PosiTector UTG, UTG-STD & UTG-ME

Similar documents
Calibration Procedure

Calibration Procedure

Calibration Procedure. PosiTest DFT Combo

DeFelsko PosiTector CMM IS Probe

Calibration Procedure

Calibration Procedure

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

Calibration Procedure

User's Manual. Heavy Duty Dissolved Oxygen Meter. Model

Bristol Fire Department Standard Operating Procedures. Multi Gas Detector

TECHNICAL MANUAL CALIBRATION INSTRUCTIONS FUEL PRESSURIZING & DUMP VALVE TEST STAND 1TL

PIPELINE AND HAZARDOUS MATERIAL SAFETY ADMINISTRATION CYLINDER REQUALIFICATION FACILITY INSPECTION REPORT GENERAL INFORMATION

Pneumatic high-pressure controller Model CPC7000

Liquid Handling Systems

Standard Operating Procedure

JOLLY2. Installation user s manual. 6 different operating modes selectable. version 3.3. DATA TO BE FILLED OUT BY THE INSTALLER (Page 1)

Technical Procedure for Instrument Calibration and Maintenance

Cover Page for Lab Report Group Portion. Head Losses in Pipes

PTB Ex PT Scheme. Procedure Instruction of program Explosion Pressure - Test Round 2017

Heavy Duty Dissolved Oxygen Meter

J12 TICKET DISPENSER HOPPER ALL STOP STOP 1 STOP 2 STOP 3 BIG DOUBLE SMALL TAKE PLAY START CURRENT PRODUCTION BOARD TYPE

AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP

INSTALLATION & OPERATION MANUAL. Dual Duct VAV Terminals. Redefine your comfort zone.

ali-q TM Gravimetric Verification Procedure

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

Operating Manual. BACVis. Manual BACVis. for. Sensors and MilliGascounter. Rev

Propane Conversion Kit Instruction

Owner s Manual Humiport 10/20

UNDERSTANDING, ACCELERATED

Introduction. The Shearwater Petrel is an advanced technical diving computer for open and closed circuit divers.

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

R1 Maule Aerospace Technology, Inc.: Amendment ; Docket No. FAA ; Directorate Identifier 98-CE-01-AD.

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

DO NOT PRINT THIS PAGE

THE FUNDAMENTALS OF THE AIR SAMPLER CALIBRATION-VERIFICATION PROCESS

PTG100 Precision Test Gauge

R1 Piper Aircraft, Inc.: Amendment ; Docket No. FAA ; Directorate Identifier 99-CE-013-AD.

Golf Team Challenge. Product: EA SPORTS PGA TOUR Software Version: Release Date: 10/18/06. Revised 4/21/2009

Propane Conversion Kit Instruction

PERFORM Operating Document

TABLE OF CONTENTS INTRODUCTION 3 SAFETY PRECAUTIONS 3 PACKAGE CONTENTS 4 DEVICE OVERVIEW 4 BUTTON OPERATION SUMMARY 5 BASIC OPERATION 6

CTG Certification Protocol -- Version 3.0 SUMMARY

E Lightband Compression Tool Operating Procedure

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin

Simrad GD10P Extended On-site Maintenance

White Paper. Chemical Sensor vs NDIR - Overview: NDIR Technology:

Optical Dissolved Oxygen Meter

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

STANDARD OPERATING PROCEDURES DIVISION OF COMPARATIVE MEDICINE UNIVERSITY OF SOUTH FLORIDA

SL G3. Warning

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR)

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

Technical Procedure for General Laboratory Equipment

8.1 Calibration of gas sensors

Operation manual Level sensor DC-LS-50 Operation Manual Level Sensor DC-LS-50

Built-in Purge Control Functions

Operating manual for the pressure transducer unit CCS 1000

DTG - LCD Digital Temperature Gauge USER MANUAL

Any use of this material except in accordance with a written agreement with Western Power is prohibited.

SL G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301

ABB MEASUREMENT & ANALYTICS DATA SHEET. WaterMaster FEW530 Electromagnetic water meter

CCPaSEC. Procedure for the Quality Control Yearly Equipment Check. July 2018 CCPaSEC Quality Control Team

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River

Dissolved Oxygen/Temp Waterproof Tester

Use this key to determine which sections of this Product Manual apply to your job.

