glenbrook springdale tod feasibility study

Similar documents
S T A T I O N A R E A P L A N

Chapter 3: Multi-Modal Circulation and Streetscapes

NEWMARKET UPHAM S CORNER

Omaha s Complete Streets Policy

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

5 Circulation & Parking

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Executive Summary Route 30 Corridor Master Plan

5 CIRCULATION AND STREET DESIGN

TRANSPORTATION COMMISSION Agenda Staff Report

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

STONY PLAIN ROAD STREETSCAPE

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Ann Arbor Downtown Street Plan

Chapter 5 Future Transportation

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Newport City Thoroughfare Plan

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Paoli Road Improvement Feasibility Study

Environment and Public Works Committee Presentation

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

East Burke Transportation, Safety and Capacity Improvements

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

STREETSCAPE CONCEPTS

Solana Beach Comprehensive Active Transportation Strategy (CATS)

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Complete Streets. Designing Streets for Everyone. Sarnia

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Transportation Corridor Studies: Summary of Recommendations

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

Route 7 Corridor Study

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Tonight is for you. Learn everything you can. Share all your ideas.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

6.4 RECOMMENDED IMPROVEMENTS

Transportation Planning Division

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Mainstreet Master Plan Land Use

Montford Drive Parking & Circulation Study

Governance and Priorities Committee Report For the July 2, 2015 Meeting

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

FONTAINE AVENUE STUDY Final Report

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

North Shore Transportation Improvement Strategy

MARTIN LUTHER KING JR. WAY

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

11/28/2016 VIA

COWETA HIGH SCHOOL AND EAST HIGHWAY 51


complete streets design and construction standards public primer City of Edmonton

CURBSIDE ACTIVITY DESIGN

summary of issues and opportunities

Community Task Force November 15, 2017

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

CONNECTING PEOPLE TO PLACES

Perryville TOD and Greenway Plan

San Jose Transportation Policy

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

SPRINGFIELD REVITALIZATION REPORT

Draft North Industrial Area-Wide Traffic Plan

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Bus Rapid Transit Plans

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica

Draft Recommended List of Potential Projects

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Transportation Improvement Plan SECTION2

City of Birmingham Draft Multi-modal Transportation Plan

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Broad Street Bicycle Boulevard Design Guidelines

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Transcription:

MARCH 2015 glenbrook springdale tod feasibility study STAMFORD, CT PACKAGE OF COMPREHENSIVE TOD IMPROVEMENTS FOR CTDOT CONSIDERATION GLENBROOK SPRINGDALE TRANSIT-ORIENTED DEVELOPMENT FEASIBILITY STUDY

OVERVIEW The Glenbrook/Springdale Transit-Oriented Development (TOD) Feasibility Study explores the opportunity and challenges of TOD in two historic and vital communities north of downtown Stamford along Metro-North s New Canaan Branch Line. Highlights of the study included: Identifying TOD opportunities that can strengthen each village Assessing the rail stations in terms of commuter use, parking, and development potential Evaluating market potential, site capacity, and financial feasibility Recognizing the potential and focus on new housing, with supporting retail and community services Considering potential zoning changes, infrastructure improvements, and parking enhancements that foster transit access New Canaan Branch Line PROJECT TEAM City of Stamford Land Use Bureau Goody Clancy Planning/Urban Design WZHA Economics/Implementation ZVA Residential Market Analysis CDM Smith Infrastructure/Parking/ Streets URS Rail Survey and Analysis SWRPA/WCCOG Planning Support The study was funded solely by the State of Connecticut TOD Pilot Program. This document provides a comprehensive set of TOD recommendations for Glenbrook and Springdale and is being submitted to CTDOT for further consideration. PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 1

