NYCBS December 2014 Monthly Report

Similar documents
NYCBS November 2014 Monthly Report

NYCBS August 2014 Monthly Report

NYCBS April 2014 Monthly Report

NYCBS March 2014 Monthly Report

NYCBS January 2014 Monthly Report

NYCBS January 2015 Monthly Report

NYCBS August 2015 Monthly Report

NYCBS September 2015 Monthly Report

NYCBS December 2015 Monthly Report

NYCBS October 2015 Monthly Report

NYCBS September 2013 Monthly Report

March 2016 Monthly Report

January 2017 Monthly Report

October 2016 Monthly Report

NYCBS October 2013 Monthly Report

Table of Contents. January 2016 Monthly Report

NYCBS July 2013 Monthly Report

May 2017 Monthly Report

September 2017 Monthly Report

April 2018 Monthly Report

January 2019 Monthly Report

November 2018 Monthly Report

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

REQUEST FOR PROPOSALS TULSA BIKE SHARE SYSTEM APPENDICES

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

Planning Transit Operations and Bike Sharing Denver RTD. Bill Van Meter, Assistant General Manager, Planning March 23, 2012

BICYCLE SHARING PROGRAM DEVELOPMENT. CUTR Webcast Series June 27, 2013

Overcoming the Challenges of Winter Bike Share. Phil Goff, Sr. Associate and Director of Bike Share Services 2/3/15

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

STAFF REPORT SAUSALITO CITY COUNCIL

TORONTO TRANSIT COMMISSION REPORT NO.

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Public Bike Share Schemes. 14 December 2017

1999 On-Board Sacramento Regional Transit District Survey

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

2012 Transit Study Randolph County

CBTL Job Postings. The Track Manager will be responsible for evening and weekend work on a flexible and changing schedule.

Multimodal Transportation Plan

DAILY TRIPS (OUTBOUND) Monday-Friday 6:45 AM to 7:40 PM 30/30/30 26 Saturday 6:45 AM to 6:40 PM 30/30 24 Sunday - - -

Next Steps Staff report to Council on October 2, 2018 to present the Whistler 2018 Transportation Action Plan Final Draft

GOLD COAST TRANSIT DISTRICT SHORT RANGE TRANSIT PLAN FY 2015 FY 2019 APPENDICES

TAC February 1, 2012 Prepared by Metro Bike Program

RULES & REGULATIONS PERTAINING TO THE ADMINISTRATION OF A BICYCLE SHARE PERMIT PROGRAM BY PUBLIC WORKS. Effective Date: October 2, 2017

Los Angeles County Metropolitan Transportation Authority Metro Bicycle Roundtable

Rochester Area Bike Sharing Program Study

SCAG EMERGING REGIONAL ISSUES: GOMONROVIA OVERVIEW. City of Monrovia

Community Transit Solutions for the Suburbs APTA Annual Meeting Steve Fittante, New Jersey Transit Corporation September 30, 2013

Most Important Part of any Plan

A. Information on Bicycle Share Business

B. THAT Council direct staff to prepare by-law amendments to allow for Public Bike Share City-wide.

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Calgary Transit Route 302 Southeast BRT Year One Review June

Capital Metro Monthly Ridership Report September 2017 (Fiscal Year-end 2017)

Welcome. Wilmington Transit Moving Forward Workshop Presentation. October 16, 2013

LEGEND OAKS GOLF & TENNIS CLUB MEMBERSHIP PLAN & BY-LAWS

Flyaway Bus: GIS Analysis on Current and Potential Ridership, Revenue, and Prospective Stations

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Bike Share in the U.S.: 2017

Metropolitan Council Transportation Committee

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Public Bikesharing in North America: Early Operator and User Understanding

January Project No

MONTHLY RIDERSHIP AND PERFORMANCE REPORT. REVISED January 2016 Monthly Performance Report

Sacramento Metropolitan Air Quality Management District. Technical Working Paper #7: On-Going Evaluation Methods

