Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Similar documents
The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

M6 Junction 10 Public Consultation

M25 junction 28 improvement scheme. Have your say

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Highways England Creative GFD18_0125. Welcome. Upgrade to smart motorway junctions 3 to 12

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Stoke Mandeville Parish Council 17 April 2018

Roads and public rights of way

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

CUERDEN TRANSPORT PROPOSALS

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

Chelmsford City Growth Package

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

M6 J7 Rushall Canal: Essential Repair Work Briefing

Upgrade to smart motorway Junctions 3 to 12

72 Crossrail Amendment of Provisions

Public Consultation Report December M6 Junction 10 Improvements

CAMBRIDGE SOUTH WEST PARK & RIDE

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015

Upgrade to smart motorway Junctions 2 to 4

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

A27 East of Lewes improvement scheme Have your say

Commonwealth Heads of Government Meeting: London 2018

A30 Chiverton to Carland Cross Moving forward: The application

Design Measures taken, or being taken to eliminate or reduce the hazard

A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

Smart motorway. M6 junctions 16 to 19

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

WHANGAREI IMPROVEMENTS

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

I-25 South Gap Project Monument to Castle Rock

MILTON ROAD LLF PROJECT UPDATE

Welcome to the Open House

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Tonight is for you. Learn everything you can. Share all your ideas.

DRAFT INTERIM ADVICE NOTE 150/17

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

M20. Upgrade to smart motorway Junctions 3 to 5

Tackling congestion by making better use of England s motorways and trunk roads

Temporary Vehicle Restraint System Policy

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Sevenways Roundabout, and the need for a Road Safety Scheme:

Know your smart motorways M60/M62, Greater Manchester

Bramshaw traffic calming proposal

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

MARKHOUSE ROAD IMPROVEMENTS

LET US KNOW WHAT YOU THINK

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Application No: MO/2018/0004 Location: Land at Langley Vale, South of Downs Road and east of Headley Road, Headley, Epsom

M6 junction 16 to 19 Smart motorway project newsletter

TRANSPORT AND MOVEMENT

A6 Manchester Airport Relief Road

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

M23. Upgrade to smart motorway Junctions 8 to 10

Technical note. 1. Introduction

Appendix A Type of Traffic Calming Measures Engineering Solutions

Explanation of Draft Scheme of The Project for Upgrading of Kukum Highway

7.3 Traffic and Transport Impacts 15/10/2014

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

C.A.R.S. Project Design Report.

Upgrade to smart motorway Junctions 13 to 16

SH1 Western Belfast Bypass Transportation Assessment

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

INTERIM ADVICE NOTE 188/16

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

3. The prevalence and impact of traffic congestion and likely future trends

5 Highways and Transport Assessment

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Collision Site Investigation - Bodenham By-Pass Background

M1 Smart Motorways Junctions 32 to 35a

SCHEME DESIGN AND ENGINEERING

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

How do we design for pedestrians? Case study: transforming the Walworth Road

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Generic Safe Method for placing TTM on MM-ALR

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

NORTH HIGHLAND LAKE ROAD PROJECT

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Transcription:

Start of works exhibition November 2014 Welcome

Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519 A50 Bucklow Hill Hoo Green Mere e Hall Bentley Hurst Lane Chapel Lane A556 Bucklow Hill Lane A556 Mere A50 Moss Lane Over Tabley Junction 19 M6 A556 A5033 The Mere A5034 A50 Knutsford Services Rostherne Cicely Mill Lane Tatton Dale Tatton Park Knutsford Crown copyright and database rights 2014 Ordnance Survey 100030649 Crown copyright and database rights 2014 Ordnance Survey 100030649 Diagrammatic