SUMMARY RECOMMENDATIONS Additional help from the State is needed in each neighborhood to make transit an integral component that supports a TOD environment. The private market and City of Stamford are both supportive of TOD in Glenbrook and Springdale Both the City and private developers are willing to act and have been working towards TOD, including: > Creation of Village Commercial District (VCD) zoning in 2009 to promote TOD > Within the VCDs over 100 units under construction in Springdale; 17 units in Glenbrook > Streetscape improvements in the VCDs on Hope Street in Springdale and Crescent Street in Glenbrook > Zoning refinements to the VCDs, ground floor uses, and setbacks as called for in the TOD Feasibility Study The TOD Study recommend the following action items that will improve transit access, infrastructure and streetscape, and development opportunities in each community: > Land acquisition for parking in Springdale (~$800,000 to $1.6m) > Maintenance facility relocation in Glenbrook (~$200,000) > Streetscape improvements in Glenbrook (~$1,500,000) > A range of other key streetscape improvements in both locations > A range of other key station improvements in both locations > In Springdale > Improved pedestrian and bike access > Reconfigured entries and exits > Improved striping and traffic flow > New landscaped islands, pedestrian lighting, and bike plaza > In Glenbrook > Improved striping and traffic flow > New landscaped islands, pedestrian lighting, and bike plaza 2 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

TOD AREA: HALF-MILE RADIUS AROUND EACH STATION Springdale Station Glenbrook Station The Springdale station is situated at the southern end of the Springdale Village Commercial District along Hope Street. The ½ mile radius around the station includes a mix of single and multi-family residential, single story retail establishments, and the River Bend Business Park. The Glenbrook station is situated in the middle of its Village Commercial District and similarly surrounded by a mix of uses. The Glenbrook station is located between Glenbrook Road and Crescent Street, so does not have a presence on Hope Street. PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 3

PROCESS The TOD study was guided by a comprehensive public process in each village. The resulting recommendations build on past studies and reflect the needs and aspirations of the communities. Year-long planning process Three rounds of Community Meetings in each neighborhood Project Advisory Committee included participation by City, CTDOT, and WestCOG Builds on foundation of neighborhood planning since 2002 and 2009 zoning Next steps: Complete final study report and recommendations 4 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

FINDINGS Rail improvements are the foundation of TOD in Stamford. Additional help from the State is now needed to make transit an integral part of growth in Springdale and Glenbrook. OVERVIEW FINDINGS TOD opportunities and market demand exist around both stations Station sites cannot support TOD and accommodate commuter parking without significant public subsidy existing station lots should continue to be reserved for parking Zoning changes by the City in 2009 are providing a good basis for TOD proposals additional zoning refinements can further enhance opportunities Streetscape and station improvements would enhance the accessibility and attractiveness of the stations and encourage further development. Parking supply at the stations is not keeping pace with demand from Stamford residents, which is continuing to increase. STATION FINDINGS Station survey of 500+ riders by URS highlighted dissatisfaction with capacity of peak hour trains: > 95% of respondents were from Stamford > Most common operational concerns: improved on-time performance, additional peak hour trains needed, longer trains, real-time information > Springdale: Frustration about number of daily/permit parking spots > Glenbrook: Concern with train crowding New Canaan Branch Line Needs Study, CTDOT 2010 > 2007-2030: Anticipated 44% growth > Springdale: Add 4,000 passing siding > Springdale: Double platform or lengthening platform > Full signalization of the branch Continued growth of TOD is linked to the capacity of rail service to meet that demand over time; additional service is needed. NEIGHBORHOOD ACTIONS Two different neighborhoods and needs: > In Springdale, concerns about TOD but broad support for expansion of station parking Near term action item: Acquire property adjacent to station in industrial area for surface/structured parking > In Glenbrook, community support for TOD but limited opportunity for parking expansion focus on station improvements and streetscape Near term action items: Demolish and relocate Cityowned maintenance building to improve station visibility and enhance station; implement adjacent streetscape initiatives PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 5

