VIEW FROM ZILKER PARK TWO EXPRESS LANES IN EACH DIRECTION + A DOWNTOWN DIRECT CONNECTION

Similar documents
STUDY LOCATION February 26, 2015

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION)

NORTH DOWNTOWN N EAST WEST

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

GENERAL DESCRIPTION. Page 1 of 5

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Downtown Connector Trail

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

May 20, 2014 LINCOLN CORRIDOR DESIGN SEGMENTS

Access Routes from US 101 to the Richmond San Rafael Bridge

Comprehensive Collection of Stakeholder Alternatives by Mode

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

PUBLIC INFORMATION MEETING

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

7.0 Nonmotorized Facilities

STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE

Appendix D: Concept Screening

Proposed Action, Purpose and Need Technical Memorandum

PRESENTATION OUTLINE

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117

I-10 AT SCENIC LOOP RD. Open House

Southside Pilot Proposal

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

5 CIRCULATION AND STREET DESIGN

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

-H- Note. Flow control valve. Key features

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

A: PLANNED P ROJECTS PROJECTS

I-80 Corridor Overhaul

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report

Pavement Rehabilitation & Buffered Bike Lane

2040 AM (PM) PEAK HOUR VOLUMES

Non-Harmony Notes GRADE 6 MUSIC THEORY

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal.

Grade Separated Intersection

Short and Long Term Needs

ACTION TRANSMITTAL No

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Active Travel The Role of Self-Selection in Explaining the Effect of Built Environment on Active Travel

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Chapter 33. Grade Separated Intersection Overview Classification of Intersection Grade Separated Intersection

1. Write down the ideal gas law and define all its variable and parameters. 2. Calculate the values and units of the ideal gas law constant R.

MARTA Expansion Update

STREET AND HIGHWAY PLAN

I-395 Express Lanes Northern Extension Project Public Hearings

EXHIBIT U THE SCOPE DOCUMENT

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

The following notes describe comments received that were written/drawn on maps by workshop participants.

MILLERSVILLE UNIVERSITY: EAST FREDERICK STREET ABANDONMENT ALTERNATIVES ANALYSIS

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

405 Express Lanes General Information & Frequently Asked Questions

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

TRUCK ROUTE NOT TO SCALE. Mercy St LEGEND. Truck Route During Construction. Church St & Castro St, Mountain View, CA PRIME CONTRACTOR:

Terwillegar Drive Expressway Draft Concept Plan

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE

2016 REPORT TO STATE PARADE EVENT PLAN

Technical Advisory Committee Meeting

BAC-PAC-LHA Joint Meeting July 11, PM

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Directions to Saint-Gobain 20 Moores Road, Malvern, PA from Center City Philadelphia

Financial Project ID No(s).: and ETDM No(s).: and 14181

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Figure 1: East West Connector Alignment Alternatives Concept Drawing

INTERSTATE 540 IMPROVEMENT STUDY

Important Lane Closures for Jan , 2012

Capital Beltway HOT Lanes Project

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Hidden Oaks Elementary School

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Sacramento Grid 2.0. The Downtown Transportation Study

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

Section Access Control Plan - SH 14 (Mulberry Street)

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan

Intersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive

TRANSPORTATION COMMISSION Agenda Staff Report

Capital Beltway HOT Lanes Project

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

DRAFT INVESTMENT CORRIDORS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

Today. Develop Plans. Public Listening Session

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Somerville Community Path Feasibility Study

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Transcription:

VIEW FROM ZILKER PARK TWO EXPRESS LAES I EACH DIRECTIO + A DOWTOW DIRECT COECTIO DOWTOW ACCESS GEERAL PURPOSE & EXPRESS LAES A & ROY BUTLER HIKE & BIKE TRAIL (LADY BIRD LAKE TRAIL) LAKE AUSTI BOULEVARD WEST 6TH STREET EXIT RAMP COECTIO FROM DOWTOW WEST 5TH STREET W. CESAR CHAVEZ STREET RAMP Looking orth STRATFORD DRIVE

