Perched Box Caisson Overview. January 2014

Similar documents
PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

FP McCann Tunnels and Shafts 1

CAISSON SHAFT SYSTEM

TECHNICAL MEMORANDUM 002 EMORANNO. 001

3. Types of foundation

BRUCE HAMMER SUCCESS STORY, BRIDGE PILING Model SGH-4719 Pile Hammer (Max. Energy 89.3 ton.m)

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

tunnels & shafts brochure

Construction Dewatering

FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017

Item 404 Driving Piling

Annex E Bridge Pier Protection Plan

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

MIRABAY PILOT PROJECT REPORT

FITNESS, SAFETY & MEDICAL SUPPLIES

Fish Friendly Crossings- Examples from Nash Stream

S110 Steel Level Panel Installation Instructions

Constitution Instructions

Components of a Barrage

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

A CASE STUDY ON UNDERWATER CONSTRUCTION

Civil Application Solutions

Rio Intersection Traffic Restrictions Begin Monday

Barricades and Falling Object Protection Plans

SPECIFICATION FOR CAISSON CONSTRUCTION

THOR 10 HAMMER CAGE INSTRUCTIONS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

LAZY RIVER 3 3 PUMP LOCATION

TARPON A Minimal Facilities Platform

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Proper Operation of Heath Consultants Incorporated Plunger Bar

Troyer s Gourd Rack 8 unit F R H O P

Bore-Gard Installation - 1,000 ft. Perry, Oklahoma

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D.

Log Balance Beam. Product: (4 ), (6 )

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

Model: 5100 OmniSteel Volleyball System

Beavers are particularly adept at manipulating their

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

American Flagpole & Flag Co. 1(800)

SETTING UP THE MODEL 210B SRA

Special Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following:

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.

SPECIAL LAUNCHING METHODS

force tension suspension bridge anchorage cables compression caissons Towers deck

STEEL TRENCH SHIELDS DW MODELS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Talybont Deep Adit. A photographic Tour

Statnamic Load Testing Using Water as Reaction Mass

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

-FRU FREEZE RESISTANT WATER VALVE COOLERS SYSTEM

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION

Appendix J: Q1-Highway 35 Route Construction Plan

Slide 1 / What is the density of an aluminum block with a mass of 4050 kg and volume of 1.5 m 3?

Page 1 of 5 11/18/2013 9:17 AM

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water.

Huntington District. For More Information Contact (304)

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

CHEMICAL. Straight cut rod is provided in the materials listed below and includes nuts / washers.

Bridge Failures in Alberta

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN

Restoring Fluid Flow in Tubing Strings

RST INSTRUMENTS LTD.

Safety Tips from the WorkSafe People

Lecture 8&9: Construction Dewatering

Inflatable Packers for Grouting 11/10/00

Gerald P. Oliveto, P.E. George Franz NJDOT

BoatWasher Swede, , MS Float

Introduction of world construction methods and trends. Franz-Werner Gerressen, Head of Method Development, Tokyo,

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

Right Sizing VE Studies CSVA Conference. Markham, ON October 27, BRIAN RUCK, P. Eng., C.V.S. AECOM Canada

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson

MSA Confined Space Entry Equipment

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015

BENEFITS OF TIGHTER ANCHORING SYSTEMS

Swim Spa Pre-delivery Guide

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL

CMT Multilevel System Assembly Manual

Getting a. Bridge Built

Float operated valve TYPE (SWDS)

KCRC Ma On Shan Line. Railway Development in Hong Kong. Tai Wai Station and Maintenance Centre

GENERAL HEALTH AND SAFETY REQUIREMENTS

BOY, OH, BUOY, ARCHIMEDES PREVAILS. I. Introduction

Advantage Lockers & Bike


SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

REVISED SILT CURTAIN DEPLOYMENT PLAN

TRENCH AND EXCAVATION COLLAPSE

Successful slope stabilization under severe conditions

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Students questions regarding the future of the Zoar Levee and the town of Zoar in Black

Transcription:

Perched Box Caisson Overview January 2014

Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur outside the in water work period because, unlike a coffer dam, the river bottom is not disturbed. The technique reduces environmental impacts and cost, and allows more schedule flexibility

Sheet pile wall Steel piling Concrete slab Drilled shaft with rebar, concrete, and steel casing

Step 1: Build Drilled Shafts In 2013 a subcontractor built four 10-foot diameter drilled shafts at each of the two main bents in the river (Bents 4 and 5). The drilled shafts will carry the weight of the bridge and traffic deep down into the solid rock under the silt and gravel of the river bottom. To build each shaft, the subcontractor first drilled a 10-foot round hole using a steel pipe, called a "casing," for the drill bit. When the bedrock beneath the river bed was encountered, a chisel weighing nearly 50,000 pounds was repeatedly dropped to break up the rock until a depth sufficient to support the bridge weight was reached.