RAIL STATION DEVELOPMENT ANALYSIS An initial focus of the TOD Feasibility Study was to test the viability of development on the station sites. Although the station sites are physically capable of accommodating development, the cost of construction and replacement parking for rail use is not financially feasible without significant public subsidy. SPRINGDALE STATION - TESTING OF DEVELOPMENT SCENARIOS SCENARIO 2A: Limited development w/ small on-site garage parking structure housing housing SCENARIO 2B: Development w/ off-site garage housing housing N N The study recommends that the stations be maintained for surface parking and that TOD occurs on parcels around the stations. This scenario does not require property acquisition. It shows an on-site garage with surrounding residential development providing 36 housing units, some service retail, and 82 net new commuter parking spaces, with a public cost of approximately $7.5 million to make the project feasible. This scenario require property acquisition off-site along Largo Drive and shows full development of the current rail station site. It would add 80 to 90 residential units and 70 net new commuter parking spaces with a public cost of approximately $4.8 million to make the project feasible. GLENBROOK STATION - TESTING OF DEVELOPMENT SCENARIOS SCENARIO 2: Limited development with small garage SCENARIO 3: Development with expanded garage parking structure housing Crescent St housing parking structure housing Crescent St Glenbrook Rd N N Glenbrook Rd This scenario requires acquisition of two adjacent parcels to the east of the station. It would add 10 12 residential units, 166 net new commuter parking spaces, and have a public cost of approximately $7.7 million to make the project feasible. This scenario also requires acquisition of the two adjacent parcels east of the station. Providing 26 to 36 residential units, it would supply 207 net new commuter parking spaces and have a public cost of $10.8 million to make the project feasible. 6 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

DRAFT springdale springdale PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 7

springdale POTENTIAL TOD Future possibility for surface parking (near-term) or garage (long-term) Springdale Station Approved project Possible future development Possible future development outside current VC Expanded VCD boundary Approximately 220 to 280 units are possible in the next 5 to 7 years with more long-term; TOD will fill the gaps and create a mature pedestrianoriented environment around transit New residential improves connections to Hope Street Daily rail boardings in 2012 (500) are projected to increase significantly by 2030 without TOD; slightly more with TOD Additional mixed-use strengthens Hope Street as an attractive pedestrian street Rail parking demand could also increase, potential need for up to 500 spaces 8 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

EXISTING STATION DRAFT A number of current challenges exist for station accessibility and parking. Addressing these would greatly improve the stations contribution to a transit-oriented village. LARGO DR Current challenges: Poor pedestrian access Difficult to cross Hope Street Peak hour trains near capacity Insufficient parking with long wait list Parking is limited: Currently 210 spaces 100 on permit waitlist 18 to 24 month wait STATE OWNED HOPE ST CITY OWNED springdale PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 9

Recommendations: Improve safety, appearance, and pedestrian/ bike access Specially-paved intersection Improve Hope Street and add specially-paved intersection at Largo and Clearview Ave. New bus shelter Increase the number of parking permits In order to support TOD in Springdale, the current parking facilities at the station should be improved and expanded. This would reduce the current permit waitlist, provide needed accessibility for existing riders, and accommodate future parking demand. Acquire the parcel across the tracks on Largo Drive to accommodate current parking demand In the near-term, it would provide 75 parking spaces; with potential for a structure if parking demand increases over the longer term 10 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY Pedestrian Access Landscaped station entrance (with stone gateway) Near-term surface parking New sidewalks High-visibility crosswalks Kiss and ride CLEA Specially-paved RV I E W AV E intersection Better defined onstreet parking o rm Add pedestrian scaled lighting Bicycle parking (20 spaces) n P la tf Add landscaped islands DR Vehicular Entry/Exit S ta ti o Add bike plaza GO E ST Add new entries/exits and reconfigure flow LAR HOP springdale S T AT I ON E NHAN C E ME N T S Existing trees New street trees Reconstructed parking (to improve traffic flow) Vehicular Entry/Exit New driveways to station parking lot (one lane in, one lane out)