FRDS GEN II SIMULATOR WORKBOOK

COMPACT AIR COMPRESSOR MODEL NO OWNER S MANUAL

SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302

WIKA INSTRUMENT CORPORATION

INDUSTRIAL HYGIENE GROUP Standard Operating Procedure. TVA-1000 PID/FID Portable Toxic Vapor analyzer. 1 of 9. Contents

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

DOscan10 Pocket Dissolved Oxygen Tester Instruction Manual

Air Diving Inspection of ABC Mock-Up Caisson Project 123

NIOSH Task Number 18388

DQM Annual Hopper QA Checks

TECHNICAL DATA. Q = C v P S

Adam Equipment. DENSITY DETERMINATION KIT for AAA, ADA and ADP SERIES BALANCES OPERATOR S MANUAL

English. English. Predictive Multi Gas for

TECHNICAL DATA. Q = C v P S

Pneumatic high-pressure controller Model CPC7000

Mr Roger Wood Measurement & Process Group (M&P) Network Strategy National Grid Gas plc Brick Kiln Street Hinckley Leicestershire LE10 0NA

SAUTER FK Version /2016 GB

BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL

Manual Weighingblock VB2 series and Uniscale

AIR FLOW ANEMOMETER INSTRUCTION MANUAL

Certified Accuracy. Ring Force Gauge. Models and Capacities Available. Design and Principle of Operation

Cover Page for Lab Report Group Portion. Pump Performance

deluxe toilet safety support

/2004 US/CA

TECHNICAL DATA. Q = C v P S

Requesting Team Activation

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

Standard Operating Procedure Measuring & Testing Equipment

Food and Drug Administration Division of Pharmaceutical Analysis. Mechanical Qualification of Dissolution Apparatus 1 and 2

ANTI-ENTRAPMENT PLAN

Digital Pressure Gauge Main features: Data Sheet: DFP.418.R4.EN

TECHNICAL MANUAL CALIBRATION PROCEDURE FOR PRESSURE GAUGE. This publication replaces T.O. 33K dated 30 January 2012.

Location of CC Number if not located with the identification:

User Manual PTW-DensiX. D / Di/Zi

Transcription:

Management Procedure 2585 Revision: E Date Issued: Feb 21, 2003 Date Revised: 14 August 2009 Calibration Procedure DeFelsko Corporation PosiTector UTG, UTG-STD & UTG-ME Ultrasonic Thickness Gage Table of Contents 1 Introduction and UUC Performance Requirements... 2 Table 1-1 Measurement Ranges... 2 Table 1-2 UUC Calibration Requirements and Description... 2 2 Measurement Standards and Support Equipment Performance Requirements. 2 Table 2-1 Calibration Environmental and Warm Up Requirements... 2 Table 2-2 Measurement Standards & Support Equipment Performance Requirements... 3 3 Preliminary Operations... 3 4 Calibration Process... 4 5 Performance Requirements... 4 Table 5-1 Performance Requirements and Calibration Data for PosiTector UTG... 4 Management Procedure Change Notice... 5 Management Procedure 2585 Rev. E 1

1 Introduction and UUC Performance Requirements 1.1 This procedure describes the calibration of the PosiTector UTG Ultrasonic Thickness Gage. Specifications for the gage-probe combination are shown in Table 1-1. Table 1-1 Measurement Ranges Gage-Probe Measurement Range * Velocity Range UTG with dual element transducer 0.040 to 5.000 1 to 125 mm 0.0492 to.3930 in/µs UTG with single element contact transducer 0.100 to 5.000 2.5 to 125 mm 1250 to 10,000 m/s * The actual measurement range of the system depends on the material being measured. Ranges shown are based on carbon steel. The unit being calibrated will be referred to as the UUC (unit-under-calibration). Table 1-2 UUC Calibration Requirements and Description (UUC) Function Performance Specifications Test Method Wall Thickness + 0.001 (+ 0.03 mm) Compare to Step Blocks 2 Measurement Standards and Support Equipment Performance Requirements 2.1 Minimum-Use-Specifications are the calculated minimum performance specifications required for the measurement standards and support equipment to be utilized for comparison measurements required in the Calibration Process. 2.2 The Minimum-Use-Specifications are developed through uncertainty analysis and are calculated through assignment of a defined and documented uncertainty ratio or margin between the specified tolerances of the UUC and the capabilities (uncertainty specifications) required of the measurement standards system. 2.3 The uncertainty ratio applied in this Calibration Procedure is 4:1 or better. Table 2-1 Calibration Environmental and Warm Up Requirements Measurement Standards & Support Equipment Environmental Requirements: Measurement Standards & Support Equipment Warm-up and Stabilization Requirements: Temperature: 23 5 C. Relative Humidity: Less than 95% None Management Procedure 2585 Rev. E 2