VIEW FROM ZILKER CLUBHOUSE TWO EXPRESS LAES I EACH DIRECTIO + A DOWTOW DIRECT COECTIO DOWTOW ACCESS GEERAL PURPOSE & EXPRESS LAES EXISTIG BRIDGES WIDEED TO ACCOMMODATE OE EXPRESS LAE I EACH DIRECTIO EXIT RAMP COECTIO FROM DOWTOW W. CESAR CHAVEZ STREET RAMP Looking East STRATFORD DRIVE

VIEW FROM AUSTI HIGH SCHOOL TWO EXPRESS LAES I EACH DIRECTIO + A DOWTOW DIRECT COECTIO ELEVATED COECTIO TO DOWTOW I CETER OF MOPAC LAKE AUSTI BOULEVARD WEST 6TH STREET EXIT RAMP COECTIO FROM DOWTOW WEST 5TH STREET W. CESAR CHAVEZ STREET RAMP Looking orthwest AUSTI HIGH SCHOOL AUSTI ATURE AD SCIECE CETER LADY BIRD LAKE STRATFORD DRIVE ZILKER PARK

OVER LADY BIRD LAKE TWO EXPRESS LAES I EACH DIRECTIO + A DOWTOW DIRECT COECTIO LEGED Existing R.O.W.** Direct Connector Lane Express Lane General Purpose Lane* Direct Connectors Express Lanes and Ramps General Purpose Lanes and Ramps *The same number of non-tolled general purpose lanes that exist today would remain, in accordance with state law. **The schematic does not propose any land acquisitions to expand the right-of-way beyond the existing limits. EXPRESS LAE EXIT TO CESAR CHAVEZ; ACCESS TO AUSTI HIGH SCHOOL OT ALLOWED DOWTOW ACCESS ALL IMPROVEMETS STAY WITHI EXISTIG R.O.W. EXPRESS LAES TO/FROM MOPAC SOUTH

AT US290 TWO EXPRESS LAES +DOWTOW DIRECT COECTIO TWO EXPRESS LAES WITHOUT DOWTOW DIRECT COECTIO TWO EXPRESS LAES + ELEVATED RAMPS EAR BARTO SKYWAY LEGED Existing R.O.W.** Direct Connector Lane Express Lane General Purpose Lane* Auxillary Lane OE LAE EXPRESS LAE DIRECT COECTORS TO/FROM US290. THESE DIRECT COECTORS CA BE ICORPORATED ITO AY COFIGURATIO. Direct Connectors Express Lanes and Ramps General Purpose Lanes and Ramps *The same number of non-tolled general purpose lanes that exist today would remain, in accordance with state law. **The schematic does not propose any land acquisitions to expand the right-of-way beyond the existing limits.

AT US290 TWO EXPRESS LAES +DOWTOW DIRECT COECTIO TWO EXPRESS LAES WITHOUT DOWTOW DIRECT COECTIO TWO EXPRESS LAES + ELEVATED RAMPS EAR BARTO SKYWAY EXPRESS LAE FLYOVER TO ELIMIATE WEAVE O MAI LAES BRAIDED RAMP SEPARATES EXITIG AD ETERIG TRAFFIC LEGED Existing R.O.W.** Express Lane General Purpose Lane* Auxillary Lane DIRECT COECTOR/ COLLECTOR DISTRIBUTOR SEPARATES EXISTIG AD ETERIG TRAFFIC OTE: RAMPIG CHAGES BETWEE 290 AD WILLIAM CAO DRIVE CA BE ICORPORATED ITO AY COFIGURATIO. Direct Connectors Express Lanes and Ramps General Purpose Lanes and Ramps *The same number of non-tolled general purpose lanes that exist today would remain, in accordance with state law. **The schematic does not propose any land acquisitions to expand the right-of-way beyond the existing limits.