LARGO DRIVE PARCEL INFORMATION The parcel on Largo Drive offers a key opportunity to expand commuter parking at the Springdale station. An overview analysis shows the following: Parcel is.83 acres Approximately 120 wide x 280 long Market value range between $800,000 and $1,600,000 estimated Owned by CFC Association Properties in Norwalk Approximately half of parcel is currently used by CTM Media Group vans and cars Other half is used for intermittent semi-truck storage and maintenance Hope Street - Existing Condition.83 acres Adjacent parcel with same owner springdale PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 11

springdale LARGO DRIVE IMPROVEMENTS (2014 INITIATIVE) A separate study has been done by the City of Stamford Engineering Department for improvements to Largo Drive at Hope Street and across the tracks into River Bend Center. The TOD Feasibility Study recommends the funding and implementation of these improvements to complement and support the potential new surface parking on Largo Drive. History of vehicles being trapped on the tracks as they travel toward Hope Street Tracks are higher than surrounding roadway, forming a vertical hump that trucks have trouble negotiating Proposed redesign provides a left turn lane on Hope Street to allow vehicles to queue when the crossing is closed for a passing train Westbound traffic approaching the crossing will have signal control eliminating or greatly reducing the potential for trapped vehicles LARGO DRIVE IMPROVEMENTS - CONCEPT PLAN Potential future parking garage (not included in costs) Specially paved intersection (not included in costs) Improved Largo Drive vehicle lanes New sidewalks Improved railroad gates New sidewalks, tree plantings, lighting for pedestrian access to rail station Improved Largo Drive Public hearing process completed in 2013 and 2014 coordination is under way with the railroad for required modifications Estimated order-of-magnitude cost approximately $2,500,000 (not including future garage or garage property) Design and Costs by City of Stamford Engineering Approximated costs: Railroad gates $1.5 million Traffic signal $350,000 Traffic circle and roadway $650,000 New traffic circle 12 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

SURFACE PARKING (~75 SPACES ADDED) CLEARVIEW AVENUE Existing parcel OMEGA DRIVE HOPE STREET Springdale Station LARGO DRIVE LARGO DRIVE New surface parking lot serving rail station This diagram shows the possible layout of a 75-space surface parking lot on the Largo Drive parcel, serving the Springdale station. springdale PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 13

PARKING STRUCTURE (~300 SPACES ADDED) springdale OMEGA DRIVE HOPE STREET Springdale Station CLEARVIEW AVENUE 120 ft LARGO DRIVE Potential for pedestrian bridge over tracks connecting garage and platform Potential 300-space parking garage LARGO DRIVE Vehicular and pedestrian improvements on Largo Drive are also needed (see page 12) This diagram shows the potential for a 300-space parking structure on the Largo Drive parcel, should future demand warrant it. 14 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

ACCESS TO STATION TODAY LOOKING SOUTH ON HOPE STREET FUTURE PARK DIFFICULT INTERSECTION FOR PEDESTRIANS NO BIKE LANES NEEDS STREETSCAPE The existing view of Hope Street looking south towards Largo Drive and the station is characterized by automobiles and narrow sidewalks with few pedestrian amenities. NORTHILL ST BENNETT ST CLEARVIEW AVE HOPE ST HOPE S LARGO DR springdale PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 15

springdale VIEW OF HOPE STREET WITH STATION AREA IMPROVEMENTS POTENTIAL FUTURE PARKING OFF LARGO DRIVE SPECIALLY-PAVED INTERSECTION FOR PEDESTRIAN A potential view of Hope Street in the future, showing an inviting pedestrian-oriented intersection at Hope and Largo, with improved sidewalks and surrounding TOD. A future garage is shown, but that area would be occupied by surface parking in the near-term. SHARED BIKE LANE NORTHILL ST BENNETT ST HOPE S HOPE ST LARGO DR CLEARVIEW AVE 16 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