Bike Share Expansion P LANS A ND P ROGRAMS C OMMITTEE J UNE 1 6,

Membership Rules & Regulations

CFE certification Bicycle-friendly Employer

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EAST VILLAGE SHOPPERS STUDY A SNAPSHOT OF TRAVEL AND SPENDING PATTERNS OF RESIDENTS AND VISITORS IN THE EAST VILLAGE

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

ALTERNATIVE MODES. Annual Report for Academic Year

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Is St. Louis Ready for a Bike Share System? May 14, 2014 Public Open House

AGENDA. Stakeholder Workshop

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Title VI Fare Change Equity Analysis

-TABLE OF CONTENTS. 8. Station Performance. 16 One Year Anniversary. 13 Promotions. 15 Press and Accolades. 3 Executive Summary.

Philadelphia Bus Network Choices Report

February 4, Community Meeting August 2, :30 6:10 Presentation

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

2018 MEMBERSHIP PACKAGE. 555 Moneta Ave. Timmins, ON P4N 7W9 Phone: (705)

Swift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit

Dynamic Cluster-Based Over-Demand Prediction in Bike Sharing Systems

Evaluation. Monitoring and 8.0

The University of Macau Rules of Bicycle Riding and Parking

O-D Study Transit Staff Workshop January 23, 2014

WALK- AND bike-friendly TURLOCK

Peterborough Council on Aging

Membership Descriptions & Application

Chapter Four NON-INFRASTRUCTURE RECOMMENDATIONS. 5 E s. 5 E s. Education. Encouragement. Enforcement. Engineering. Evaluation

Notes to Benefit-Cost Analysis

Grad Life 101: Navigating Campus and Testudo

Kitsap Transit Fast Ferry Schedule Survey

About Us. Boulder B-cycle is a community nonprofit (501c3) formed in May 2011 to implement, own and operate a public bikesharing system in Boulder.

Membership Rules & Regulations

Street Paving and Sidewalk Policy

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

Transcription:

NYCBS

Table of Contents 1. Executive Summary... 3 2. Membership... 3 3. Ridership... 3 4. Environmental Impact... 4 5. Rebalancing Operations... 4 6. Station Maintenance Operations... 4 7. Maintenance Operations... 4 8. Incident Reporting... 4 9. Customer Service Reporting... 4 10. Financial Summary... 5 11. Service Levels... 5 Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 2

1. Executive Summary After a strong summer riding season, as we entered winter ridership has declined. In December Citi Bike riders took 437,456 trips and traveled 615,387 miles. There were an average of 14,111 rides per day. On average, each bicycle in the system had approximately 3.5 rides per day. 702 annual members and 6,808 casual members signed up or renewed during the month. Total annual membership stands at 88,405. There were 325 active stations at the end of the month. Our average number of active bikes was 4,077. Fleet size at the end of the month was 3,716. 1 We have continued to bring bikes in to our repair shop for annual maintenance and will have fewer bikes available on-street through the end of March. There were no snow or weather events that impacted the system during the month. NYCBS rebalanced 36,804 bicycles in December, averaging 1,187 bicycles moved per day. In December, there were 968 reported bicycle maintenance issues that were addressed through inshop maintenance. There were 50 reported cases of vandalism (including graffiti) to the stations and bicycles. There were 23,873 empty and full instances during operational hours. Per NYCBS service level agreements, peak availability was 95% for the month and off-peak availability was 97%. In December, there were 10,799 total customer service calls and 1,101 emails. We had approximately 2.5 customer service calls per 100 rides. The gross revenue for December 2014 was $159,140. 2. Membership Citi Bike had 702 annual members sign up or renew during December 2014. There were 6,218 one day memberships in December and 590 seven day memberships. 3. Ridership There were 437,456 trips in December 2014. Annual members accounted for the vast majority of the trips, recording 419,466 trips vs. 17,990 trips for casual members. Citi Bike riders traveled a total of 615,387 miles with an average miles traveled per trip of 1.4. Ridership was generally higher on weekdays, but casual ridership was highest on weekends. December 4 was the highest day for ridership with 22,910 rides. The most popular origins and destinations continue to be stations near large transit hubs, including the stations near Penn Station and the Port Authority, Pershing Square, and the area around Union Square. As has been the pattern, the least frequented destination stations are in Brooklyn. 2 1 Day by day fleet size counts can be found in the December 2014 Domo page. In accordance with the revised contract between NYCBS and the City of New York, NYCBS began to remove bikes from the street in November for winter maintenance. 2 Station by station ridership information can be found on the Trips by Origin and Trips by Destination cards in Domo Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 3

