General. Procurement Plan

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Contracts Subjects to Prior Review (US$)

Request for Proposals. Prep & Submissio n by Ex Ag. Noobjection. Plan vs. Actual. Date

REVISED PROCUREMENT PLAN 30-Dec-12

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency

Category Works: Activities ShowHide

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods

Procurement Plan for Consultancy Services (As of April 30, 2010)

Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project

Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Total planned cost under the Grant USD 19,8 mln.

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1.

Joint Procurement Plan for Investment Component. Documents submitted to the Bank. Plan VS Actual

Outline of the Position Duties and Responsibilities

ARMENIA: Second Education Quality and Relevance Project (APL2) Procurement Plan. As of March 15, Measu rement Unit.

THE UNITED REPUBLIC OF TANZANIA

GENERAL PROCUREMENT NOTICE NO.1/2016/2017. PPF Pensions Fund. Morogoro Road/Samora Avenue. Dar es Salaam, Tanzania. Telephone: /21

Kyrgyzstan Agricultural Productivity Assistance Project

Planned Procurement Opportunities Report. June 2018

Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated )

Procurement Plan-Goods. Prior or Post Review. Procurement Method. Estimated Amount in US $ Pre-or Post Qualification

Mexico: Farmout Bidding Round 2018 By Nicolas Borda, Hunt Buckley, and Carlos Alva

19/HQ/G/02 MC RFQ L.P.O N/A N/A N/A N/A N/A N/A 28/08/2018 Plan 174,218,051

Note # US$1 Mil Total for Other Cost - ESTIMATE SH: <US$100 K Total for Other Cost - ACTUALS DC: None

Winter Maintenance in Lithuania

CANADA GAMES COUNCIL REQUEST FOR PROPOSAL

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

BOXING FEDERATION OF INDIA

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN)

Selection Review Description Estimate Issuance

PRICE GUIDE. NB-PB-NT-LA-TSO-CHK-Price Guide Combined

THE COMMON FINDINGS FROM ROAD SAFETY AUDITS AND ROAD SAFETY INSPECTIONS IN THE WESTERN BALKAN REGION WION

Project/PrANAMBRA STATE EDUCATION PROGRAMME INVESTMENT PROJECT. Estimated Amount in US $'000. Procure ment Method

THE PEP Partnership on Cycling Pan-European Master Plan for Cycling

RECONSTRUCTION OF ROADS ROAD TO SAFETY

The European Athletic Association (hereinafter European Athletics) shall promote a European Race Walking Cup every uneven year.

Association. Serbia: Gaming Industry Market Report. Jakta Association Research Team Research period for Serbia: 2 nd July 2 nd September 2012.

Board Members Vancouver Park Board General Manager Parks and Recreation. SUBJECT: Construction Contract Award Kitsilano Beach Tennis Courts Renovation

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

Economic and Social Council

GUIDE TO SKATE CANADA: ALBERTA-NWT/NUNAVUT. ATHLETE FUNDING PROGRAM Effective April 1, 2018

Bid Deadline for all 2016 Events: 30 January 2015

Screening report Serbia

The European Athletic Association (hereinafter European Athletics) shall promote a European Athletics U18 Championships in every even year.

EUROPEAN YOUTH OLYMPIC GAMES QUALIFICATION EVENT BID DOCUMENT 2014

European Sambo Federation Sambo

CFE certification Bicycle-friendly Employer

BID SPECIFICATIONS. Tablets FOR. Hardeman County Schools

Serbia: Floods. DREF operation n MDRRS001 GLIDE n FL SRB 15 May 2008

EXPRESSION OF INTEREST

European Sambo Federation Sambo

Invitation Letter to tender for Live Track System of 2017 ICF Canoe Ocean Racing World Championships

14 September 2018 Block Energy Procurement Events Results

The European Athletic Association (hereinafter European Athletics) shall promote a European 10,000m Cup every year.

ETU EUROPEAN YOUTH TRIATHLON CHAMPIONSHIP & FESTIVAL BID DOCUMENT 2017

Golf Professional Services - Independent Contractor

BOXING FEDERATION OF INDIA

Director, Purchasing and Materials Management

Metskill Limited Supply-Chain Charges and Fees Policy

EUROPEAN COMBINED EVENTS TEAM CHAMPIONSHIPS 701. PROMOTION AND RIGHTS

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

CITY OF KINGSPORT LANE RENTAL APPLICATION APPLICATION FOR AGE GROUP COMPETITIVE SWIM TEAM PRACTICE AND MEET TIMES AT THE KINGSPORT AQUATIC CENTER

The European Athletic Association (hereinafter European Athletics) shall promote a European Cross Country Championships every year.

