Wind farm zone Borssele Project and Site Description 15 th December 2014

Similar documents
Offshore wind in COWI

Dutch tender system and future perspectives. Ir. F.C.W. (Frank) van Erp. Roadmap towards 4,500 MW offshore wind power in the Netherlands

Offshore grid NL. Hollandse Kust (noord) & Hollandse Kust (west Alpha) General project introduction. 14 september 2018

Hollandse Kust (zuid) Wind resource assessment. 17 January 2017 Anthony Crockford

REPORT DECISION. The scour protection shall be designed to avoid progressive collapse of scour protection edges.

Dutch offshore wind energy developments:

Strategic Advice about Floating LiDAR Campaigns. Borssele offshore wind farm

Morphodynamics of Borssele Wind Farm Zone

ASX Announcement. 27 February 2018 CETO Wave Energy Update

SFHGEN77 - SQA Code HD48 04 Perform first line calibration on clinical equipment to ensure it is fit for use

Background Paper: Surveys. Nord Stream 2 AG Sep-17

UNEXPLODED ORDNANCE (SEPARATING FACT FROM FICTION)

MEMO CC: Summary. ESMWT16419: _MEM_RVO_HKZ floating LiDAR uncertainty_v3.docx 1/8

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

WINDSPEED. Resultat og erfaringer med MSP. 26. september 2013 Hans Chr. Sørensen, SPOK ApS. Contract number: EIE/07/759/S

FRØYA SEAWATCH WIND LIDAR BUOY PRE-DEPLOYMENT VALIDATION

Life Extension of Mobile Offshore Units

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

DEPARTMENT OF TRANSPORT

Connecting wind energy THE OFFSHORE GRID IN THE NETHERLANDS

FRONTIER AND OFFSHORE REGULATORY RENEWAL INITIATIVE (FORRI) PROPOSED POLICY INTENTIONS FOR PHASE 3 OF THE FRAMEWORK REGULATIONS

ENERGY YIELD PREDICTION AN OFFSHORE GUIDE

EBA s REVIEW OF THE IRB APPROACH

G+ Global offshore wind health and safety organisation

Scour and Scour Mitigation

TRACK RECORD SEP. 2018

Offshore Wind Energy Potential for the United States

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

FAIRway Danube. a milestone for the realization of the Masterplan of the Danube and its navigable tributaries , Katja Rosner / viadonau

THE HORNS REV WIND FARM AND THE OPERATIONAL EXPERIENCE WITH THE WIND FARM MAIN CONTROLLER

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

OFFSHORE CREDENTIALS. Accepted for wind resource assessment onshore and offshore by leading Banks Engineers, globally

Taking Stock: Building an Offshore Wind Research Agenda for the U.S. Industry

Wave Hub Update All Energy 21/22 May Stuart Herbert Commercial Director

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI

Wind Farm Blockage: Searching for Suitable Validation Data

JCOMM Technical Workshop on Wave Measurements from Buoys

Rig move Code of Practice (COP) and Scope of Work (SOW)

Accelerate Your Riverbed SteelHead Deployment and Time to Value

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

Recalibration of gas meters

Helicopter Safety Recommendation Summary for Small Operators

UXO Below: Mitigating Marine UXO Risk

Technical Specifications (In-Cash Procurement)

Technology and innovation challenges for UK Offshore Wind Energy Andrew Scott

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Hydrodynamic and hydrological modelling to support the operation and design of sea ports

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

PITCH IMPROVEMENT PROGRAMME

US Navy Wave Energy Test Site. Kaneohe, HI

Assessment and operation of Wind Turbine Installation Vessels.