Table 2-2 Measurement Standards & Support Equipment Performance Requirements Minimum-Use-Specification Range Accuracy 0.040 to 5.000 0.00025 1 to 125 mm + 0.006 mm Equipment Generic Name Range Step Blocks 0.100 to 0.500 2.50 to 12.50 mm Actual Equipment Specifications Accuracy 0.00020 + 0.005 mm Manufacturer & Model Applicable PHTool Custom 5 Step Block Caution: The instructions in this Calibration Procedure relate specifically to the equipment and conditions listed in this section. If other equipment is substituted, the information and instructions must be interpreted accordingly. 3 Preliminary Operations Note: Review the entire document before starting the calibration process. 3.1 Visual Inspection 3.1.1 Visually inspect the UUC for: Damaged LCD display probe wear cracked or broken case missing probe cover, battery door or other parts proper identification 3.1.2 Damage or excess wear shall be repaired prior to beginning the calibration process. 3.2 Gage Reset Note: Please refer to UUC instruction manual for menu navigation instructions, details on features and operating instructions (i.e. required amount of couplant and pressure). 3.2.1 With the UUC powered off, select the hard reset feature by holding the + button until the Reset symbol (2 arrows) appears. 3.2.2 After reset, select the Main Menu Zero function and measure the zero plate attached to the probe. After zeroing, verify the probe on the 2.5 mm (0.100 ) and 12.5 mm (0.500 ) steps of the 5-step block. Allowable tolerances following zeroing are + 0.05 mm (0.002 ). Management Procedure 2585 Rev. E 3

4 Calibration Process Note: Whenever the test requirement is not met, verify the results of each test and take corrective action before proceeding. 4.1 Review the Performance Requirements Table 5-1 4.2 Select the 2-Pt Adjust feature from the Cal Adjust section of the menu. Perform a twopoint calibration using the 2.5 mm (0.100 ) and 12.5 mm (0.500 ) steps of the 5-step block. This will adjust the sound velocity of the gage and the zero reference to the material of the step block. 4.3 Using the appropriate Certificate of Calibration template for the UUC, record the thickness from the Reference Standard label. 4.4 Determine the allowed range of readings using the calculation methods shown in column A of table 5-1. 4.5 Use the UUC to take measurements on each step of the 5-step block. Verify that the readings are within the allowable limits and record the readings on the Certificate of Calibration. 5 Performance Requirements Note: The technician will collect the data needed to complete column B of Table 5-1. Do not write in this procedure. Table 5-1 Performance Requirements and Calibration Data for PosiTector UTG Reference Thickness Min. Reading Allowed Max. Reading Allowed Actual Gage Measurement A B Calculation: A - 0.03 mm Calculation: A + 0.03 mm For imperial/metric readings convert using 1 = 25.4 mm Management Procedure 2585 Rev. E 4

Management Procedure Change Notice Procedure Number: MP 2585 Revision Level: E Date of Change: 14 August 2009 Title: Calibration Procedure for PosiTector UTG Reason for Change: Designate STD and ME version of product Standardize format of procedure Description of Change: Modified Table 1-1 to distinguishes ranges for single element and dual element probes. Added statements 4.1, 4.3 & 4.4 Reordered sections to standardize format Added Min and Max readings to table 5-1 and removed imperial reference readings column Added calculations for min and max readings. I confirm I have read and understand the procedure and the change described above. Printed Name Signature Date Management Form 0010.02-05/1998 Management Procedure 2585 Rev. E 5