Category Goods: Activities ShowHide Description Reference #

EUROPEAN TRIATHLON UNION ETU TRIATHLON EUROPEAN CUPS BID DOCUMENT BID DOCUMENTS ETU TRIATHLON EUROPEAN CUPS

The European Athletic Association (hereinafter European Athletics) shall promote a European Cross Country Championships every year.

B&B Gas Well Services, LLC HEALTH, SAFETY AND ENVRONMENTAL MANUAL HAZARD COMMUNICATION PROGRAM

154074/EU XXV. GP. Eingelangt am 14/09/17 PE-CONS 25/1/17 REV 1 EUROPEAN UNION. Strasbourg, 13 September 2017 (OR. en) PE-CONS 25/1/17 REV 1

1. What are FIFA s general objectives in the area of football development? How does development relate to FIFA s daily business?...

APPOINTMENT OF AUDIT SERVICES PROVIDER INVITATION TO TENDER

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

EUROPEAN TRIATHLON UNION 2019 SPRINT TRIATHLON EUROPEAN CHAMPIONSHIPS BID DOCUMENT 1 BID DOCUMENTS 2019 ETU SPRINT TRIATHLON EUROPEAN CHAMPIONSHIPS

EUROPEAN ATHLETICS INDOOR CHAMPIONSHIPS 201. PROMOTION AND RIGHTS

Outline 2017/3/9. Presented at JTRI Symposium, Tokyo, 20 February 2017

ROBOTICS EDUCATION & COMPETITION FOUNDATION

THE UNITED REPUBLIC OF TANZANIA

Elite Canada in Men s & Women s Artistic Gymnastics

BIATHLE & TRIATHLE WORLD TOUR BID DECLARATION

The European Athletic Association (hereinafter European Athletics) shall promote a European Athletics U20 Championships in every uneven year.

EUROPEAN CHAMPION CLUBS CUP CROSS COUNTRY PROMOTION AND RIGHTS

6 th NATIONS CUP BOXING TOURNAMENT SERBIA - VRBAS January, Junior/Youth/Elite Women s

AMENDMENT OF SOLICITATION

SERVICE PROVIDERS FOR GAMES PROMOTION


PRINCIPLES FOR THE SELECTION AND MANAGEMENT OF EUROPEAN ATHLETICS ONE-DAY OUTDOOR MEETINGS

ANTI DOPING AGENCY OF SERBIA

2018 Volleyball Canada Championships. Edmonton, AB May 12-24, Accommodations Management Request for Proposal

City of Palmer Action Memorandum No

Welsh Triathlon. National Championship and National Series Events. Tender Process for 2018 season

BULLETIN No1 ORGANISERS PATRONAGE. CANOE FEDERATION OF SERBIA Belgrade, Ada Ciganlija 10 Phone:

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

EUROPEAN TRIATHLON UNION TRIATHLON CLUB EUROPEAN CHAMPIONSHIPS BID DOCUMENT BID DOCUMENTS ETU TRIATHLON CLUB EUROPEAN CHAMPIONSHIPS

Cezve/Ibrik Championship Event Hosting Guidelines

THE PEP Partnership on Cycling

EUROPEAN ATHLETICS CHAMPIONSHIPS 101. PROMOTION AND RIGHTS

EUROPEAN TRIATHLON UNION U23 TRIATHLON EUROPEAN CHAMPIONSHIPS BID DOCUMENT BID DOCUMENTS 2018 ETU U23 TRIATHLON EUROPEAN CHAMPIONSHIPS

TRIATHLON MIXED RELAY CLUB EUROPEAN CHAMPIONSHIPS BID DOCUMENT 2018

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date of General Procurement Notice: 1 Prior Review Threshold Procurement Method ICB Goods >USD 2,000,000 / EUR 1,500,000 NCB Goods <USD 2,000,000 / EUR 1,500,000 Shopping Goods SERBIA: Floods Emergency Recovery Project (P152018) - Procurement Plan at Negotiations I. Goods and Works and non-consulting services Agreed date of the Procurement Plan: Original: September 17, 2014 Revised: II. Goods and Works and non-consulting services to the Guidelines for Procurement: Within emergency period (until June ) <USD 500,000 / 386,000 Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 Method Threshold (USD and EUR equivalent) EUR After emergency period >USD 1,000,000 / EUR 772,000 <USD 1,000,000 / EUR 772,000 <USD 100,000 / EUR 77,000 All contract subject to prior review First two Goods contracts subject to prior review First Contract Prior Review Threshold Comments

