Flood Preparedness and Response

Similar documents
Emergency Action Plans for Dam Safety

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

COWLEY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF9-Search and Rescue

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Traffic Control & Road Closures for Special Events

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

What I ve Learned About Dam Safety Good, Bad and Ugly

Harbor Hurricane Preparedness Plan*

Huntington District. For More Information Contact (304)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Idaho Fire Service Technology Fire Fighter II

EQUIPMENT, AND SUPPLIES. Delivering Environmental, Industrial, and Emergency Solutions

Search and Rescue ESF 9

Emergency Action Plan

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Smart motorways: all lane running on the M25. Guidance for EEAST crews

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN

Safe distances when using explosives

UNIVERSITY OF RICHMOND

OFFICE OF HOMELAND SECURITY & EMERGENCY PREPAREDNESS MISSISSIPPI RIVER LEVEE DISTRICTS DAILY COMMUNICATION & READINGS LOG

SECTION TRAFFIC REGULATIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Emergency Response Plans

Search and Rescue Emergency Support Function

OFFSHORE PATROL VESSEL OPERATIONS

The University of Georgia Automated External Defibrillator (AED) Program Guidelines

Lecture 10 : Sewer Appurtenances

Hazardous Materials for First Responders

ACCESS CONCERNS AT THE ORANGE COUNTY EMERGENCY OPERATIONS CENTER

Emergency Response Planning Guide

ACTIVITY RISK ASSESSMENT

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

HAZARDOUS INCIDENT SITE SAFETY PLAN

Traffic Calming Policy

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Storm Preparedness Plan for Manchester, Massachusetts Issued by the Manchester Harbormaster Department. A.

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

COVINGTON POLICE DEPARTMENT STANDARD OPERATING PROCEDURE

Athletic Field Use Regulations

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Be our partner in safe, reliable natural gas delivery

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Lower Churchill Management Corporation. Nalcor Doc. No. MFA-PT-MD-0000-EN-PL

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

CONFINED SPACE ENTRY PROGRAM

Emergency Detour Route Guideline and Best Practices

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

Operating Committee Strategic Plan

Accident Investigation (Part 2) Training Who is to be Trained

DCS Disaster Plan CAT Printable Slides and Script

Emergency Action Plan

CONFINED SPACES. Procedures for Permit-required ALTERNATIVE TO A FULL PERMIT ENTRY. Written Programs

EMERGENCY RESPONSE PROCEDURES

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Minimum Safety Requirements for Contractors Working on Railway Property

Global EHS Powered Industrial Truck and Pedestrian Safety

SF Pride Parade & Celebration

Responding to Natural Gas Pipeline Emergencies

INTEROFFICE MEMORANDUM

HOST SITE APPLICATION FOR THE COMPETITION YEAR 2020

Temporary Equipment Fails After 20 Years of Use Worker Gets Sandblasted

OPERATION AND MAINTENANCE

Table of Contents. I. Introduction 1. II. Elements of the School Crossing Program 1

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Sample Signature List: [Your list may vary depending on your jurisdiction, structure, and/or state and county guidelines.]

ADA on Construction. Guidance for Section C Plan Preparers

Accommodating Pedestrians in the Work Zone

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

DISASTER MANAGEMENT PLAN

Title: Recreational Facilities 3 - Athletic Facilities

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

NATURAL GAS RESPONSE SOG

STRUCTURAL COLLAPSE SEARCH AND RESCUE PROCEDURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Mines Inspectorate Safety bulletin no. 102 (Version 1) 30 November 2010

This Manual Part recommends functional/operating guidelines for control of automatic grade crossing warning systems. Draft

Product Overview GSA # GS-07F-0340M

Organization for Traffic Control on County Highways

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

BOTTOM HINGED FLOOD BARRIER

Emergency Response Policy

Additional requirements for all types of entry are described in Section Determining the Applicable Entry Method

Geotechnics, Face and Stockpile Operations

AED Program 2017 January 2017

Raw Material Spill. Lessons Learned. Volume 05 Issue USW

Above ground or below, worker and jobsite safety is your priority and ours.

