Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk

Similar documents
Guide to Artificial Grass Pitches for Community Use. Part 1. Performance Standards for Surfaces and Pitches used Outdoors

ARTIFICIAL GRASS PITCHES FOR RUGBY performance standards and design guides for community use pitches and training areas

ARTIFICIAL GRASS PITCHES FOR RUGBY AND ASSOCIATION FOOTBALL PERFORMANCE STANDARDS AND DESIGN GUIDES FOR COMMUNITY USE PITCHES AND TRAINING AREAS

IRB Regulation 22 Performance Specification Re-test Field Report

Australian Football League and Cricket Australia Handbook of Testing for Synthetic Turf

Indoor Sports Halls with Cricket Provision [TS3] ecb.co.uk

Venue Name / Location Complex Esportiu - Futbal Salou Report Number R A1. Primary Sport(s) Football

Sport Labs Combining design

FIFA Quality Programme for Football Turf. Handbook of Test Methods October 2015 Edition

AUSTRALIAN CRICKET REVISED JUNIOR FORMATS

tbs TDC8(5630)P 3 Draft Tanzania Standard Textiles Ropes Specifications: Part 2. Ropes made from Man-made fibres (First edition)

Code of Practice and Technical Requirements for the Design and Installation of Non-Turf Cricket Facilities

Standards for football surfaces why different tests?

HOCKEY TURF & FIELD STANDARDS. Part 1. Introduction & General Guidance 2017 Edition QUALITY PROGRAMME FOR HOCKEY TURF

CRICKET BY-LAWS for 2014

UNDER 14 s SPECIFIC COMPETITION RULES (Updated September 2017)

Application as FIFA licensee. for the FIFA Quality Programme for Football Turf

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

NORTHERN CRICKET UNION OF IRELAND CRITERIA FOR GROUNDS FIRST DIVISION PREMIER LEAGUE AND SECTION I

Royal London Under 15 County Cup

Surfaces for football, rugby, tennis, netball, basketball, hockey etc. Sport Facility Specifications

Turf managers companion

WHITECROSS DISTRICT TOURNAMENT Boys Year 7 LO

Beyond Boundaries Women s T20 Scottish Cup 2017

Under 15 County Cup. The title of the Competition shall be the ECB Under 15 County Cup for the Tim Bible Cup. Please refer to Generic Rule 1.

WHITECROSS DISTRICT TOURNAMENT Boys Under 14 T20

Limited Over Cricket All Divisions

Royal London Under 17 County Cup

Cricket Coaching and Practice Facilities since 1991

ESTABLISHING PERFORMANCE GUIDELINES FOR SPORTS FIELDS IN AUSTRALIA

BK SUPER SMASH 1. THE COMPETITION

SURREY U15 PREMIER LEAGUE

Playing Conditions 50 overs per side

Playing Conditions 40 overs per side

ITF Court Surface Classification Scheme. ISSS Technical Meeting Nyon, October 2002

Stage 1. Application. Contents. Cricket Illawarra Junior Playing Conditions (2018/19) a) Cricket Illawarra Junior Stage 1 Formats Level 1 & Level 2.

Stage 2. Application. Contents. Cricket Illawarra Junior Playing Conditions (2018/19) a) Cricket Illawarra Junior Stage 2 Formats Level 1 & Level 2.

a) Cricket Illawarra & South Coast Cricket Combined Junior Competition Stage 3 Format Level 1 Under 14B

Surface Test Report. IMPORTANT NOTE: This report does not constitute an ITF Court Pace Classification.

Hurricanes Junior League Playing Conditions Category One

Rules and Playing Conditions of Cricket Conference Cup. 1. Title The title of the Competition shall be The Conference Cup for the Bertie Joel Trophy.

ISO INTERNATIONAL STANDARD. Cranes and lifting appliances Selection of wire ropes Part 1: General

NDCA Guidelines - Wet Weather Situations Junior Competition

This document is a preview generated by EVS

ECB Guidance on the Wearing of Cricket Helmets by Young Players

ISO INTERNATIONAL STANDARD

Appendices All Grades

SPECIFICATION FOR RAISED PAVEMENT MARKERS

Game 4 - Limited 45 Over

ECB 50+ County Championship

CRICKET BY-LAWS for 2013

JUNIOR CRICKET STAGE 2-30 OVER DETAILED MATCH DAY RULES

MANLY WARRINGAH JUNIOR CRICKET ASSOCIATION LOCAL RULES COMMON TO ALL AGE GROUPS. as at the 2013/14 season

BREAK,SHOT,UMPIRE, ETURN,MATCH,BASELIN WHATEVER YOUR GAME, PLAY IT WITH PLAYRITE.