ICB Works >USD 10,000,000 / EUR 7,700,000 >USD 5,000,000 / EUR 3,800,000 All contracts subject to prior review NCB Works <USD 10,000,000 / EUR 7,700,000 <USD 5,000,000 / EUR 3,800,000 First two Works contracts subject to prior review Shopping Works <USD 1,000,000 / EUR 772,000 <USD 200,000 / EUR 154,000 First Contract Direct Contracting All contracts above USD 60,000 subject to prior review Procurement of power energy All contracts Procurement of Commodities, para. 2.68 of Guidelines 2 Prequalification. Bidders for N/A shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. - Not applicable 3 Proposed Procedures for CDD Components (as per paragraph. 3.19 of the Guidelines): - Not applicable 4 Reference to (if any) Project Operational Manual: Project Operational Manuals (by EPS and MAEP) will be prepared by the Client as condition for disbursements and will be cleared with the Bank. The Manual will provide details on the procurement of goods, works, non-consulting services, and consulting services for the project. 5 Any Other Special Procurement Arrangements: Procurement of power imports will be purchased following industry practices (procurement of commodities, para. 2.68 of Procurement Guidelines). The Dewatering contract followed the Serbian PPL. 6 Procurement Packages with Methods and Time Schedule

III Selection of Consultants 1 Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated In Appendix 1 to the Guidelines and Employment of Consultants Selection Method Method Threshold (USD and EUR equivalent) Within emergency period (until June ) After emergency period Prior Review Threshold Comments Quality Based Selection (QCBS) >USD 300,000 / EUR 232,000 <USD 300,000 / EUR 232,000 All contract subject to prior review Quality Based Selection (QBS); Fixed Budget(FBS); Least-Cost Selection (LCS) All contracts above USD 200,000 subject to prior review Selection based on Consultants' Qualification (CQS) Single-Source Selection (SSS) >USD 300,000 / 232,000 EUR <USD 300,000 / EUR 232,000 Contracts above USD 300,000 all subject to prior review. First contract less than USD 300,000 subject to prior review All contracts above USD 5,000 subject to prior review Individual Consultant (IC) All TORs and PIU contracts subject to prior review 2 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3 Any Other Special Selection Arrangements: Not applicable

# Contract # Procurement Status Component Nr. Procuremen Type Procurement method Bank's review (Prior/Post) I. Goods and Works and non-consulting services 6 Procurement Packages with Methods and Time Schedule: Description of goods Bid Documents and SPN sent to the Bank Bank's NO objection to Bid Documents Issue date of the Bid Document/Inv itation for Bids Deadline for Bid submission Bid opening Bid evaluation report date or sent to the Bank COMPONENT 1 1726/39-14 1726/37-14 1726/43-14 1726/42-14 1 1726/34-14 1726/41-14 1726/38-14 Power Purchase (July 2014 to December 2014) G Commodities Post 30.05.2014 09.06.2014 09.06.2014 11.06.2014 1726/35-14 1726/36-14 1726/40-14 1726/33-14 2538/48-14 2538/45-14 2538/49-14 2538/40-14 2 2538/47-14 2538/50-14 2538/41-14 Power Purchase (in December 2014) G Commodities Prior 30.10.2014 31.10.2014 12.11.2014 12.11.2014 14.11.2014 2538/42-14

2538/44-14 2538/46-14 2538/51-14 2537/39-14 2537/41-14 2537/40-14 3 2537/43-14 2537/44-14 2537/47-14 Power Purchase (December 2014 to February ) G Commodities Prior 30.10.2014 31.10.2014 12.11.2014 12.11.2014 14.11.2014 2537/46-14 2537/42-14 2537/45-14 2537/39-14 2537/41-14 2537/40-14 4 2537/43-14 2537/44-14 2537/47-14 Power Purchase (September ) G Commodities Prior 14.08. 17.08.2014 17.08.2014 24.08.2014 24.08.2014 24.08.2014 2537/46-14 2537/42-14 2537/45-14 2537/39-14 5 2537/41-14 2537/40-14 2537/43-14 Power Purchase (September, period 12 to 30 September) G Commodities Prior 14.08. 17.08.2014 26.08.2014 02.09.2014 02.09.2014 02.09.2014