Emergency Preparedness Developing the Plan

TYPE OF ORDER NUMBER/SERIES ISSUE DATE EFFECTIVE DATE General Order /12/2015 6/14/2015

Event Management Plan

COALITION FOR SAFE SCHOOLS AND COMMUNITIES SAN MATEO COUNTY THE BIG FIVE SCHOOL EMERGENCY GUIDELINES IMMEDIATE ACTION RESPONSE

BUTTERFLY VALVES Series 800

Monthly Safety and Security Report April 2014

EQUIPMENT AND MATERIALS

Work Unit Plan to Acquire and Use an AED Revised April 2018

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. August 8, 2017

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS

Transcription:

Flood Preparedness and Response U.S. Army Corps of Engineers, San Francisco District Flood Preparedness Workshop October 21, 2015 John Cheng Readiness Branch

Flood Preparedness and Response Provide guidance and basic recommendations regarding planning, preparation, and response for high water events Assist owners/operators in managing levees, floodwalls, pumping stations, and any other components of flood risk management systems

Flood Preparedness and Response Sources - Department of Homeland Security Emergency Preparedness Guidelines for Levees, 2012 http://www.damsafety.org/media/documents/security/emergencypreparednessguidelin esforlevees.pdf - International Levee Handbook, 2013 http://www.leveehandbook.net/ - California Department of Water Resources Levee Threat Monitoring Guidelines, 2013 http://www.water.ca.gov/floodmgmt/docs/levee_threat_monitoring_guidelines.pdf - USACE Levee Owner s Manual, 2006 http://www.nws.usace.army.mil/portals/27/docs/emergency/leveeownersmanual%28fin al%29.pdf

Flood Preparedness and Response Emergency planning and identification of vulnerable areas - Emergency Preparedness Plan Readiness and preparedness - Evacuation plans - Community outreach - Training and exercises Event and crisis management - Preliminary response activities - Full response activities - Post response activities

Preparedness: Emergency Preparedness Plan Levee agency s Emergency Plan should address: - evacuation activities - communication protocols with local EOCs and the general public - individual roles and responsibilities during an emergency -supplies and materials that may be needed Establish priorities for responding to an emergency such as: - Protection of life and property - Communication of hazardous conditions to public agencies and the public - Restoration of normal operations

Preparedness: Emergency Preparedness Plan Establish close working relationships with State and local emergency management and public safety agencies - Share emergency plan with local OES and DWR Flood Operations Center Establish communication with residents and businesses whose properties could potentially be impacted by a levee breach

Preparedness: Emergency Preparedness Plan Emergency notification flowchart - who will be notified by whom and in what priority - names and essential contact info (home, office, cell) - emergency management agencies that need to be notified - ensuring adequate personnel available to operate 24 hours a day Telephone directory - Area EOC, local contractors, flood fight supply and equipment vendors, hospitals, railroad/highway departments, police and fire departments, and any other critical numbers

Preparedness: Emergency Preparedness Plan Annotated drawings describing project features and potential areas of concern during a flood event - Low areas - Areas subject to boils - Areas of known seepage - Areas of recent rodent activity - Alternate access points to the levee - Locations of drains that should be checked for closure - Available sources and locations of sandbags, pumps, and other supplies

Preparedness: Emergency Preparedness Plan Detailed table of locations of project features that may need to be closed (floodgates, flap gates, etc) - denote river level or other indicators that would signal that each of these features needs to be closed Protocols to notify corresponding highway or railroad agencies responsible for closing roads or railroad tracks running through levees and floodwalls

Preparedness: Evacuation Plans While levee owners/operators may or may not be directly responsible for developing an evacuation plan, they are encouraged to participate in the planning process and maintain close contact with appropriate governmental agencies during emergencies to provide timely and accurate information on levee conditions Collaboration among levee owners and operators, local law enforcement officials, emergency management agencies, and other appropriate entities

Preparedness: Training and Exercises Training for new personnel on operating, maintaining, and patrolling the levee system - operation of closure structures - response to sandboils - patrolling area during flood Flood response plans: practice and communicate with personnel to ensure effectiveness Exercises help inform how much time and manpower is necessary to complete certain tasks

