Hennepin County Transportation Department

Similar documents
5. RUNNINGWAY GUIDELINES

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

CSAH 101 Preliminary Design

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Road Diets FDOT Process

Agenda. Citizen Advisory Committee. CSAH 101 (CSAH 62 to Hutchins Drive) City of Minnetonka May 29, :00 pm

Corridor Management Committee. February 11, 2016

Bus Rapid Transit Plans

Chapter 4: Funding and Implementation

Physical Implications of Complete Streets Policies

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

NJDOT Complete Streets Checklist

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

What Is a Complete Street?

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

C Line Rapid Bus Preliminary Station Design

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

St. Francis Drive through the City of Santa Fe Corridor Study

Roosevelt Estates Neighborhood Improvements

INDOT Complete Streets Guideline & Policy

F L E T C H E R A V E N U E

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

Bottineau Transitway Health Impact Assessment Summary

122 Avenue: 107 Street to Fort Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Safe Routes to School Action Plan Aberdeen, Idaho

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

San Jose Transportation Policy

You are invited to an... OPEN HOUSE. Recommended Approach for the Franklin Avenue / East River Parkway Intersection

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Project Update May 2018

42nd Ave N Reconstruction

Non-Motorized Transportation 7-1

Pedestrian and bicycle progress report

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

TRANSPORTATION & MOBILITY

CTH M Reconstruction

ACTIVE TRANSPORTATION

Chapter 9: Pedestrians and Bicyclists

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Hennepin County Pedestrian Plan Public Comment Report

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Montclair s Complete Streets Experience

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Appendix 3 Roadway and Bike/Ped Design Standards

City of Saline. Complete Streets Ordinance

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Regional Bicycle Barriers Study

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

CTDOT Pedestrian and Bicycle Safety Initiatives

Prince George s County plans, policies, and projects

City of Waterloo Complete Streets Policy

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Major Bike Routes 102 Avenue Workshop April 21, 2015

Morristown, NJ Complete Streets Policy

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

PEDESTRIAN ACTION PLAN

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

ACTION TRANSMITTAL No

Fulton Market Streetscape

City of Moorhead Committee of the Whole Meeting

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Tonight is for you. Learn everything you can. Share all your ideas.

Hennepin County Bicycle and Pedestrian Planning

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Small Town & Rural Multimodal Networks

TRASBURG RANSPORTATION

MnDOT Implementation of Complete Streets Policy. January 2014

Broadway Complete Streets Project

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Omaha s Complete Streets Policy

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

2.0 Existing Conditions

Hennepin/First Transportation Study

Closing Plenary Session

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

LANCASTER CITY BICYCLE NETWORK

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Transcription:

Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation Planning Division Manager May 16, 2011

What Does the County Highway System Consist of? 350 Miles Urban Roads 223 Miles Rural Roads

Hennepin County Complete Streets Policy Adopted by the County Board in July, 2009 - First county in Minnesota to adopt a Complete Streets Policy Demonstrates the county s commitment to develop and maintain a safe, efficient, balanced and environmentally sound transportation system and to support Active Living integrating physical activity into daily routines such as biking, walking or taking transit. Developing Complete Streets is a priority on all corridors, and every transportation and development project is treated as an opportunity to make improvements. Policy acknowledges diversity of natural and built environment in Hennepin County. Therefore, flexibility is important, and Complete Streets will not look the same in all environments, communities or development contexts.

County Perspective of Reality Challenges include: Maintaining a balance between competing interests Moving people and goods (pedestrians, bicyclists, transit, passenger and emergency vehicles, commercial trucks) Protecting the environment (trees, air and water quality, cultural resources) Providing space for utilities and other corridor users Obtaining approvals (not everyone always agrees) Funding for enhancements behind the curb Maintenance, Maintenance, Maintenance! or, Who takes care of all this stuff, and who removes the snow?

So, what is the County doing to make our streets GREAT? Complete Streets Policy Americans with Disabilities Act (ADA) Transition Plan Roadside Enhancement Partnership Program (REPP) funding source Engagement with stakeholders on maintenance project striping conversions and reconstruction (new) projects

Complete Streets Design Development Data Gathering Existing and forecast traffic volumes and turning movements Crash statistics Inventory and assessment of corridor features Public Involvement Work with City to identify stakeholders and engagement strategy Tailored Public input helps define the elements of the project Preliminary and Detail Design Preliminary Design City Council Approval Environmental Documentation Final Design/Construction Plans City Council Approval

Existing Conditions Layout

Existing Conditions Layout

Checklist For Compliance With Hennepin County Complete Streets Policy

Proposed Corridor Features

Implementation of Complete Streets Maintenance/Reconditioning of Pavement - Curbs/sidewalks typically remain in place - 4 lane to 3 lane conversions Roadway Reconstruction - Complete reconstruction within Right of Way, including underground and overhead utilities - Suburban areas typically require additional Right of Way Separate multi-use trail projects ADA Pedestrian Ramp Improvements

Maintenance/Reconditioning of Pavement Recent Conversions to 3-Lanes Bass Lake Road (CSAH-70) Brooklyn Center & Crystal Spring 2007 Douglas Drive (CSAH-102) Crystal Golden Valley Summer 2010 Medicine Lake Road (CSAH-70) Crystal / New Hope Summer 2006 Extension - 2010 Lake Drive (CSAH-9) Robbinsdale Fall 2004 50 th Street (CSAH-21) Minneapolis Spring 2004

County Road 70 (Medicine lake Road) 4 Lane to 3 Lane Conversion (Works within existing curb)

County Road 70 (Medicine Lake Road) 4 Lane to 3 Lane Conversion

County Road 5 (Minnetonka Boulevard) On road bike route using shoulder Route Signage Commuter usage

County Road 5 (Franklin Avenue) Intersection Renovation Bike Boxes Updated crosswalks and signals

County Road 5 (Franklin Avenue) Intersection Renovation Updated crosswalks

Completed Reconstruction Projects County Road 3 (Lake Street) From Dupont Avenue to West River Parkway (Exception: I-35W Area) Minneapolis County Road 136 (Silver Lake Road) From St. Anthony Boulevard to 37 th Avenue Northeast St. Anthony County Road 19 Trail Project From Baker Park Reserve to Crow Hassan Park Reserve (9 miles) Medina, Loretto, Corcoran, Hanover County Road 22 (Lyndale Avenue) From Minnehaha Parkway to Lake Street Minneapolis

County Road 3 (Lake Street)

County Road 3 (Lake Street)

County Road 136 (Silver Lake Road)

County Road 136 (Silver Lake Road)

County Road 136 (Silver Lake Road)

County Road 19 Trail Project CP Rail Crossing in Loretto Before After

County Road 19 Trail Project Trail Filtration Ditch Before After

County Road 19 Trail Project Downtown Loretto Before After

County Road 19 Trail Project Downtown Loretto Before After

County Road 22 (Lyndale Avenue) (Looking North at 34 th Street) Before After

County Road 22 (Lyndale Avenue) (Median)

County Road 36 (University Avenue) (Reconstructed with extended bike lane gutter)

County Road 46 Ford Bridge Off road bike trails Partnering

County Road 101 at Lake Minnetonka LRT Regional Trail (At-grade crossing upgraded to tunnel)

Questions? Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation Planning Division Manager