6 2537/44-14 Planned 21.09. 24.09. 24.09. 01.10. 01.10. 02.10. 45801/23-15 21.09. 24.09. 24.09. 01.10. 01.10. 02.10. 45801/25-15 45801/24-15 Power Purchase (October 45801/22-15, period 12 to 31 G Commodities Prior 45801/19-15 45801/20-15 October) 45801/21-15 45801/18-15 7 74463/17-15 8 9 10 11 12 Power Purchase (December, period 19 to 31 December) Metering Device Mobile substations for the distribution network (SS 20 (10)/0.4 kv/kv) Fix substations for the distribution network (SS 110)/x kv/kv) Fix substations for the distribution network (SS 110)/x kv/kv) Metering Device for Public lighting Planned 18-Nov- 23-Nov- 23-Nov- 30-Nov- 30-Nov- 30-Nov- G Commodities Prior Planned ERL-G- 28.10. 10.11. 25.11. 19.01.2016 20.01.2016 04.02.2016 Revised ICB-002- G ICB Prior Planned ERL-G- 05.10. 14.10. 23.10. 03.12. 03.12. 17.12. Revised ICB-001- G ICB Prior Planned ERL-G- 01.12. 14.12.2016 22.12. 01.02.2016 01.02.2016 16.02.2016 Revised ICB-003- G ICB Prior Planned ERL-G- 01.12. 14.12.2016 22.12. 01.02.2016 01.02.2016 16.02.2016 Revised NCB-004- G NCB Prior Planned ERL-G- 09.12. 06.01.2016 14.01.2016 24.02.2016 24.02.2016 10.03.2016 Revised ICB-005-2016 G ICB Prior

13 Dewatering of Tamnava West Open Pit Mine CJN/08/1 4/DUKN National Emergency Procedures Post 11.08.2014 COMPONENT 2 & 3 1 NCB-012-G- 2016 Supply and Installation for Equipment for Flood Control and Protection Planned 03/30/15 04/06/15 04/07/15 06/05/15 06/05/15 06/12/15 Revised 3 G NCB Post 07/26/16 08/05/16 08/08/16 09/05/16 09/05/16 09/16/16 2 SH -011-G- Planned 06/22/15 06/29/15 06/30/15 07/13/15 07/13/15 07/17/15 Office equipment Revised 3 G SH Post n/a n/a 02/05/16 02/19/16 02/19/16 03/07/16 3 NCB-004-W- Flood Protection of Novi Pazar settlement Planned n/a n/a 05/13/15 06/10/15 06/10/15 06/15/15 Revised 3 W NCB Post n/a n/a 10/26/15 11/30/15 11/30/15 11/07/15 n/a n/a 12/12/15 01/12/16 Planned n/a n/a 05/24/15 06/21/15 06/21/15 06/26/15 Revised n/a n/a 10/20/15 11/17/15 11/17/15 11/23/15 4 NCB-005-W- Flood Protection of Aleksinac settlement 3 W NCB Post n/a n/a 10/17/15 11/17/15 10/17/15 12/15/15 5 NCB-006-W- Flood Protection of Smederevska Palanka settlement Planned n/a n/a 07/03/15 07/01/15 07/01/15 07/07/15 Revised 3 W NCB Post n/a n/a 01/19/16 02/16/16 02/16/16 04/04/16 6 NCB-003- Flood Protection of Negotin area Planned 06/03/15 06/10/15 06/12/15 07/10/15 07/10/15 07/17/15 Revised 3 W NCB Prior 05/11/15 05/18/15 05/19/15 06/16/15 06/16/15 06/22/15

# Contract # Procurement Status Component Nr. Procurement Type Procurement method Bank's review (Prior/Post) area 05/11/15 06/25/15 06/27/15 07/20/15 07/20/15 08/26/15 7 NCB-007-W- Construction of flood protection system for Donji Ljubes settlement Planned 06/08/15 06/15/15 06/17/15 07/15/15 07/15/15 07/21/15 Revised 3 W NCB Prior 06/26/15 07/03/15 07/06/15 08/03/15 08/03/15 08/07/15 09/09/15 09/14/15 09/17/15 09/16/15 09/16/15 8 NCB-008-W- Rehabilitation of the left bank embankment on the Danube river on section B. Palanka town Planned n/a n/a 06/17/15 07/15/15 07/15/15 07/21/15 Revised 3 W NCB Post n/a n/a 03/21/16 04/18/16 04/18/16 04/30/16 9 NCB-009-W- Rehabilitation of the right bank dike on the Ibar River Planned n/a n/a 08/14/15 09/11/15 09/11/15 09/18/15 Revised 3 W NCB Post n/a n/a 05/16/16 06/13/16 06/13/16 06/30/16 10 NCB-010-W- Construction of flood protection system for the city of Nis including reconstruction of the right bank embankment of the river Nisava and river training works Planned n/a n/a 06/15/15 07/13/15 07/13/15 07/20/15 Revised 3 W NCB Post n/a n/a 09/01/15 09/29/15 09/29/15 10/06/15 n/a n/a 09/21/15 09/20/15 11/10/15 12/16/15 4. Consultants Assignments with Selection Methods and Time Schedule: 1 Description of Assignment Technical assistance for load management TOR and ReOI sent to the bank Bank's no objection to TOR and ReOI ReOI Published Deadline for Submission of ReOI Shortlist and ReOIs Evaluation Report sent to the Bank Bank's no objection to the Shortlist and ReOIs Evaluation Report Planned ERL-CS- 01.02.2016 19.02.2016 29.02.2016 25.03.2016 11.04.2016 22.04.2016 Revised CQS-001-2016 CS CQS Prior