The scheme The A556 links north Cheshire and Greater Manchester with the West Midlands. The scheme will improve a 4.7 mile (7.6 Km) section connecting M6 Junction 19 near Knutsford with the M56 Junction 7 near Bowdon, which passes through Over Tabley, Mere and Bucklow Hill. This section forms part of the strategic road network, but is the only non-motorway link between Manchester and Birmingham. Its improvement will bring significant benefits to strategic traffic between the M6, south Manchester and Manchester International Airport. The A556 currently suffers from congestion, unreliable journey times and a poor safety record. The road has been identified as one of the most congested roads in England. The existing road is mainly single carriageway with two lanes in each direction, however there are small stretches of dual carriageway. It has numerous junctions, private accesses and field entrances onto the trunk road. Key scheme objectives Improve the local environment in Bucklow Hill and Mere Improve road safety and journey time reliability Reduce conflicts between long distance and local traffic Minimise the environmental impacts of the scheme, during construction and once open to traffic The proposals The scheme will improve the route to a consistent standard of modern dual carriageway to achieve these objectives. The main aspects of the design include: Construction of a new section of the A556 from M6 Junction 19 to north of Bucklow Hill, to bypass Over Tabley, Mere and Bucklow Hill (the offline works) of the existing A556 north of the new bypass, to the M56 (the online works) of the layout of M56 Junction 7 at Bowdon Creation of junctions allowing local traffic access to the new A556 Narrowing of the bypassed section of the A556 (the de-trunking works) and changes to side road connections Measures to mitigate environmental impacts of the scheme and improve the local environment

Timeline 2014 2015 2016 2017 Autumn Winter Spring Summer Autumn Winter Spring Summer Autumn Winter Spring Summer Autumn Winter Mobilisation Enabling works and environmental mitigation Structures Utilities diversions Earthworks season 1 Side road realignments Earthworks season 2 Roadworks and pavements Finishing works Detrunking works New A556 open to traffic

Mainline works The new dual carriageway will consist of 2 lanes in each direction separated by a concrete safety barrier in the central reservation. New junction at M56 junction 7 General scheme features: Junctions the existing A556 has numerous direct accesses and junctions which contribute to accidents. The new road will have junctions which are different levels and roundabouts which will be safer. Technology variable driver information signs will be provided to warn of incidents on the new road and surrounding network. As an interim measure there will be a speed limit of 60mph on the new road to mitigate air quality impacts. As soon as air quality improves the speed limit will be increased to 70mph. New vehicle checkpoint facility will be provided for the DVSA (formerly VOSA) on Bowdon roundabout to replace existing facility near Cheshire Lounge. Provision of a re-modelled M56 junction 7 providing free flow link between the M56 and the A556 Some facts and figures: 18 miles of new drainage 1 million square cubic meters of earth to move laying 130,000 tonnes of tarmac erecting 19 miles of fencing up to 300 people employed on the construction site.

Construction methods Construction methods will follow latest best practice and will be designed to have as little impact on the local residents, the environment and local infrastructure as possible. This will include: using silenced and low emission plant / machinery minimising transportation / HGV journeys screening temporary working lights to minimise light pollution to the surrounding areas road-cleaning prohibiting fires and providing noise screening where appropriate and feasible. Working hours general site hours will be 7.30am to 6.00pm Monday to Friday and 8.00am to 1.00pm on Saturday out of hours working will be 1.00pm and 6.00pm on Saturday and 7.30am to 6.00pm on Sunday night time working will be between 9.00pm and 5.00am We anticipate some out of hours and night time working during the project, but we will endeavour to keep these to a minimum and will communicate with the local community through: the Highways Agency s website social media key liaison group meetings direct information to local councils / councillors letters to affected residents and businesses regular public newsletter Throughout the works, our primary objective will be the health and safety of the public and our workforce. Our aim is to deliver the scheme efficiently, with the minimum of disruption whilst achieving excellent health and safety standards.