University of Iowa External/Central IRB Reliance Process Standard Operating Procedure (SOP)

22 November 2016 OFFSHORE WIND EUROPE. Offshore wind smashes $100/MWh. Tom Harries

FINAL REPORT UPWIND 1A2 METROLOGY

Department of Mineral Resources New South Wales

Results and conclusions of a floating Lidar offshore test

MARITIME EMSA 3 A STUDY ASSESSING THE ACCEPTABLE AND PRACTICABLE RISK LEVEL OF PASSENGER SHIPS RELATED TO DAMAGE STABILITY SAFER, SMARTER, GREENER

Climate Change Impacts to KSC Launch Complex

The Orkney Creel Fishery

Product highlights Variable frequency and thrust

CHALLENGES IN UXO-DETECTION: COMBINING DIFFERENT GEOPHYSICAL TECHNIQUES WITHIN UXO INVESTIGATION & CLEARANCE

IMCA Update 2018 Adding value to DP operations

Farm Animals Breeding Act 1

Vestas Cold Climate Solutions and next stepsclimate Offerings

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

CONDUCT OF MOBILE DRILLING RIG SITE SURVEYS. Volume 2

Contributions from a multidisciplinary university Finn Gunnar Nielsen Professor Geophysical Institute

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Good Morning everyone, I will be talking this morning about the review and restructure of Cruise Whitsundays Safety Management Systems.

Why walk? Introducing Heart Foundation Walking! What is Heart Foundation Walking? Your role. Host Organisation

Absolute number of signed Memorandum of Agreement (MOA) or Notice of Award (NOA)

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

1.1 The Facilitator began the 7th meeting by reviewing the SLG Team s actions from the 6th SLG meeting on 1 st February 2013.

BSAC Strategic Plan. January 2016 December National Governing Body for scuba diving and snorkelling

Deployment Strategies

RULES FOR CLASSIFICATION. Yachts. Part 5 Ship types Chapter 3 Passenger yachts. Edition October 2016 DNV GL AS

Safe Saf r Cy r Cy ling Programme

GL GH Offshore Wind Measurements

Offshore Energy Årsmøde Offshore Wind Energy in Europe

Fukushima Floating Offshore Wind Farm Demonstration Project ( Fukushima FORWARD )

INSPECTION & NON-DESTRUCTIVE TESTING

Fishery Improvement Projects

Revised Policy Intention for the Framework Regulations

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Fishery Improvement Projects

Carbon Trust Offshore Wind Accelerator. OWA floating LiDAR campaign: Babcock trial at Gwynt Y Môr Copenhagen, 11 March 2015 Megan Smith

Challenges of up-scaling to a grid connected array. PECC Energy Transition June Arturo Troncoso, Director CWE Chile

Combined Wave and Wind Fatigue Damage for Offshore Structures

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS

Data Protection Policy [01/01/2016]

OCTOBER 2018 EXECUTIVE SUMMARY

Pressure Vessel Program

A Comparison of the UK Offshore Wind Resource from the Marine Data Exchange. P. Argyle, S. J. Watson CREST, Loughborough University, UK

Research Involving Human Subjects: AA 110.7

Offshore Micrositing - Meeting The Challenge

Traceable calibration of automatic weighing instruments in dynamic operation

Design of Spillway Upgrades

Tender Management at SEBA Hydrometrie GmbH & Co. KG

Transcription:

Status and progress of site studies carried out for the Borssele wind farm zone Wind farm zone Borssele Project and Site Description 15 th December 2014 Ruud de Bruijne RVO.nl Maarten Timmerman BLIX

This presentation aims at providing insight in the progress of the site investigations that are carried out for the Borssele wind farm zone Contents Presentation 1. Introduction 2. Planning and progress 3. Borssele wind farm zone 4. Desk studies carried out 5. Site Investigations in progress 6. Process & Quality Assurance 7. Project & Site Descripton 8. Next steps coming months 9. Questions to the market

Energy Agreement: deployment of 3,500 MW new offshore wind. First wind farm sites will be tendered at the Borssele wind farm zone. 1. Introduction 3 Wind farm zones First tenders: Borssele 1,400 MW in 4 sites 2015: 2 x 350 MW / 2016: 2 x 350 MW Government provides site data and consent. TenneT (TSO) provides grid connection with substations in the wind farm zone Objectives site data: Provide developers and other interested parties with information regarding the conditions of the Borssele wind farm zone. Provide information required for EIA and Wind farm site decisions.