Planned 10/01/16 01/08/16 10/01/16 01/26/16 02/11/16 02/18/16 2a Project auditing EPS Revised CS LCS Prior 2b LCS-013-CS- Planned 10/01/16 01/08/16 10/01/16 01/26/16 02/11/16 02/18/16 Project auditing MAEP Revised CS LCS Post 10/01/16 01/08/16 10/01/16 01/26/16 02/11/16 02/18/16 Planned 05/14/15 05/21/15 05/25/15 06/08/15 06/15/15 06/08/15 3 Construction supervision for QCBS-002-CSflood protection works Revised 3 CS QCBS Prior 03/05/15 03/12/15 03/14/15 03/30/15 04/06/15 04/13/15 03/01/15 03/04/15 03/10/15 03/27/15 04/25/15 06/22/15 4 5 6 SSS-001-CS- /1 SSS-001-CS- /6 SSS-001-CS- /5 Planned n/a n/a n/a n/a Project Director Revised 3 CS SSS Prior n/a n/a n/a n/a n/a n/a n/a n/a Planned n/a n/a n/a n/a Civil Engineer Revised 3 CS SSS Prior n/a n/a n/a n/a n/a n/a n/a n/a Planned n/a n/a n/a n/a Safeguards Specialist Revised 3 CS SSS Prior n/a n/a n/a n/a n/a n/a n/a n/a 7 SSS-001-CS- /4 Monitoring and Evaluation Expert Planned n/a n/a n/a n/a Revised 3 CS SSS Prior n/a n/a n/a n/a n/a n/a n/a n/a 8 SSS-001-CS- /2 Planned n/a n/a n/a n/a Procurement Officer Revised 3 CS SSS Prior n/a n/a n/a n/a

9 10 11 /2 SSS-001-CS- /3 Financial Management Officer IC- Office 001-CS- /7 Assistant/Interpreter IC- 001-CS- Liaison Officer /8 n/a n/a n/a n/a Planned n/a n/a n/a n/a Revised 3 CS SSS Prior n/a n/a n/a n/a n/a n/a n/a n/a Planned 01/01/15 01/07/15 n/a n/a n/a n/a Revised 3 CS IC Prior 05/25/15 05/29/15 n/a n/a n/a n/a n/a n/a n/a n/a Planned 04/25/15 05/01/15 n/a n/a n/a n/a Revised 3 CS IC Prior 04/29/15 05/06/15 n/a n/a n/a n/a 04/29/15 05/05/15 n/a n/a n/a n/a 12 Planned 06/25/15 07/01/15 n/a n/a n/a n/a IC- Pesticide expertise 014-CS- Revised 3 CS IC Post 06/25/15 07/01/15 n/a n/a n/a n/a 06/29/15 07/21/15 13 CQS-015-CS- 2016 Design of flood control, irrigation, river training barriere Pricevic, Obnica River from km 15+800 to 20+800 Planned n/a n/a 02/08/16 02/22/16 n/a n/a Revised 3 CS CQS Post n/a n/a 02/08/16 02/22/16 n/a n/a 14 CQS-016-CS- 2016 Design of flood control, irrigation, river training barriere Struganik, Ribnica River from km 15+500 to 20+500 Design of flood control, irrigation, river training barriere Poljanice, Kačar River from km 14+200 to Planned n/a n/a 03/18/16 04/01/16 n/a n/a Revised 3 CS CQS Post n/a n/a 03/18/16 04/01/16 n/a n/a Planned n/a n/a 04/22/16 05/06/16 n/a n/a

15 CQS-017-CS- 2016 River from km 14+200 to km 19+200 including design inovation for Dobrava River barriere on Dobrava River, Vladimirci Consultant Services Revised 3 CS CQS Post n/a n/a 04/22/16 05/06/16 n/a n/a