4. Environmental Impact Citi Bike riders traveled 615,387 miles in the month of December. Citi Bike riders burned a total of 24,615,480 calories for the month. Using our calculation, we find that Citi Bike offset 320,001 pounds of carbon in December 3. 5. Rebalancing Operations NYCBS staff rebalanced a total of 36,804 bicycles during the month of December. In addition to our truck rebalancing, re-balancers using bicycle trailers moved bicycles near Penn Station, Port Authority Bus Terminal and Grand Central Station. There were 23,873 total empty and full instances. Peak availability was 95% (SLA target level is 98%), without including whether the next closest station was full of empty. Non-peak availability was 97% (SLA target level is 96%). 6. Station Maintenance Operations There were 325 active Citi Bike stations at the end of December. Technicians made a total of 670 station visits to address dock and station field maintenance orders. There were 449 reported station malfunctions and 221 reported dock malfunctions. Reboots, battery swaps, and docking point repairs were the most common FMO types. Station uptime for the month was 99%. 7. Maintenance Operations The bike shops at the Farley Building and Sunset Park completed 968 bicycle repairs in December. 4,163 total unique bikes were checked or repaired during the month. 8. Incident Reporting In December, there were 50 reported instances of vandalism to bikes and stations, including stickers, graffiti, and damage to stations or bicycles, which were addressed either by NYCBS field staff or a third party cleaning vendor. There were no crashes reported to Customer Service by Citi Bike riders. 9. Customer Service Reporting In December, there were 10,799 total customer service calls in December. The NYCBS call center processed 9,457 calls with an abandonment rate of 2%. The overflow call center, which also takes overnight calls, processed 1,342 calls. Call volume for December was approximately 2.5 calls per 100 rides. At NYCBS, the average time to handle a call was three minutes and twenty-six seconds with an average hold time of eleven seconds. NYCBS also received 1,101 emails. 3 See the Environmental Impact tab of the December 2014 Citi Bike Monthly Report spreadsheet for detailed calculations Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 4

10. Financial Summary 4 Revenue Categories Total Membership: Annual 89,408 Membership: Daily 57,103 Membership: Weekly 6,200 Overages: Annual 4,320 Overages: Casual 37,237 Other revenue 3,994 Refunds and Discounts (39,121) Total $159,140 11. Service Levels Ref Name 1 2 3 4 Station Inspection and Litter Removal Station and Cleaning Maintenance Station Cleaning After Discovery or Notification Service Level Agreement Every station is inspected two times per week. All litter is removed two times per week. All defects are entered into the NYCBS database to be cleaned within 24 hours (station) or 96 hours (bicycle). In addition to Reference 1, every station, as well as bicycles present, is cleaned and wiped down once every 14 days. In addition to Reference 1, every bicycle receives a full mechanical check at least once every calendar month. Maintenance for any individual bicycle must be conducted at least 10 days apart. Stations must be cleaned within 48 hours of discovery or notification (by DOT, 311, NYCBS call center, etc.). Cleaning includes but is not limited to full wipe down and graffiti, scratchiti, and sticker removal. Performance Level Actual Performance 94% of stations were inspected and had litter removed twice a week. Performance was for December. of bicycles were given a full mechanical check in the field or depot. NYCBS cleaned 96% of stations within 48 hours after notification. 4 These are preliminary revenue figures and not audited Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 5