AS/NZS :2010. Retroreflective materials and devices for road traffic control purposes AS/NZS :2010

Cricket Albury Wodonga Board

CRICKET ASSOCIATION COMPETITION HANDBOOK

hockey hockey Integral Weighted Goals Aluminium Goals Fence Folding Goals Premier Hockey Goals Folding Wheelaway Goals

Girls Y7/8 Cricket Playing Conditions

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Specsavers Under 17 County Championship B Division Two-Day Competition

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

FACE CONSULTANTS LIMITED. Accelerated Abrasion Resistance Surveys. BS :2002 And BS : A2: 2011

INTERNATIONAL SKATING UNION

Surfaces of the tennis courts

TEST REPORT. BS :2002+A1:2013 Pendulum testers method of operation. UKSRG Guidelines-4:2011 The assessment of floor slip resistance.

The FA Cup, The FA Trophy, The FA Vase and The FA Youth Cup Competitions

Cricket Albury Wodonga Board

Royal London Club Championship Competition Rules

NatWest Women s County T20

Game 1 Two-Day Format

CARES Technical Approval Report TA1-B & C 5059

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

Cricket carpets are usually installed over concrete or 'dynamic' (hard porous) bases.

CORESTA RECOMMENDED METHOD N 6

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

ISO 4081 INTERNATIONAL STANDARD. Rubber hoses and tubing for cooling systems for internal-combustion engines Specification

This document is a preview generated by EVS

Use equation for the cylindrical section and equation or for the ends.

European Handball Federation TM EHF Beach Handball Commission

Intertek Testing Services Taiwan Ltd.

609W (Dry Cement Delivery) (Specification 3129F, 3129H, 3129L)

WHITECROSS DISTRICT TOURNAMENT Boys Under 15 LO

Ground Grading Criteria & Summary

INTERNATIONAL STANDARD

JUNIOR CRICKET STAGE 1-20 OVER DETAILED MATCH DAY RULES

Club of Origin Boys Under 13 LO 2019/2020

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

ATCA UNDER 12 JUNIOR FORMAT COMPETITION RULES. Index

VICTORIAN COUNTRY CRICKET LEAGUE Inc.

Hurricanes Junior League Under 13 s Playing Conditions

SURREY JUNIOR INVITATION LEAGUES

SECTION 2 HILLTOPPER MOUND AND HOMEPLATE CLAY BASEBALL APPLICATIONS. 1. Hilltopper Mound Clay for baseball pitching mound or homeplate areas

THE SURREY CHAMPIONSHIP

IAAF Certification System Track Synthetic Surface Testing Specifications

FACILITY NAME: ASBA SINGLE FIELD FACILITY AWARDS APPLICATION. New Construction Upgrade of Existing Facility. Date of completed project:

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

Boys HB Smash Under 14 Playing Conditions

SET OF EUROLEAGUE BACKSTOP UNITS (Reference PK120)

SURREY JUNIOR INVITATION LEAGUES

Transcription:

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk

01 Introduction and Scope This Standard describes the requirements for non-turf cricket pitch systems intended for outdoor use. It sets requirements for match pitches and practice areas. It does not set requirements for outfields for which there are currently no standards. The Standard has four sections: Performance Requirements These define the ball/surface and player/ surface interactions considered necessary to allow a satisfactory game of cricket to take place. Construction Requirements These define the dimensions, tolerances and gradients for match pitches and practice areas to ensure they provide a satisfactory playing environment. Material Requirements These define the quality of the synthetic material used to construct non-turf pitches to ensure they will last for a realistic period of time. Identification tests Once a surfacing system has been shown to satisfy the performance and material requirements a series of tests are undertaken to characterise the materials used in the surface s construction so that they cannot be replaced by inferior or different materials. This Standard should be read in conjunction with the ECB s Code of Practice and Technical Requirements for the Design and Installation of Non-turf Cricket Facilities, which defines the design and workmanship standards the ECB consider appropriate for non-turf pitches. Page 02

02 Normative References Test methods from other publications are incorporates into this Standard by dated or undated reference. Where dated references are used, subsequent amendments to or revisions of any of these publications will apply to this Standard only when incorporated into it by amendment or revision. For undated references, the latest edition of the publication referred to applies. Page 03

03 Definitions 03.1 Match pitch An area of non-turf (synthetic) surfacing together with its supporting layers, that is used for competitive play and comprises the principal playing area, which is the area between the wickets, and the two bowler s run-ups which extend beyond the wickets. Bowler s run-up Ball Performance Area Bowler s run-up (Player Performance Base) (Player Performance Base) 03.2 Practice pitches and areas An area of non-turf (synthetic) surfacing, together with its supporting layers, that is used for practice and training activities. The area comprises two sections, a batting end and a bowling end with a central area in between. The central area may be surfaced with the same synthetic surface as the batting and bowling ends (a continuous surface), an alternative form of synthetic surface or natural grass (not usually recommended due to increased maintenance). Synthetic surrounds Cage Batting end Central Area Bowler s run-up (Ball Performance Base) (Player Performance Base) Page 04