Bank's NO to the Bid Evaluation Report Draft Contract sent to the Bank Bank's no objection to Contract award Contract Number Contract signing date Contract completion date Winning bidder name&country Contract Amount 1726/39-14 18.06.2014. 31.12.2014. MVM Partner Serbia d.o.o. 5,087,279.75 1726/37-14 18.06.2014. 31.12.2014. GEN - I d.o.o. 16,459,508.80 1726/43-14 19.06.2014. 31.12.2014. HSE BE d.o.o. 4,083,958.20 Elektro energija SRB d.o.o. 1726/42-14 19.06.2014. 31.12.2014. REPOWER Serbia d.o.o. 1726/34-14 17.06.2014. 31.12.2014. 2,057,438.60 4,106,926.60 1726/41-14 19.06.2014. 31.12.2014. PETROL d.o.o. 16,516,046.40 1726/38-14 18.06.2014. 31.12.2014. PROENTRA d.o.o. 4,125,478.00 1726/35-14 18.06.2014. 31.12.2014. EFT TRADE d.o.o. 2,060,088.80 21.11.2014 21.11.2014 1726/36-14 18.06.2014. 31.12.2014. EFT TRADE d.o.o. 4,142,262.60 Danske Commodities SERBIA 1726/40-14 19.06.2014. 31.12.2014. d.o.o. ALPIQ Energija RS d.o.o. 1726/33-14 17.06.2014. 31.12.2014. 2538/48-14 24.11.2014 2538/45-14 21.11.2014. 2538/49-14 24.11.2014 2538/40-14 21.11.2014. 2538/47-14 24.11.2014 2538/50-14 24.11.2014 2538/41-14 21.11.2014. 2538/42-14 21.11.2014. 31.12.2014. 1,032,473.75 2,080,407.00 NIS a.d. Novi Sad 167,883.60 31.12.2014. PETROL d.o.o. 1,343,961.60 31.12.2014. Elektro energija SRB d.o.o. 168,330.00 31.12.2014. STATKRAFT Western Balkans d.o.o. 334,428.00 31.12.2014. 31.12.2014. 31.12.2014. 31.12.2014. HSE BE d.o.o. 335,841.60 EDS International d.o.o. 501,753.60 AXPO d.o.o. 334,874.40 AXPO d.o.o. 167,920.80

EFT TRADE d.o.o., 2538/44-14 21.11.2014. 31.12.2014. Novi ALPIQ Energija RS d.o.o. 2538/46-14 21.11.2014. 31.12.2014. MVM Partner Serbia d.o.o. 2538/51-14 24.11.2014 31.12.2014. 671,980.80 1,006,632.00 168,330.00 2537/39-14 21.11.2014. 28.02.. AXPO d.o.o. 1,509,516.00 2537/41-14 21.11.2014. 28.02.. EFT TRADE d.o.o. 1,313,582.40 20.11.2014 20.11.2014 26.08.2014 24.08.2014 26.08.2014 2537/40-14 21.11.2014. 28.02.. EFT TRADE d.o.o. 2,016,576.00 ALPIQ Energija RS d.o.o. 2537/43-14 21.11.2014. 28.02.. ALPIQ Energija RS d.o.o. 2537/44-14 21.11.2014. 28.02.. EDS International d.o.o. 2537/47-14 24.11.2014 28.02.. Elektro energija SRB d.o.o. 2537/46-14 24.11.2014 28.02.. 707,313.60 3,018,384.00 1,500,444.00 502,092.00 2537/42-14 21.11.2014. 28.02.. PETROL d.o.o. 6,039,360.00 2537/45-14 24.11.2014 28.02.. HSE BE d.o.o. 503,172.00 ALPIQ Energija RS d.o.o. 29444/23-15 28.08.2014. 30.09.. ALPIQ Energija RS d.o.o. 29444/22-15 28.08.2014. 30.09.. ALPIQ Energija RS d.o.o. 29444/21-15 28.08.2014. 30.09.. ALPIQ Energija RS d.o.o. 29444/20-15 28.08.2014. 30.09.. 305,784.00 307,008.00 307,656.00 308,232.00 29444/26-15 28.08.2014. 30.09.. GEN - I d.o.o. 1,539,000.00 29444/24-15 28.08.2014. 30.09.. GEN - I d.o.o. 1,540,800.00 29444/27-15 28.08.2014. 30.09.. GEN - I d.o.o. 1,544,760.00 29444/25-15 28.08.2014. 30.09.. GEN - I d.o.o. 309,312.00 29444/19-15 27.08.2014. 30.09.. PETROL d.o.o. 1,545,120.00 33768/18-15 08.09.2014. 30.09.. EDS International d.o.o. 79,104.00 33768/19-15 08.09.2014. 30.09.. GEN - I d.o.o. 712,108.80 07.09.2014 02.09.2014 07.09.2014 33768/22-15 08.09.2014. 30.09.. GEN - I d.o.o. 787,008.00 33768/21-15 08.09.2014. 30.09.. GEN - I d.o.o. 783,552.00