Step 1: Build Drilled Shafts A crane lifted loose dirt and broken rock out of the hole as the drilling proceeded. A cage of steel reinforcing bars was lowered into the hole, and the hole was filled with concrete to finish the shaft. Because of the variable nature of the soil and rock beneath the river, no two shafts were of the same length. At Bent 4, the shafts extend approximately 70 to 85 feet beneath the river bottom, reaching depths of about 104 feet beneath sea level. At Bent 5, the bedrock is lower, and the shafts had to extend to almost 170 feet below sea level, or approximately 140 feet beneath the river bed.

Step 2: Assemble Box Caisson After the drilled shafts were completed, the project contractor assembled a box caisson around the shafts at each bent. At Bent 4, the caisson is about 108 feet long in the north/south direction (parallel to the river), 22 feet wide in the east/west direction (at right angles to the river), and 30 feet tall. The Bent 5 caisson is about 100 feet long by 22 feet wide by 30 feet tall. During assembly, the caissons have been supported on steel piles driven into the river bottom around the caisson during the in-water construction period. Each caisson has a concrete floor built in place around the drilled shaft casings. The caisson walls are built from steel sheet piling.

Perched Box Caisson Jacking rod Shaft rebar Shaft casing Hydraulic jack Lowering support beam Sheet pile wall Steel piling Concrete slab Water level Slab support beam River bottom Drilled shaft with rebar, concrete, and steel casing

Step 3: Sink Caisson Once each caisson is finished, it is lowered into the river using hydraulic jacks supported on piles around the caisson. Each caisson is lowered about 30 feet, with final elevation of the concrete floor at 4 feet below sea level. Water enters the caisson as it lowers into the river. As the caisson sinks, its floor will slide down along the drilled shaft casings.

Step 4: Anchor Caisson to Drilled Shafts After each caisson is sunk to its final elevation, divers working in the water inside the caisson connect the floor to the drilled shaft casings using "tiedown collars" and steel bolts. The tiedown collars are steel rings that are connected to the concrete floor and the steel casings. Rubber gaskets between the collars and the casings prevent river water from leaking into the caisson after the caisson is pumped dry. Divers working in the water outside the caisson attach the caisson to the surrounding piles. Once the caisson is securely connected to the shafts and piles, the jack system used for lowering the box is removed.

Perched Box Caisson lowered into position

Step 5: Dewater Caisson Next, the contractor pumps out the water that entered as the box was lowered into the river. Rubber gaskets between the collars and the casings prevent river water from leaking into the caisson after the caisson is pumped dry.

Perched Box Caisson sealed and dewatered Seals around drilled shafts

Step 6: Build Bridge Bent "In The Dry" Once the inside of the caisson is dry, the contractor will build the concrete bridge bent in the same way it would be done on land. First a crew installs steel reinforcing bars. Next, steel form panels are set up around the outline of the bent. Finally the forms are filled with concrete. When the concrete has cured, the form panels are removed. After forms are removed, workers apply a charcoal-colored stain to the concrete surfaces to give them an architecturally pleasing finish.

Perched Box Caisson ready for work Lowering support beam removed Shaft casing removed

River Pier Construction inside Perched Box Caisson Rebar installed

River Pier Construction inside Perched Box Caisson Concrete placed

Step 7: Flood Caisson After the concrete bent is finished, the contractor fills the caisson with water up to the level of the river outside the box. The purpose of flooding the caisson is to equalize water pressure on the inside and outside of the wall in order to remove the steel sheet piles that make up the walls.

Perched Box Caisson allowed to flood

Step 8: Dismantle Caisson Once the caisson has been flooded, the contractor removes the sheet pile walls and support members. The caisson's concrete floor is left in place permanently attached to the bent.

Perched Box Caisson removed River Pier complete

Step 9: Finish Bridge Construction After the concrete bents are built, the bridge's steel arch and roadway support structure will be constructed on the finished bents. Finally, the concrete roadway deck and sidewalks will be placed on the steel roadway supports.

Steel arch rib Concrete river bent (pier)