The progress of the studies and investigations is on target for the delivery of the information package for first tender in Q4 2015 2. Planning and progress Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1 2016 Execution desk studies Geological Desk Study UXO desk study Archaeological desk study Morphodynamical desk study Metocean data desk study Wind Resource Assessment Publication Proj. Descr, (1 st Rev.) European Tender Soil Investigations Execution geophysical survey Execution geotechnical survey Certification Publication Proj. Descr. (2 nd Rev.) Wind measurements Open first tender Today

Several pipelines and cables cross the Borssele wind farm zone, these exclusion zones determine the shape of the wind farm sites 3. Borssele wind farm zone

The Borssele wind farm zone will be divided into four wind farm sites. Site I and II will be tendered in 2015, sites III and IV in 2016 3. Borssele wind farm zone 2016 2015

Desk studies that have been carried out, indicate that there are no specific constraints for developing offshore wind farms 4. Desk Studies carried out Desk studies Geology and Geomorphology (CRUX) UXO (REASeuro) Archeology (Vestigia) Morphodynamics (Deltares) Metocean (Deltares) Supporting studies Wind Measurement Program Assessment (DNV-GL) Certification (DNV-GL)

Information on the overall stratification and the soil conditions at the wind farm zone is scarce, no specific constraints identified so far 4.1 Geology and Geomorphology (CRUX) Top of the Pleistoscene Top of Tertiair

The Borssele wind farm zone can be considered an UXO risk area. When proper UXO management is implemented, risks are not critical 4.2 Unexploded Ordnance (UXO) (REASeuro)

Prehistoric sites are not likely to be found. Historic wrecks could be present within the wind farm zone 4.3 Archaeological desk study (Vestigia)

The soil morphology at the site is highly dynamic, this should be taken into account when designing foundations and cable layouts 4.4 Morphodynamics (Deltares)

Meteorological and environmental parameters have been specifically determined for each wind farm site, taking into account local variances 4.5 Metocean (Deltares)

There are several measurement stations that can be used for the determination of wind resources at the Borssele wind farm zone 4.6 Wind measurement program assessment (DNV-GL)

Carrying out measurements with a floating LIDAR contributes to bringing down the uncertainty bandwidth of wind resource calculations 4.6 Wind measurement program assessment (DNV-GL)

The site investigations that are carried out offshore are all in the European public procurement process 5. Site Investigations ongoing / preparation Geophysical site investigation Geotechnical site investigation Wind & Metocean Measurements

Four framework contracts are about to be signed this month. Execution of the investigation to start January / February 2015 5.1 Geophysical site investigation

Four framework contracts are about to be signed this month. Execution of the investigation to start March / April 2015 5.2 Geotechnical site investigation

The tender for the wind measurements is planned to be published this month, the measurement campaign is planned to start Q1 2015 5.3 Wind measurements Source: offshorebizz.com

Several quality checks have been implemented in order to provide a complete and reliable information package 6. Process and Quality Assurance Project management: RVO & BLIX Market consultations and workshops Review of scope descriptions by internal and external experts Verification of scopes by certifying body Review of results by project team and experts Statement of compliance by certifying body

The project and site description document includes an introduction to the regulatory framework and an overview of all results obtained so far 7. Project and Site Description

The coming months the offshore site investigations will start. The results of these investigations will be used for updating studies 8. Next steps Execuction geophysical site investigation Procurement & execution geotechnical site investigation Procurement & execution wind resource assessment Update morphodynamical desk study Create Geological Model Procurement & execution wind measurements Update wind resource assessment Update project & Site description

The market is invited to provide feedback on the work that has been carried out and to inform RVO.nl on preferred information updates 9. Questions for the market A. I. Are there subjects missing? II. Procedure: e-mail remarks until January 2015. RVO will decide whether to include this in updates of the desk studies or new investigations B. Which next consultations do you prefer? Our milestones of 2015: I. Results geophysical survey and scope of geotechnical survey II. Results of the geotechnical surveys and scope of updates III. Publication of the updates. C. Would market parties prefer dedicated 0,5 or full day workshop(s) of specific subjects where the authors give extensive presentation about the report and how to use the info i.e. FEED? If so: which subjects? Morphodynamics, archaeological etc.

QUESTIONS?