33768/20-15 08.09.2014. 30.09.. GEN - I d.o.o. 777,408.00 05.10. 02.10. 05.10. 05.10. 02.10. 05.10. 45801/23-15 07.10.. 31.10.. PETROL d.o.o. 107,575.65 45801/25-15 07.10.. 31.10.. PETROL d.o.o. 108,946.50 45801/24-15 07.10.. 31.10.. PETROL d.o.o. 216,353.80 45801/22-15 07.10.. 31.10.. PETROL d.o.o. 427,801.40 45801/19-15 06.10.. 31.10.. EFT TRADE d.o.o. 327,777.45 45801/20-15 06.10.. 31.10.. EFT TRADE d.o.o. 435,112.60 45801/21-15 06.10.. 31.10.. EFT TRADE d.o.o. 324,169.95 45801/18-15 06.10.. 31.10.. 7-Dec- 30-Nov- 7-Dec- 74463/17-15 7-Dec- 31-Dec- MVM Partner Serbia d.o.o. 216,931.00 GEN - I d.o.o. 1,170,312.00 17.02.2016 03.03.2016 09.03.2016 10.03.2016 27.07.2017 21.01.2016 05.02.2016 11.02. 16.02.2016 27.09.2016 29.02.2016 14.03.2016 21.03.2016 24.03.2016 30.11.2017 29.02.2016 14.03.2016 21.03.2016 24.03.2016 30.11.2017 23.03.2016 07.04.2016 13.04.2016 18.04.2016 04.04.2017

1833/87-14 19.08.2014 26.04. Energotehnika Južna Bačka, Novi Sad, Srbija and SC NESS Proiect Europe SRL, Romania 0.132 per m3 06/19/15 06/12/15 06/19/15 07/10/15 08/10/15 09/23/16 09/16/16 09/23/16 10/03/16 11/03/16 07/24/15 07/17/15 07/24/15 07/27/15 n/a n/a n/a 03/14/16 n/a n/a n/a n/a 06/30/15 10/30/16 n/a n/a n/a n/a 11/21/15 03/21/17 n/a n/a n/a n/a 07/10/15 11/10/16 n/a n/a n/a n/a 12/14/15 04/14/17 n/a n/a n/a 401-00-3993/-07 n/a n/a n/a n/a 07/31/15 11/30/16 n/a n/a n/a n/a 04/25/16 08/27/17 JV Podrinje- Pomoravlje : VD Jugokop Podrinje d.o.o., Sabac, Serbia, VP Cuprija AD,Cuprija, Serbia and PD Vodoprivreda 1,198,864 07/27/15 07/17/15 07/27/15 08/10/15 09/10/16 06/29/15 06/22/15 06/29/15 07/15/15 08/15/16

09/16/15 08/26/15 09/16/15 325-00-1292/-07 10/05/15 11/05/16 07/28/15 07/21/15 07/28/15 08/11/15 04/11/17 08/14/15 08/07/15 08/14/15 08/28/15 04/28/17 VP "Cuprija", Cuprija, Serbia 877,126.00 n/a n/a n/a n/a 07/31/15 08/31/16 n/a n/a n/a n/a 05/20/16 06/20/17 n/a n/a n/a 10/09/15 02/09/17 n/a n/a n/a 07/15/16 11/15/17 n/a n/a n/a 08/15/15 02/15/17 n/a n/a n/a 10/23/15 04/23/17 n/a n/a n/a 401-00-3994/-07 JV: STRABAG AG, Spittal/Drau, Austria and STRABAG DOO, Belgrade, Serbia 3,039,188 RFP sent to the Bank Bank's No objection to RFP Issue date of the RFP Proposal Submission Deadline Evaluation Report sent to the Bank Bank's NO objection to Evaluation report Bank's No objection to Contract Award Contract Signing date Contract Completion Consultant's name 25.04.2016 09.05.2016 26.05.2016 26.05.2016 04.07.2016 18.07.2016 25.07.2016 26.07.2016 08.11.