Structures The scheme incorporates 7 new over bridges, 1 pedestrian underpass and refurbishment works to 2 existing bridges. One of the bridges which is approximately 500m south of the A50 adjacent to Belt Wood is a green bridge, which will provide a safe crossing point for wildlife and reconnect valuable ecological habitats severed by the new road, and will also carry an agricultural accommodation track. The green bridge is the Agency s first of this type of structure. A5033 A556 M6 Old Hall Lane Non motorised user underpass and retaining walls Over Tabley Junction 19 Moss Lane Tabley junction overbridge A556 Bentley Hurst Lane Bentley Hurst Lane overbridge A50 Mere Hall Mere The Mere Green/Accomodation overbridge A50 overbridge A556 A50 Hoo Green Bucklow Hill Chapel Lane overbridge Chapel Lane Millington Hall Lane Millington Lane overbridge Millington Lane Booth Bank M56 Diagrammatic Knutsford Services A5034 Cicely Mill Lane Bucklow Manor retaining wall Chester Road bridge (Refurbishment work to existing structure) A56 Rostherne Lane Junction 8 Knutsford Crown copyright and database rights 2014 Ordnance Survey 100030649 A50 Tatton Park Tatton Dale Rostherne Rostherne Mere Cherry Tree Lane Junction 7 Yarwood Heath Lane Bridge (Refurbishment work to existing structure) M56 M56 on-slip retaining wall Bowdon Roundabout Link overbridge A56 Yarwood Heath Farm Access Bridge (Refurbishment work to existing structure) Bowdon Plan of new structures to be built.

Traffic management during construction Closures or restrictions will be well advertised in advance on our website, social media and through local media outlets where possible. Diversion routes will also be published and local access will be maintained. Traffic management will be varied in scale, timing and detail and includes: provision of suitable access arrangements in and out of the site; overnight lane closures of the motorway and local roads to undertake bridge works; and overnight closure of the A556 to complete the tie ins between the online and off line works. Air quality and dust management Air quality around the construction site will be monitored whilst work is ongoing to ensure the project will not have a negative effect on the local environment. Noise impact Noise levels will be monitored to ensure that the effect on local people is minimised. Silenced plant and equipment will be used to mitigate noise levels and appropriate maintenance regimes will be in place. Screening will be used where possible. Traffic management arrangements and provisions will be planned to take into account local Tatton Park and Cheshire Show events.

Environmental mitigation The project will be carried out in a manner which will minimise the impact of construction on the surrounding environment. An environmental assessment covering a range of topics, including noise, air quality, ecology, cultural heritage, materials use and impacts on the landscape has been undertaken. The assessment identifies the key environmental issues. Following this assessment a number of mitigation measures have been incorporated into the design and construction methods, to avoid adverse impacts on the environment. A number of native species will need to be relocated to accommodate the scheme. These include the provision of: 6 bat hop overs to prevent low flying bats from being struck by vehicles 20 new ponds for great crested newts Impression of the new green bridge approximately 50 hectares of new habitat woodland 3 mammal tunnels to ensure safe passage for animals under the road construction of the first green bridge on a project of this scale to provide connectivity between habitats. Reusing the excavated material in the construction of the new road will reduce HGV movements on local roads. An extensive archaeology survey will be undertaken prior to the works to record for preservation, any features uncovered. The new alignment of the A556 will take traffic away from the communities of Bucklow Hill, Mere and Over Tabley. This reduction in traffic will provide an improvement in air quality for the surrounding villages.

Detrunking Works will be undertaken to de-trunk the existing A556. The de-trunked Chester Road will be reduced to a single carriageway after the opening of the new route. The existing southbound carriageway will become two lanes, one in each direction and the existing northbound lanes will be used to provide a shared pathway for pedestrians, cyclists and equestrians. Footway/cycleway/bridleway Bund Single carriageway road The redundant outside lane will be replaced with a mounded grass bund. The existing A556 will be renamed and re-classified to discourage its use by non-local traffic. There are two existing traffic light junctions within the section of Chester Road to be de-trunked. Works to these junctions are as follows: Mere Crossroads will be re-aligned and the A50 will become the main through route. Bucklow Hill Junction will be modified to accommodate the new flow of vehicular traffic utilising the left turn at Bucklow Hill onto the A5034.

The team Client/Employer Contractor Contractor s Designer Employer s Agents Local Highways Authority Employer s Valuation and Property Adviser

Contact us If you want to contact us or find out more about this project, you can: Visit the scheme web page at www.highways.gov.uk/roads/road-project/a556-knutsford-to-bowdon-improvement Email us: A556KnutsfordBowdon@highways.gsi.gov.uk Find us on Twitter: www.twitter.com/ha@hanews_nwest Call us on: 0161 930 5998 Write to us at: A556 Knutsford to Bowdon Project Team Major Projects Highways Agency Piccadilly Gate Store Street Manchester M1 2WD