SUMMARY OF TOD-RELATED IMPROVEMENTS Hope Street and Largo/ Clearview Intersections Lane dieting and streetscape between Largo Drive and Omega Drive, and two specially paved intersections at Largo Drive and Clearview Avenue Bike Improvements A network of shared bike lanes or sharrows on key streets in Springdale Rail Station Enhancements Parking lot enhancements to improve access, utilization, and attractiveness Rail Station Parking Expansion Land acquisition to support increased surface parking in the near-term and a potential parking garage in the long-term Side Streets Lane dieting and streetscape on select side streets off of Hope Street SPRINGDALE STATION HOPE ST LARGO DR BENNETT ST FAHEY ST NORTHILL ST CUSHING ST KNAPP ST HYDE ST springdale PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 17

springdale SUMMARY OF TOD-RELATED IMPROVEMENTS Springdale Implementation Plan ACTION INTENDED EFFECT INITIATE COMPLETE EST. COST** SOURCE OF FUNDING PUBLIC IMPROVEMENTS Streetscape: Hope St. from Largo Dr. to Omega Dr.; Improve Hope and Largo and Hope and Clearview Intersections* New Vehicular Entrance to Station Parking Lot at Clearview with Traffic Signal* New Vehicular Entrance to Station at the South End* Parking Lot Improvements* Largo Drive improvements Streetscape Sidestreets: Knapp/Greenway; Northill/ Cushing; Bennett/Fahey RAIL IMPROVEMENTS Acquire Off-Site Property to Meet Current and Future Parking Demand Rail Service Enhancements: Increase Train Frequency and Train Capacity ZONING REFINEMENTS Expand Village Commercial District to Incorporate Light Industrial Area East of Hope St. Enhance Pedestrian and Bike Connections to Station; Create Village Gateways Reduce congestion and enhance traffic flow 2016 2019 $200,000 to $300,000 Reduce congestion and enhance traffic flow 2016 2019 $100,000 to $200,000 Enhance Pedestrian and Bike Connections to Station Enhanced access to River Bend and future parking Enhance Pedestrian and Bike Connections to Station 2016 2019 $1.5 million State DECD; State DOT; City Capital Budget 2016 2019 $500,000 to $1,000,000 State DECD; State DOT; City Capital Budget State DECD; State DOT; City Capital Budget State DECD; State DOT; City Capital Budget 2016 2019 $2,500,000 1 State DECD; State DOT; City Capital Budget 2018+ $300,000 to $400,000 per side street Satisfy Commuter Parking Demand 2015 2017 $800,000 to $1,600,000 Public/Private; City Capital Budget State DECD; State DOT Satisfy Ridership Demand 2015+ tbd State DOT; TIGER Grants Allow for Integrated Village Commercial District 2015 2015 Land Use Boards Allow Sidewalk and Landscape Setbacks To Achieve Wider Sidewalks 2015 2015 Land Use Boards Allow Ground Floor Residential Uses on Side Street Concentrate Commercial Uses on Hope Street 2015 2015 Land Use Boards * These initiatives will likely be implemented together as a single capital improvement project. ** Costs are order-of-magnitude only and dependent on extent of work, design details, and timing of initiative 1 Comprised of $1.5 million for railroad gates, $350,000 for traffic signal, and $650,000 for traffic circle and roadway per page 12 18 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

DRAFT glenbrook glenbrook PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 19

POTENTIAL TOD glenbrook Village connects to Hope Street and grows with it Approved project Possible future development Expanded VCD boundary Residential redevelopment along Parker Ave. improves village edge Additional mixed-use development fills gaps and enlivens the sidewalk Glenbrook Station New residential adjacent to station with active ground floor along Crescent St. Additional residential development creates an attractive, pedestrianscale feel on Crescent St. Approximately 140 to 190 units possible in the next 5 to 7 years with more long-term; TOD will fill the gaps and create a mature pedestrianoriented environment around transit. Daily rail boardings in 2012 (350) are projected to increase significantly by 2030 without TOD; slightly more with TOD Rail parking demand could also increase slightly, but greater need in Springdale 20 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

EXISTING STATION DRAFT A number of current challenges exist for station accessibility and parking. Addressing these would greatly improve the stations contribution to a transit-oriented village. Current challenges: Poor pedestrian access Feels disconnected from village Poor visual and physical access to platform Non-contributing uses Parking is limited: Currently 156 spaces ~50 on permit waitlist 9 to 12 month wait Maintenance Facility glenbrook PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 21

glenbrook CITY TRAFFIC SIGNAL MAINTENANCE FACILITY Currently used as centralized signal maintenance shop Approximately 4,000 square foot building plus small yard Approximately $28k demo; $75k for replacement parking; $100k new building City exploring options for relocation Removal would enhance access at center of platform Removal would visually improve the station and traffic flow This existing view of the City maintenance facility at the Glenbrook commuter station shows the visual and physical barriers created at the center of the platform. Relocating the facility would transform the use of the station. 22 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

