational level

System Pressure Manager Standard & System Pressure Manager Plus

LOCKOUT/TAGOUT PLAN August 2015

VOC Process Equipment Clearing, Cleaning, and Routine Maintenance. Individual Unit Function: Environmental Procedure No.: PA Page: 1 of 10

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

4m Blanco Glycol Chiller system: history, recent events, present status and plans

Elements of a Lockout/Tagout Program OSHA

Additional requirements for all types of entry are described in Section Determining the Applicable Entry Method

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

PSM TRAINING COURSES. Courses can be conducted in multi-languages

Fisher DVI Desuperheater Venturi Inline

Rhino VE CE Bulk Unloader Operator s Card

Product Information Report Lockout/Tagout Hazardous Energy Control

2 Sentry MCL Installation, Operation & Maintenance

Minimum standard of competence for electro-technical officers (STCW Reg III/6) Electrical, electronic and control engineering at the operational level

WW-720. Pressure Reducing Control Valve

NGP-250/500 Nitrogen Generator Quick Start Guide

EDUCATION DEPARTMENT ACCU-TEST

Safety Engineering - Hazard Identification Techniques - M. Jahoda

TSS21 Sealed Thermostatic Steam Tracer Trap

BS Series Basket Strainer

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

BODY OF KNOWLEDGE TANK ENTRY SUPERVISOR CERTIFICATION PROGRAM Revision 2, October 2013

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

Transcription:

OPERATING PROCEDURES

1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is responsible for the development and implementation of procedures for initial startup, normal operations, temporary operations, bypassing and flagging, simultaneous operations, emergency shutdown, startup after an emergency shutdown and normal shutdown and startup. 2.0 Process Petsec has established its written operating procedures to enhance efficient, safe and environmentally sound operations; human factors were taken into consideration when developing these procedures. The designs of and the equipment placed on most Petsec facilities are similar, so the operating procedures are similar. However, Petsec has generated site-specific operating procedures for each facility that follow the guidelines identified in 30 CFR 250.1913 (Subpart S) and in this element. The Facility PIC assures contractor personnel are trained in the Operating Procedures on his facility; the Foremen and Production Superintendents supervise the Facility PIC during the development, implementation and training processes. This ensures that the interaction between facilities and personnel is effective and efficient. 2.1 Initial Startup If a new facility is constructed or a major renovation is made in the future, a Safety, Pre-Commission and Startup Plan is developed and used for initial startup. This Plan contains all of the steps to safely, efficiently and effectively start up the facility and minimize the health, safety and environmental hazards. During initial startup, the following actions are accomplished (not necessarily in sequence): Vessels and piping are flushed and purged of debris and to avoid explosive mixtures. Vessels are inspected for debris and loose materials. Process safety and control systems are put in service for pressure and atmospheric vessels and other production components. Relief and vent systems are put in service. Process fluids are slowly allowed into vessels and components to pressurize components and/or establish liquid levels. Vessels/components are checked for gas and liquid leaks. Fired components are lit and temperatures established. Compressors are pre-serviced, started and loaded according to the manufacturer s sequence. If applicable, contact upstream and downstream facilities. Flow is slowly established from the well head to the pipeline until fluids are flowing through the production equipment and the components are producing oil, gas and water.

2.2 Normal Operations The production operations personnel on the facility perform these and other day-to-day tasks: 2.2.1 Monitor safe operating limits of production components: pressures, temperatures, flow rates and liquid levels. 2.2.2 Adjust pressures, temperatures, flow rates and/or liquid levels as the operating limits change. 2.2.3 Test production safety system devices according to API RP 14C to ensure operating conditions ranging outside of the established parameters are detected. 2.2.4 Calibrate production sales meters to ensure they are operating effectively and efficiently. 2.2.5 Maintain equipment and safety devices to ensure they are operating according to manufacturers specifications. 2.2.6 Inspect production process and facility equipment to ensure all are in good, working condition. 2.3 Temporary Operations It may be necessary (from time-to-time) to operate under other-than normal conditions; this is referred to as temporary operations and does not involve a shutdown. Examples include flaring gas from oil wells when the compressor goes down, bypassing vessels or components when performing maintenance, unloading wells, using the diesel generator when working on the gas generator, etc. 2.3.1 Generate a JSEA and conduct a safety meeting on project requiring the temporary operations. 2.3.2 Redirect flow or power for the component or equipment affected by temporary operations. 2.3.3 Shut down production component or equipment; lock and tag using proper procedure. 2.3.4 When project complete, start up the production component or equipment and direct flow or power back to re-establish normal operations. 2.4 By-Passing and Flagging Safety devices that are by-passed and flagged for startup, maintenance and testing must be monitored by personnel according to API RP 14C. 2.5 Simultaneous Operations If construction or rig activities are conducted at the same time as production operations are conducted, the Petsec Simultaneous Operations Plan is engaged; refer to this Plan for details.