Ref Name 5 7 8 9 6 10 Cleaning After Discovery or Notification Emergency Station Repair or Removal Station Deactivation or Removal Station Reactivation or Replacement Snow Removal (Shut Down) Snow Removal (No Shut Down) Service Level Agreement Operator must clean bicycles or remove them from the system within 96 hours of discovery or notification (by DOT, 311, NYCBS call center, etc.). Cleaning includes but is not limited to full wipe down and graffiti, scratchiti, and sticker removal. In the event of an emergency, a station must be repaired or removed as soon as possible, but no later than 12 hours after notification by DOT. To accommodate public works and other events, a station must be removed the later of (i) 48 hours after notification by DOT and (ii) 24 hours before the event start. To accommodate public works and other events, a station must be deactivated the later of (i) 12 hours after notification by DOT and (ii) 12 hours before the event start. Every station must be replaced within 24 hours or reactivated within 12 hours after the end of the event or emergency, as determined by DOT. If the program is shut down due to snow event: Equipment must be operational and reasonably free of snow within 5 hours of the program's reopening. If the program did not shut down due to snow event: Equipment must be operational and reasonably free of snow within 12 hours of end of snow event. Performance Level 97% 99% Actual Performance NYCBS cleaned or removed from service 11% of bicycles within 96 hours after notification. NYCBS ability to clean bicycles in the required timeframe is limited by the lack of remote bicycle lockdown functionality. There were no emergency station repairs or removals in December. of stations were deactivated or removed within the required timeframe of stations were reactivated or replaced within the required timeframe There were no snow events that resulted in system shut down during the reporting period There were no snow events during the period. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 6

Ref Name 11 Station Uptime 12 13 Website Availability Central Computer System Outage 14 Fleet 15 Operational Docks Service Level Agreement Stations must be fully functional including all communications and transaction systems, excluding major upgrades to the Central Computer System providing that NYCBS has given reasonable advance notice to DOT and the customers of the program. Website must be fully functional. This includes but is not limited to the ability to: process transactions, provide real-time data and map; and provide subscriber account information, such as rental histories. The Central Computer System must be fully functional. The operator will ensure that all bicycles are in circulation as agreed upon by all parties. The bicycle fleet size shall not go below 90% of the program fleet from December to January, and shall not go below 70% between January and December. Docks must be repaired within 48 hours of discovery or notification of a defect. Defect includes but is not limited to the ability to rent and receive bicycles from all user types and full functionality of all communications and transaction systems. Performance Level 97% 70% (but 50% per new agreement) 99% Actual Performance Stations were operational for all transaction types 99% of the time for the month. There were no reported website outages during the reporting period There were no reported Central Computer System outages during the reporting period Average fleet size for the month was 4,077 (68%). Breakdown of daily fleet size can be found in the accompanying spreadsheet. NYCBS and DOT agreed that in December NYCBS could begin to remove bikes beyond the 70% level in accordance with the parties new contract. NYCBS repaired 73% of dock malfunctions within 48 hours. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 7

Ref Name 16 17 Peak Hours Rebalancing Non-Peak Rebalancing 18 Call Center 19 Delivery of Reports Service Level Agreement s shall be redistributed throughout the system as necessary to meet demand. The number of bicycles at any station during peak hours (peak hours being defined herein as 8 am to 8 pm Monday through Friday) shall not be completely full or completely empty. [sic] Liquidated damages shall not be assessed if the next closest station in any direction is not full or empty during the same period of time. s shall be redistributed throughout the system as necessary to meet demand. The number of bicycles at any station during nonpeak hours (non-peak hours being defined herein as 8:01 pm to 7:59 am Monday through Friday as well as Saturday and Sunday) completely full or completely empty. [sic] The call center within New York City limits will answer a minimum of 80% of the calls each year from, at a minimum, 7 am to 7 pm, 365 days a year. The operator will provide all reports on the agreed upon schedule. Performance Level 96% 80% Actual Performance Stations were available 95% of the time during peak hours. NYCBS does not have a system for calculating whether the next closest station was full or empty. Stations were available 97% of the time during non-peak. The NYCBS Call Center handled 88% of total volume for the month. Delivery of this report is considered completion of this service level agreement for the month (for this monthly report, in consideration of new ownership, NYCBS was granted a submittal extension). Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 8