HPHT Annular Casing Packer. Obex Annular Casing Packer

Similar documents
DB Bridge Plug. Features. Benefits. Applications

Retrievable Bridge Plugs

TAM Single SeT inflatable

On-Off Connector Skirt

Why Do Not Disturb Is a Safety Message for Well Integrity

OCEAN DRILLING PROGRAM

Hydro-Mech Bridge Plug

Deepwater Horizon Incident Internal Investigation

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

Subsea Safety Systems

E NGINEERED C EMENTING S OLUTIONS

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Float Equipment TYPE 925/926

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

Restoring Fluid Flow in Tubing Strings

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

Casing Design. Casing Design. By Dr. Khaled El-shreef

HydroPull. Extended-Reach Tool. Applications

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Downhole Diverter Gas Separator

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Design criteria, planning critical for successful deepwater well testing in HPHT developments

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Model A Sleeve Valve Cement Retainer

Oiltools PRODUCT CATALOGUE

Multiple Activated Bypass Tool. P roduct I nf ormation. Landrill oiltools. Version Aug 2017

1. The well has been shut in on a kick and the kill operation has not started.

Chapter 4 Key Findings. 4 Key Findings

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SUBSEA KILL SHEET EXERCISE No. 5

BP SIT Testing Franks Facility Lafayette

1 Exam Prep. Questions and Answers

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Practice Exam IADC WellSharp Driller and Supervisor

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

Dynamic Underbalance (DUB)

Oman Central Gas Velocity Strings in deep tight gas wells. September th European Conference on Gas Well Deliquification.

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

Live well deployment of long perforating gun system using combined CT technologies

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

Abstract Objective Scope of Study Introduction Procedures

Rig Math. Page 1.

Packer-Type Gas Separator with Seating Nipple

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Берг АБ Тел. (495) , факс (495) Turning Ideas Into Engineered Solutions KAYDON RING & SEAL, INC.

APPENDIX A1 - Drilling and completion work programme

W I L D W E L L C O N T R O L COMPLETIONS AND WORKOVERS

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

31 st Gas-Lift Workshop

Downhole Gas Separator Selection

shutoff valves 900 Series psig Manual Shutoff Valves

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

Debris Management Drilling Tools

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Wellwork Chronological Regulatory Report

PRESSURE TESTING REPORT

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Understanding pressure and pressure

Downhole Gas Separator Selection

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Emergency Pipeline Repair Isolation System

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

August 21, Deepwater MPD / PMCD

FLOAT EQUIPMENT AND CASING ACCESSORIES

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013

RPSEA UDW Forum June 22 & 23, Secure Energy for America

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

Downhole Gas Separators

PANACEA P125 USER MANUAL

SPE MS. Copyright 2015, Society of Petroleum Engineers

Jim McCoy. Tubing Anchor Effect on Pump Fillage. Lynn Rowlan Tony Podio Ken Skinner. Gas Well Deliquification Workshop.

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

Testing Services Overview

Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks. Alan Brodie Feb 2011 For more info visit

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

IWCF Equipment Sample Questions (Surface Stack)

PANACEA P200 STAINLESS STEEL USER MANUAL

En-Tegrity. A step change in subsea well control safety

Engineered solutions for complex pressure situations

W I L D W E L L C O N T R O L FLUIDS

ENDEAVOR ENERGY RESOURCES

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

VAM 21 VAM TOP HT VAM FJL VAM HTF DINO VAM VAM HW ST VAM MUST

DIVERLESS SUBSEA HOT TAPPING OF PRODUCTION PIPELINES

Inflatable Packers for Grouting 11/10/00

Extended leak off testing

Transcription:

HPHT Annular Casing Packer Obex Annular Casing Packer

Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration during primary cementing Poor cement quality Sustained casing pressure Gas pressure at surface 2015 HALLIBURTON. ALL RIGHTS RESERVED. 2

Solution Obex Annular Casing Packer Run on: 9-5/8 53.5 lb/ft casing Set in: 13-3/8 86 lb/ft casing 10,000 psi bi-directional differential pressure rating 350,000 lb bi-directional anchoring 300 F (149 C) Gas tight 2015 HALLIBURTON. ALL RIGHTS RESERVED. 3

Obex Annular Casing Packer Applications and Benefits Applications Run as a standalone casing-to-casing, anti-gas-migration packer Can be drilled out at any time Run in conjunction with an ES II HD stage cementer Benefits Drill out after the second stage of cement has set Enhance wellbore integrity with a secondary barrier Help protect weak formations Set at strategic intervals to shorten fluid column Alleviate hydrostatic pressure Set immediately below ES II HD stage cementer for multiple-stage cementing 2015 HALLIBURTON. ALL RIGHTS RESERVED. 4

Obex Annular Casing Packer Barrier Features Redundant HPHT seals prevents fluid communication between casing and annulus Internal continuous latching mechanism locks packer in the set position, preventing the rubber elements and slips from unsetting and otherwise creating a leak path Extrusion resistant element design for life-of-the-well integrity High strength barrel slips provide bidirectional anchoring up to 350,000 lbf 2015 HALLIBURTON. ALL RIGHTS RESERVED. 5

Obex Annular Casing Packer Operational Features Pipe manipulation can be used to confirm packer set and as a contingent setting method Can be run in conjunction with an ES II HD stage cementer Operated with the first-stage bypass plugs Can be drilled out after the second stage of cement has set Plug operated and mechanically set via applied pressure Robust setting mechanism designed for high-density, debris-laden fluids Operating temperature of 300ºF (149ºC) 2015 HALLIBURTON. ALL RIGHTS RESERVED. 6