03 Definitions 03.3 Wicket The stumps and bails at each end of the match pitch or practice area. 03.4 Playing surface All elements of the match pitch or practice area that influence the sports performance or biomechanical response of the surface including the non-turf surface, performance base and aggregate sub-base. 03.5 Non-turf surface The upper layer of the playing surface on which the game is played; it may be formed from a synthetic turf, textile or synthetic material. 03.6 Ball performance base Synthetic or particulate materials laid beneath the non-turf surface that are designed, in conjunction with the non-turf surface, to provide the ball performance (bounce, spin, pace etc.) of the playing surface. 03.7 Player performance base Synthetic or particulate materials laid beneath the non-turf surface that are designed, in conjunction with the non-turf surface, to provide the dynamic performance of the playing surface as experienced by the player. 03.8 Synthetic surrounds Synthetic surfacing that is used to surround the non-turf playing surface. Page 05

04 Classification Surfaces are classified by their intended use and performance characteristics and not by materials or construction. There are three principal categories: 1. Junior (Under 12) 2. Club/Recreational 3. First Class Cricket & Centres of Excellence All of which may be used for match play, practice, coaching and general training. Page 06

05 Test Conditions 05.1 Site tests ECB approval tests shall be undertaken on facilities that have been subjected to at least 200 man hours of use by adults or 600 man hours of use by juniors on both batting and bowling ends. Tests shall only be made during the cricket playing season under the prevailing meteorological conditions, but with the surface temperature in the range of +5 C to +40 C. The surface and ambient temperatures and the ambient relative humidity at the time of test shall be recorded and reported. When ECB approval tests are being undertaken rotational resistance tests shall be made under dry and wet conditions. Wet tests shall be made in the test positions (see appendix A) that gave the highest and lowest mean values under dry conditions. 05.2 Wet tests Wet test areas shall be prepared by evenly applying to the test piece a volume of water that thoroughly soaks the specimen (if in doubt this is should be equal to the volume of the test specimen). Following wetting the test specimen shall be allowed to drain for 15 minutes and the test carried out immediately thereafter. 05.3 Laboratory tests Laboratory tests shall be made at an ambient laboratory temperature of 23 ± 2ºC. Test specimens shall be conditioned for a minimum of 3 hours at the laboratory temperature prior to test. When tests are being undertaken for facility assessment purposes they shall be made under the prevailing site conditions unless performance under a particular condition is of concern. Before the commencement of tests the match pitch or practice area should be prepared and maintained in accordance with the supplier s instructions to the satisfaction of the supplier and facility owner. 06 Test Laboratories Tests for ECB approval shall only be made by ECB approved test laboratories. Page 07

07 Performance Requirements 07.1 Ball rebound Ball rebound shall be measured from a drop height of 2000mm + 10mm in general accordance with BS EN 12235 using a cricket ball complying with BS 5993 and having a rebound on a rigid concrete floor of 640mm + 30mm. The results of the test shall be expressed as the absolute rebound in mm. Note: a Reader Grade 1 County Ball has been found to satisfy these requirements. Match pitches and practice areas shall be tested in the positions shown in Appendix A. The ball rebound of match pitches and the batting ends of practice areas shall satisfy the requirements detailed in Table1. Table 1 - Ball rebound requirements Type of match pitch or practice net Junior Club / Recreational Centre of Excellence & First Class Cricket 240mm 480mm 240mm 520mm 320mm 560mm All test positions shall fall within the specified range. The maximum individual result at any test position shall be no more than 1.5 times the minimum individual result at the test position. 07.2 Surface hardness pitch of the ball area When tested using the test procedure detailed in Appendix B the mean result for each test position shall be greater than 100 gravities. Match pitches and practice areas shall be tested in the positions shown in Appendix A. 07.3 Surface hardness bowler s run-ups When tested using the test procedure detailed in Appendix B the mean result for each test position shall be less than 300 gravities. Match pitches and practice areas shall be tested in the positions shown in Appendix A. 07.4 Rotational Resistance (traction) When tested under dry and wet conditions in accordance with BS EN 15301 Part 1 using the dimpled rubber test sole the rotational resistance of the playing surface, including any synthetic surrounds, shall be between 25Nm and 50Nm. Synthetic surrounds shall have values within + 5 Nm of the mean value of the playing surface. Match pitches and practice areas shall be tested in the positions shown in Appendix A. Synthetic surrounds shall be tested in at least five positions selected at random. All test positions shall fall within the specified range. The overall mean for all test positions shall be calculated. The variation from the overall mean of any test position shall be no greater than + 50mm of the overall mean. Page 08