2.6 Safety and Environmental Consequences Petsec has identified the expected causes and results of each process parameter going outside of its range, along with the steps required to correct or avoid deviations. Refer to the Table of consequences associated with production operations in API RP 14C. Each facility has its own steps to avoid or correct deviations ; refer to Attachment A: Operating Procedures. 2.7 Facility Shutdown Facility shutdowns are either controlled (at the discretion of the operator when maintenance or service of a vessel or component is required) or automatic (system shutdown when a safety device senses an abnormal condition); this guideline deals with a controlled shutdown. 2.7.1 Conduct a safety meeting on project requiring shutdown and review specific shutdown procedure. 2.7.2 Contact upstream and/or downstream facilities that may be affected by shutdown, if applicable. 2.7.3 If necessary, switch to diesel generator using proper procedure to maintain power. 2.7.4 Shut in all wells. 2.7.5 Shut down all incoming flow lines and pipelines. 2.7.6 Shut down compressor. 2.7.7 Isolate all SCSSV. 2.7.8 Shutdown chemical injection. 2.7.9 Control hazardous energy sources (lockout/tagout). 2.7.10 Shutdown specific component(s) to be serviced or maintained. 2.8 Facility Startup Once the project is complete, the facility is started up according to the following guideline: 2.8.1 Contact upstream and/or downstream facilities affected by shutdown. 2.8.2 Ensure safety devices, control devices, relief systems and safety systems are ready to be placed back in service. 2.8.3 Ensure devices used to control hazardous energy are removed. 2.8.4 If panel instrument gas is lost during shutdown, restore instrument gas using proper procedure. 2.8.5 Ensure component(s) is (are) ready to be placed back in service using proper procedure. 2.8.6 Take all tripped indicators on panels out of service using proper procedure; by-pass or flag as necessary. 2.8.7 Pump down storage volumes to avoid premature shut-ins.

2.8.8 Restore hydraulic communications with all SSV and SCSSV. 2.8.9 Open each well until all wells are flowing into the production components. 2.8.10 Start up compressor. 2.8.11 Open all incoming flow lines and/or pipelines. 2.8.12 Open all wells on satellites. 2.8.13 Check all indicators on panels to see if they are in service (showing green ); if not, correct discrepancy. 2.8.14 Monitor process until normal operating conditions are restored. 2.8.15 Start up chemical injection. 2.8.16 Place all components and safety devices (indicators, relays, etc.) in service at panels. 2.8.17 If necessary, switch back to gas generator. 2.9 Emergency Shutdown Emergency shutdown is defined as the total and complete shutdown of a platform when an emergency occurs: relays and indicators in panels trip, automatic valves close (or open), alarm sounds, etc. Each facility has an ESD (Emergency Shutdown) system, TSE (Fire Loop) system and an ASH (Analyzer Safety High) in gas detection system conveniently and strategically located throughout the facility through which total shutdown is accomplished. These systems are shown on the facility s equipment layout drawings and platform paperwork. An emergency shutdown occurs when any of the following happen: Activate ESD at ESD station. ESD relay trips in Master Panel. Break fire loop (tubing) at boat landing. TSE melts at production component. Detect excessive gas in building. An alarm sounds indicating the emergency shutdown. Facility personnel then implement the Emergency Evacuation Plan (EEP); refer to the Plan for specific actions to take during an emergency. 2.10 Startup After Emergency Shutdown Startup after an emergency shutdown does not begin until the emergency situation is addressed (fire is extinguished, etc.), the incident, near hit or INC is investigated and any damaged or malfunctioned equipment or component is repaired or replaced. 2.10.1 Contact upstream/downstream facilities affected by the shutdown, if required. 2.10.2 Reset ESD relay or replace melted TSE or repair fire loop at boat landing or reset ASH at gas detection panel.

2.10.3 Take tripped indicators and relays out of service at panels using proper procedure. 2.10.4 If necessary, start up diesel generator or switch from gas to diesel generator using proper procedure. 2.10.5 Open one high pressure well to pressure up equipment. 2.10.6 Start up production process (including compressor, glycol, etc.) using proper procedure. 2.10.7 Monitor production process until conditions return to normal. 2.10.8 Place indicators and relays back in service using proper procedure. 2.10.9 Switch back to gas generator using proper procedure. 2.11 Chemicals Used in Production Operations The properties of, and hazards presented by, the chemicals used in the production operations are covered in the Petsec Hazard Communication Policy and Procedure. Operations personnel take precautions to prevent chemical exposure to personnel and the environment; these include technology, personal protective equipment (PPE), control of the facility s hazardous chemical inventory and measures to take if physical contract or airborne exposure occurs are also covered in this Procedure. 2.12 Review 3.0 Training These operating procedures are reviewed every three (3) years during the SEMS Program audits (see Audit element) and when MOC are generated (refer to Management Of Change element) to ensure they reflect current and actual operating practices (including changes) and the impact they make to the human and marine environment through hazards analysis. Safe and environmentally-sound work practices for identified hazards during operations and the degree of the hazards presented are developed and implemented after each process hazards analysis; refer to Hazards Analysis element. 3.1 Train all Petsec production operations employees and contract personnel every five (5) years on the contents of this element; refer to the Training element. 3.2 Train all newly-hired production operations employees and contract personnel within 30 days of arrival at the facility on the contents of this element; refer to the Training element. 3.3 Train or inform affected employees of any changes to this element within 30 days after the element changes have been approved and completed.

4.0 Recordkeeping 4.1 Operating Procedures are available to all production operations personnel working on the facility and maintained by the Facility PIC. 4.2 Facility Operating Procedures are updated when changes occur and communicated to all facility production operations personnel. 4.3 Copies of Operating Procedures are maintained in a SEMS file at the facility for the life of the facility. 5.0 Attachments 5.1 Attachment A: Operating Procedures (site-specific)

Attachment A Operating Procedures NOTE Each facility inserts its site-specific Operating Procedures behind this sheet in its SEMS Program manual.