Obex Annular Casing Packer - Element Package Design Ultra high swab resistance (>32 bpm in drift ID) Patent pending element spacer improved swab resistance by 85% Dual symmetric propped element Bi-directional high pressure resistance Debris tolerant HPHT for life of well No extrusion gap Durable HNBR elements 2015 HALLIBURTON. ALL RIGHTS RESERVED. 7

Obex Annular Casing Packer Barrel Slips Design Field-proven, high-strength barrel slips 60+ HRC tooth hardness will anchor in any casing Locks setting load into element package Symmetric circumferential anchoring Identical slips mirror across element package 2015 HALLIBURTON. ALL RIGHTS RESERVED. 8

Obex Annular Casing Packer Setting Mechanism Design Robust and reliable mechanical design Displacement plug operated Full bore hydraulic area 2015 HALLIBURTON. ALL RIGHTS RESERVED. 9

RUN IN HOLE Obex Annular Casing Packer LAND OPENING PLUG ON CEMENTER OPENING SEAT SHIFT CEMENTER OPENING SEAT 490 PSI SHEAR OUTER RING ON PLUG/LAND ON SETTING SEAT 1500 PSI 2015 HALLIBURTON. ALL RIGHTS RESERVED. 10

SET PACKER 650 (INITIAL) to 2200 PSI (FULL) Obex Annular Casing Packer BURST RUPTURE DISKS TO CIRCULATE ABOVE TOOL 3000 PSI CLOSE CEMENTER 1000 PSI DRILLOUT 2015 HALLIBURTON. ALL RIGHTS RESERVED. 11

Obex Annular Casing Packer Flow Endurance Testing Element OD = 11.62 in. (295 mm) Chamber ID = 11.969 in. (304 mm) 14 ppg WBM at 130 F (54 C) Max flow rate = 32 bpm Drift ID Chamber (11.969 ID) Velocity over elements = 66.7 ft/s Equivalent run in speed = 240 ft/s (drift ID) Maximum differential pressure across packer = 714 psi Equivalent to 27 bpm with 20 ppg WBM Pressure Transducer Ports Flow out Flow in Element Back-up Shoes High Flow Element Spacer Drift ID Chamber (11.969 ID) Elements 2015 HALLIBURTON. ALL RIGHTS RESERVED. 12

Obex Annular Casing Packer Pressure Integrity Testing Test fluids: UCON oil at 350 F (177 C) 20.5 ppg WBM at 72 F (22 C) Chamber IDs: 11.969 in. and 12.316 in. Setting force applied: 63,500 lb (85% of minimum tool setting force) Tested per ISO 14310 V5 criteria Passed at 11,500 psi differential pressure in all tests Press Tube Jam Nut Mandrel Element Package 2015 HALLIBURTON. ALL RIGHTS RESERVED. 13

Pressure (PSI) Temperature ( F) Obex Annular Casing Packer Pressure Integrity Testing UCON Oil; 350 F; 12.316 ID 13000 12000 11000 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 700 600 500 400 300 200 100 0 0 60 120 180 240 300 360 420 480 540 600 660 Time (minutes) ABOVE BELOW Temp 2015 HALLIBURTON. ALL RIGHTS RESERVED. 14

Obex Annular Casing Packer Full Function Testing Performed at Halliburton s Mike Adams test well and HTGTF in Carrollton, TX Function testing included: Run in hole/reciprocation simulating running packer to TD 1,000 ft at 3-5 ft/s 1,500 ft at 1.5-3 ft/s 5,000 ft at 1-2 ft/s Circulation at 17 bpm for 3 hours to simulate 3,000 bbl hole conditioning and first stage cement job Set packer at 2,200 ft (670 meters) using field operating procedures 2015 HALLIBURTON. ALL RIGHTS RESERVED. 15

Obex Annular Casing Packer Full Function Testing Displacing Plug and Setting Packer 2015 HALLIBURTON. ALL RIGHTS RESERVED. 16

Obex Annular Casing Packer Full Function Gas Test Set packer retrieved to surface Unique setup allowed packer and casing to be placed in gas test facility Packer tested bi-directionally with nitrogen at 11,500 psi and 300 F Held both directions for 15 minutes with a maximum pressure drop of 0.6% Continued the hold from below for 8 hours 2015 HALLIBURTON. ALL RIGHTS RESERVED. 17

Pressure (PSI) Temperature ( F) Obex Annular Casing Packer Full Function Gas Test 12000 400 11000 10000 350 9000 300 8000 7000 250 6000 200 5000 4000 150 3000 100 2000 1000 50 0 0 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 Time Above Below Mandrel Temp 2015 HALLIBURTON. ALL RIGHTS RESERVED. 18

Obex Annular Casing Packer Summary Challenge Support second stage cement Mitigate annular gas migration Life-of-well functionality Solution Result Gas tight, bi-directional element package High-strength anchoring with barrel slips Robust, reliable, and debris-tolerant mechanical setting mechanism Gas tight to 10,000 psi and 300ºF (149ºC) Standalone Rated to 14 bpm circulation in any fluid density Coupled with an ES II HD stage cementer 2015 HALLIBURTON. ALL RIGHTS RESERVED. 19