STREETSCAPE AROUND STATION Existing conditions in Glenbrook are substandard: Narrow or no sidewalks in places No pedestrian scale lighting Limited tree planting Limited furnishings Recent improvements more needed Streetscape improvements would have a direct, positive impact on rail station access: Glenbrook Road is the priority Between Scofield and Church Approximately $1,500,000 estimate Pedestrian/commuter safety Existing Glenbrook Road Potential concept glenbrook PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 23

COWING PL Recommendations IMPLEMENT STATION ENHANCEMENTS Replace with surface parking (10 to 15 spaces) Add landscaped islands Add pedestrian scaled lighting Add bike parking KIRKHAM PL Relocate maintenance facility One lane in, one lane out Vehicular Entry/Exit Reduced street width CHU RCH Bicycle parking (15 spaces) Kiss and ride ST High visibility crosswalks IMPLEMENT ADJACENT STREETSCAPE PROJECTS New street trees (throughout VCD) Key gateway intersections New sidewalks Expanded sidewalk Specially paved intersection Curb bump out New parking spaces Bicycle parking (15 spaces) Landscape station entrance K RD Improve utilization Relocate maintenance shed BROO Improved intersection 24 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY R RD Bio-retention green island Increase the number of parking permits Improve ped/bike station access GL B EN K OO Landscape station entrance GLEN glenbrook S T AT I ON E NHAN C E ME N T S CRES C ENT ST Vehicular Entry/Exit One lane in, one lane out Mid-block crossing

POTENTIAL CHARACTER AT CHURCH STREET INTERSECTION TOD POTENTIAL ON CHURCH STREET UNION MEMORIAL CHURCH RECONFIGURED KIRKHAM PLACE NEW PUBLIC SPACE SPECIALLY PAVED INTERSECTION NEW TOWNHOMES CURB EXTENSIONS AND SHARED BIKE LANES Potential Glenbrook Road and Church Street looking east. Special paving, slight roadway narrowing, new sidewalks and shared bike lanes, residential uses, and a small public park would make this intersection a new gateway for Glenbrook. Existing PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 25

POTENTIAL CHARACTER NEAR STATION GROUND-LEVEL SERVICES NEW TOD HOUSING NICK S PIZZA NEW TREES, LIGHTING, AND SIGNAGE NEW SIDEWALKS Potential NEW SHARED BIKE LANES NEW STREETSCAPE A potential view of Glenbrook Road in the future. Note that proposed buildings front directly onto the street per the zoning ordinance (with parking behind) and sidewalks have been upgraded to the City of Stamford standard. Nick s Pizza is seen at the corner of Glenbrook Road and Church Street. Existing view looking north on Glenbrook Road 26 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

GLENBROOK SUMMARY OF TOD-RELATED IMPROVEMENTS Glenbrook Road and Church/ Crescent Intersections Lane dieting and streetscape between Scofield Avenue and Church Street, and specially paved intersections at Church and Crescent Streets Hope Street Lane dieting and streetscape between Scofield Avenue and Church Street Courtland Avenue Streetscape and Stairway Lane dieting and streetscape on the bridge, on the street to Maple Tree Avenue, and a new stairway to Taylor Reed Place Church Street Lane dieting and streetscape between Glenbrook Road and Hope Street Bike Improvements A network of shared bike lanes or sharrows on key streets in Glenbrook Rail Station Enhancements Parking lot enhancements to improve access, utilization, and attractiveness HOPE ST CHURCH ST GLENBROOK RD GLENBROOK RD GLENBROOK STATION CRESCENT ST COURTLAND AVE glenbrook PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 27