Preparedness: Training and Exercises Basic training and exercises: - Physical operation of project features - Notification of emergency response personnel - Test of communications/backup communications system - Mobilization of monitoring teams and monitoring project features - Basic flood fight techniques - Coordination and control (volunteers, patrols, operators, nearby levee districts, highway department, State EOC, etc) - Dissemination of information to the public

Preparedness: Community Outreach Public Materials/Public Meetings - Areas protected - How the system works - Potential impact on the community and ongoing costs for regular operation and maintenance - Consequences of levee failure - Local flood evacuation plans - Historical overview of past floods and experiences - Flood response plans and procedures how the community can contribute

Preparedness: Community Outreach Awareness of adjacent systems - understand how adjacent sections of levees or components on private property impact the larger system - community could still be flooded if adjacent systems do not operate properly

Response: Preliminary Response Activities Upon receipt of official information forecasting imminent high water: - quickly mobilize response team - notify all personnel involved in flood fighting - assign sections of levee to individual levee personnel Local, State, and Federal assistance - It is vital that levee owners/operators be aware of the type of support that State and local governments can provide, and whom to contact in order to receive necessary support

Response: Preliminary Response Activities Review emergency preparedness plans and lessons from past Verify that personnel have access to gate keys, current rosters, listing of project features, and other critical items Coordinate efforts with communities upstream and downstream Alert the community to the potential for flooding Ensure State and local emergency operations centers are informed of the situation Begin documenting the situation, and send situation reports to the State and local emergency operations centers, as appropriate

Response: Preliminary Response Activities Initial project inspection (high water conditions) - Condition of any recent levee repairs - Water conditions and any accumulation of trash, debris, ice - Transportation: roads, rail, and water access - Material: identify location, quantity, and conditions of all necessary tools and materials (sacks, sandbags, lumber, and lights) and distribute and store them at points where maintenance is anticipated - Communication: locate and check all two-way radios and telephones - Drainage structures: special attention should be given to flap gates and other drainage structures that might not be accessible later

Response: Preliminary Response Additional activities Activities - Review assignments for patrols, closings, etc - Obtain lists of all construction equipment, motorboats, cars, earthmoving equipment, and trucks that can be made available - Assess needed support (vehicles, radios) - Verify serviceability of flood fighting equipment - Record gauge readings and monitor river stages - Close the levee to the public - Install levee or floodwall closures as necessary. - Remove all hazardous materials and/or explosives from the vicinity of the levee

Response: Preliminary Response Activities Patrols: for early detection of levee problems, damages, failures - Entire levee should be patrolled at least once per day - Patrols should be conducted by teams rather than individuals - General: record gage readings hourly, inspect riverside fences for debris, verify accessibility of access roads, photograph all issues - Levee: Look for sandboils, slides, sloughing, wave wash, scouring, check flap/sluice gates, check gap closures - Floodwalls: Look for saturated areas, sandboils, settlement, bank caving, leakage, seeps, sink holes, check gap closures - Pump stations: verify proper ventilation of pumping plant to prevent overheating, look for sink holes or wet areas that indicate conduit separation

Response: Preliminary Response Activities Equipment for Patrols - Portable radio or cell phone - Record Log - Watch - Life jackets - Log book - Probing rod - Patrolling instructions - Short wooden stakes - Plan of action for patrolling - 40 feet of one-half inch - Plans of flood control project (1/2 ) nylon safety line to - Operation and Maintenance connect team members Manual - Camera - Weather gear - Field boots - Flashlights - Hard hats

Response: Preliminary Response Safety/Security Precautions Activities - Patrol team: walk side-by-side with one person on waterside of levee near the water surface, one at the top, and one on the landside toe of the levee - Person closest to the water should be wearing a safety line - Watch out for floating objects (limbs and roots of uprooted trees), best to walk upstream when patrolling the waterside of the levee - Each patrol team member should be thoroughly familiar with the community evacuation plan and signals.