02/18/16 02/25/16 02/26/16 03/25/16 04/08/16 04/15/16 04/15/16 04/30/16 04/30/17 02/18/16 02/25/16 02/26/16 03/25/16 04/08/16 04/15/16 04/15/16 04/30/16 04/30/17 02/18/16 02/25/16 02/26/16 03/25/16 04/08/16 04/15/16 04/15/16 04/30/16 04/30/17 06/15/15 06/08/15 06/09/15 07/07/15 07/14/15 07/21/15 07/21/15 08/25/15 02/25/17 04/06/15 04/13/15 04/15/15 05/13/15 05/20/15 05/27/15 05/27/15 07/01/15 01/01/17 04/25/15 06/22/15 06/24/15 07/31/15 08/15/15 11/13/15 12/15/15 12/16/15 12/01/14 n/a n/a n/a n/a n/a 01/31/15 02/05/15 02/05/16 n/a n/a n/a n/a n/a n/a 02/01/15 02/06/15 02/06/16 n/a n/a n/a n/a n/a n/a 02/05/15 02/11/15 02/11/16 12/01/14 n/a n/a n/a n/a n/a 01/30/15 02/05/15 02/05/16 n/a n/a n/a n/a n/a n/a 02/05/15 02/10/15 02/10/16 n/a n/a n/a n/a n/a n/a 02/11/15 02/19/15 02/19/16 12/01/14 n/a n/a n/a n/a n/a 01/30/15 02/05/15 02/05/16 n/a n/a n/a n/a n/a n/a 02/05/15 02/10/15 02/10/16 n/a n/a n/a n/a n/a n/a 02/12/15 02/12/15 02/12/16 12/01/14 n/a n/a n/a n/a n/a 01/30/15 02/05/15 02/05/16 n/a n/a n/a n/a n/a n/a 02/05/15 02/10/15 02/10/16 n/a n/a n/a n/a n/a n/a 02/11/15 02/19/15 02/19/16 12/01/14 n/a n/a n/a n/a n/a 01/30/15 02/05/15 02/05/16 n/a n/a n/a n/a n/a n/a 02/05/15 02/10/15 02/10/16 SAFEGE,Nanterre Cedex France and SAFEGE "Dmitar Zakula PR Agencija za pruzanje konsultantskih usluga "Time 4"", Đurađ Šurlan PR, Agencija za konsalting DJ Konsalting, Belgrade, Serbia PR Igor Radovic, Agencija za inz. delatnosti i tehn. savetovanje IDTS, Belgrade, "Nenad Brkic PR Agencija za pruzanje konsultantskih usluga "ND "Milica Rakocevic PR Agencija za pruzanje konsultantskih

n/a n/a n/a n/a n/a n/a 02/11/15 02/13/15 02/13/16 12/01/14 n/a n/a n/a n/a n/a 01/30/15 02/05/15 02/05/16 n/a n/a n/a n/a n/a n/a 02/05/15 02/10/15 02/10/16 n/a n/a n/a n/a n/a n/a 02/11/15 02/11/15 02/11/16 konsultantskih usluga "MR "CFG d.o.o.", Belgrade, Serbia 12/01/14 n/a n/a n/a 01/23/15 01/30/15 01/30/15 02/05/15 02/05/16 n/a n/a n/a n/a 06/02/15 06/08/15 06/08/15 06/10/15 06/10/16 Ana Davidovic n/a n/a n/a n/a 06/05/15 06/16/15 06/16/15 06/17/15 06/17/16 n/a n/a n/a n/a 05/15/15 05/22/15 05/22/15 05/26/15 05/26/16 n/a n/a n/a n/a 05/15/15 05/22/15 05/22/15 05/26/15 05/26/16 n/a n/a n/a n/a 05/19/15 05/22/15 05/22/15 05/22/15 05/22/16 "Knjigovodstvena agencija V2", Belgrade, Serbia n/a n/a n/a n/a 07/06/15 07/13/15 07/13/15 07/15/15 12/15/15 n/a n/a n/a n/a 10/27/15 12/03/15 12/03/15 12/04/15 06/04/16 n/a n/a 03/11/16 04/11/16 n/a n/a n/a 04/18/16 08/18/16 n/a n/a 03/11/16 04/11/16 n/a n/a n/a 04/18/16 08/18/16 n/a n/a 04/15/16 05/16/16 n/a n/a n/a 05/23/16 09/23/16 n/a n/a 04/15/16 05/16/16 n/a n/a n/a 05/23/16 09/23/16 n/a n/a 05/20/16 06/20/16 n/a n/a n/a 06/28/16 10/28/16

n/a n/a 05/20/16 06/20/16 n/a n/a n/a 06/28/16 10/28/16