glenbrook GLENBROOK SUMMARY OF TOD-RELATED IMPROVEMENTS Glenbrook Implementation Plan ACTION INTENDED EFFECT INITIATE COMPLETE EST. COST* SOURCE OF FUNDING PUBLIC IMPROVEMENTS Glenbrook Road Streetscape with Improved Intersections at Church and Crescent Streets Hope Street Streetscape between Scofield and Church Streets Courtland/Taylor Reed Intersection Improvements and Stairs Church Street Streetscape from Glenbrook to Hope Street Parking Lot Improvements RAIL IMPROVEMENTS Re-Locate City Maintenance Facility, Demolish Building, and Construct New Off-Site Rail Service Enhancements: Increase Train Frequency and Train Capacity ZONING REFINEMENTS Expand Village Commercial District to Hope Street and Parker Ave More Attractive Gateway; Pedestrian/Bike Safety; Quality Pedestrian Environment; Unlock Redevelopment Potential of Surrounding Parcels 2015 2016 $1,500,000 State DECD; State DOT; City Capital Budget Streetscape Improvements; Pedestrian/Bike Safety 2016 2017 $1,500,000 State DECD; State DOT; City Capital Budget Improve Pedestrian Connections from Points East 2016 2017 $750,000 State DOT; City Capital Budget (Stairs) More Attractive Gateway; Pedestrian/Bike Safety; Quality Pedestrian Environment Landscape, Ped Lighting, Bike and Stormwater Improvements Allow for More Commuter Parking; Increase Station Visibility 2017 2018 $1,000,000 State DECD; State DOT; City Capital Budget 2017 2018 $300,000 $700,000 2014 2016 $200,000 to $300,000 State DECD; State DOT; City Capital Budget State Dept of Policy and Management; State DECD; State DOT; City Satisfy Ridership Demand 2015+ tbd State DOT; TIGER Grants Create a Unified Glenbrook Commercial District 2014 2015 Land Use Boards Allow 4-Story Building Height with Setback of 4th Floor Above 32' as in Springdale Allow Sidewalk and Landscape Setbacks Accelerate Revitalization by Enhancing Redevelopment Economics To Achieve Wider Sidewalks and Frontyard Landscape 2014 2015 Land Use Boards 2014 2015 Land Use Boards Allow Ground Floor Residential Uses on Crescent/Parker Ave Concentrate Commercial Uses on Glenbrook Rd. 2014 2015 Land Use Boards * Costs are order-of-magnitude only and dependent on extent of work, design details, and timing of initiative Source: Goody Clancy; W-ZHA 28 GLENBROOK/SPRINGDALE TOD FEASIBILITY STUDY

SUMMARY RECOMMENDATIONS Additional help from the State is needed in each neighborhood to make transit an integral component that supports a TOD environment. The private market and City of Stamford are both supportive of TOD in Glenbrook and Springdale Both the City and private developers are willing to act and have been working towards TOD, including: > Creation of Village Commercial District (VCD) zoning in 2009 to promote TOD > Within the VCDs over 100 units under construction in Springdale; 17 units in Glenbrook > Streetscape improvements in the VCDs on Hope Street in Springdale and Crescent Street in Glenbrook > Zoning refinements to the VCDs, ground floor uses, and setbacks as called for in the TOD Feasibility Study The TOD Study recommend the following action items that will improve transit access, infrastructure and streetscape, and development opportunities in each community: > Land acquisition for parking in Springdale (~$800,000 to $1.6m) > Maintenance facility relocation in Glenbrook (~$200,000) > Streetscape improvements in Glenbrook (~$1,500,000) > A range of other key streetscape improvements in both locations > A range of other key station improvements in both locations > In Springdale > Improved pedestrian and bike access > Reconfigured entries and exits > Improved striping and traffic flow > New landscaped islands, pedestrian lighting, and bike plaza > In Glenbrook > Improved striping and traffic flow > New landscaped islands, pedestrian lighting, and bike plaza PACKAGE OF COMPREHENSIVE IMPROVEMENTS FOR CTDOT CONSIDERATION 29