Response: Preliminary Response Activities Safety/Security Precautions - If evacuation is necessary, patrol team should move together to predetermined location. When returning to levees/floodwalls, physical conditions may be considerably different from before evacuation, especially if levee was overtopped. - If overtopping occurs during nightfall, patrols should not resume until daylight, though there may be cases where this recommendation cannot be followed - Patrols should also be watchful for anyone that seems out of place, or any activity that seems suspicious. Report suspicious activities observed by the patrol to law enforcement

Response: Preliminary Response Activities General Maintenance Activities - Once initial inspection has been completed, levee personnel should consider addressing any pressing maintenance issues before the river rises further - Drainage structures (temporary closures if necessary) - Fill holes, gullies, and washes in the levee crown, embankments, and landside berms with compacted fill if possible, otherwise sandbags - Examine all drainage ditches on the landside of the levee and remove any obstructions - Repair all levee settlement and depressions. Avoid taking material for these repairs from the area adjacent to the levee

Response: Preliminary Response Interaction with the public Activities - If there are many observers on the levees or at the floodwalls, recommended that an additional patrol team member be assigned as a safety officer - Patrol team, however, is not responsible to order observers off the levees and floodwalls - Recommended that each team carry and distribute instruction cards describing the community evacuation plan in order to inform observers of potential danger

Response: Full Response Activities Patrol continuously, 24 hours per day, 7 days per week (as situation requires), especially if there are ponding areas during high water Ensure all closures and gates are in place, and all preliminary response maintenance activities are completed Remove padlocks from access gates to facilitate patrols Monitor inventory of flood fighting equipment, materials, and supplies as they are used Keep the public informed of the current situation through media, if warranted

Response: Full Response Activities Repair erosion and seepage problems as quickly as possible Ensure competent pumping station operators are on duty (understand pump operations and capable of manual operation) Use of portable pumps may be needed to pump water over levee if water is ponding in undesirable areas or rising too quickly in ponding areas Monitor debris basins and trash racks for sediment/debris Remove debris from trash racks at pump stations periodically when station is in operation

Response: Full Response Activities Evacuation Plan Activation - Levee personnel should be ready to evacuate the area - Coordinate evacuation with police, fire department, and first responders immediately - Follow the predetermined routes - Meet in predetermined locations and immediately confirm the safety of all levee personnel

Response: Full Response Activities Volunteer Assistance - if it becomes necessary to recruit volunteers during the flood fight: - Identify primary and alternate assembly areas with adequate parking - Arrange transportation, subsistence, and shelter for labor force - Contact media to request that volunteers report to designated assembly area - Maintain sign-in roster at assembly area to account for volunteers and personnel - Identify staging areas away from the work site but as close to flood fight locations as possible

Response: Full Response Activities Volunteer Assistance: - Separate staging areas for sandbag filling, carrying and loading, materials stockpiles, rest and breaks, first aid - Establish emergency operations center to oversee flood fight operations and for interagency coordination, staffed 24 hours daily until the situation is resolved - Establish traffic patterns that will be used to move sandbags from the staging area to the work site (one-way traffic patterns on the levee system if conditions permit) - Be certain that the people laying sandbags are well supervised by a trained individual

Response: Post Response Once water has subsided: Activities - Reopen any sluice gates that were closed once the water on the river side has receded to 3 inches below the pond level on the protected side - Open all closure structures and properly store all components - Remove and properly dispose of all temporary protection measures (sandbags and material placed during temp levee raises) - Take inventory of all remaining flood fight equipment and supplies. Repair or replace damaged equipment, restock supplies in preparation for the next flood event - Salvage supplies, return borrowed equipment

Response: Post Response Once water has subsided: Activities - Inspect the entire flood control work, noting locations of damage and extent of damage at each location - Meet with key personnel, volunteer representatives, community partners soon after the event to debrief, share remaining concerns, and discuss lessons learned - Revise local emergency preparedness plans to account for lessons learned and changes to recommended procedures - Document the event: keep a map record of the levee, indicating areas that were in distress at the time of the flooding (useful for making repairs/improvements, and as guide for next flood event

Response: Post Response Once water has subsided: Activities - Locate and keep records of the flood s high water marks for future planning, along with any rainfall and river data gathered - Make repairs to the levee as soon as possible in preparation for future flood event - Initiate actions to provide permanent flood protection measures if the existing system relies heavily on temporary solutions during emergencies

Questions? John Cheng Readiness Branch (415) 289-3078 john.c.cheng@usace.army.mil