08 Construction Requirements 08.1 Dimensions The minimum dimensions of non-turf cricket pitches and practice areas shall be as detailed in the Table 2. The area of the ball performance base shall be constructed from continuous rolls of material with no seams or joints in the non-turf surface or ball performance base. Table 2a minimum dimensions of match pitches Overall area Area containing performance bases Length Width Ball Performance Base Player Performance Base Length Width Length* Width Match Pitches Club/Recreational 30.0m 2.74m 16.12m 2.0m 6.94m 2.5m Junior (Under 12) 24.0m 2.74m 15.22m 2.0m 4.40m 2.5m Centres of excellence 32.0m 3.00m 16.12m 2.5m 7.94m 2.5m * to include 0.6m in front of popping crease at either end. Table 2b minimum dimensions for club/recreational practice areas Overall area Area containing performance bases Ball Performance Base Player Performance Base Length Width Length Width Batting end 11.0m 2.74m 11.0m 2.0m - - Bowling end in front of delivery crease Bowling end behind delivery crease Central area 4.0m 2.74m - - 4.0m 2.5m 4.0m 2.74m - - 3.9m 2.5m The distance between the batting and bowling wickets shall 20.12m (22yds). Page 09

08 Construction Requirements Table 2c minimum dimensions for junior practice areas Overall area Area containing performance bases Batting end Bowler s run-up Length Width Length Width Batting ends 10.0m 2.74m 10.0m 2.0m - - Bowling end in front of delivery crease Bowling end behind delivery crease Central area 4.0m 2.74m - - 4.0m 2.5m 4.0m 2.74m - - 3.9m 2.5m The distance between the batting and bowling wickets shall 19.22m (21yds). Table 2d minimum dimensions for practice areas at centres of excellence Overall area Area containing performance bases Batting end Bowler s run-up Length Width Length Width Batting ends 18.0m 3.0m 18.0m 2.5m - - Bowling end in front of delivery crease Bowling end behind delivery crease Central area 10.0m 3.0m - - 9.9m 2.5m 5.0m 3.0m - - 5.0m 4.9m The distance between the batting and bowling wickets shall 20.117m (22yds). Page 10

08 Construction Requirements Table 2c minimum dimensions for junior practice areas Overall area Area containing performance bases Batting end Bowler s run-up Length Width Length Width Batting ends 10.0m 2.74m 10.0m 2.0m - - Bowling end in front of delivery crease Bowling end behind delivery crease Central area 4.0m 2.74m - - 4.0m 2.5m 4.0m 2.74m - - 3.9m 2.5m The distance between the batting and bowling wickets shall 19.22m (21yds). Table 2e minimum dimension of practice area surrounds Club / Recreational and Junior Distance from stumps to netting at 1.50m batting end Distance outside cage frame 0.17m Centres of Excellence Distance from stumps to netting at 3.00m batting end Distance outside cage frame 0.17m 08.2 Surface regularity 08.2.1 Match Pitches When tested in accordance with BS 7370: Part 3, Appendix 4 the maximum undulation shall be in accordance with Table 3. Page 11

08 Construction Requirements 08.2.2 Practice areas When tested in accordance with BS 7370: Part 3, Appendix 4 the maximum undulation shall be in accordance with Table 3. Table 3 Surface regularity Playing surface Straightedge length Maximum undulation 2.0m 6 mm 0.3m 4 mm Transition from playing surface to surrounds (Match Pitches and Practice Areas) 2.0m 10 mm 0.3m 4 mm Synthetic surrounds and central areas 2.0m 6 mm 08.3 Slope 08.3.1 Match Pitches When match pitches are constructed on existing cricket squares they shall follow the general gradient of the square and where possible comply with Table 4. Match pitches not located on existing cricket squares shall be constructed in a single plane with a slope not exceeding the requirements of Table 4 unless the existing topography makes this cost prohibitive in which case the client shall agree in advance to a deviation from this requirement. Page 12

08 Construction Requirements 08.3.2 Practice Areas Practice areas shall be constructed in a single plane with a slope not exceeding the requirements of Table 4. Where separate batting and bowling ends are used they, along with the central area, shall be built on the same plane and level. Table 4 maximum gradients Along line of play 1.25% Across line of play 2.0% 08.4 Surface water drainage/run-off The design of match pitches and practice areas shall ensure that water does not pond on the playing surface for more than 15 minutes after rain fall stops. 08.5 Markings Match pitches and practice areas shall be marked out in accordance with the laws of the game. At hand over and for at least the following 100 man hours use the markings shall be clearly visible from a distance of 20m. Markings are considered to be part of the playing surface and as such shall not affect the performance of the playing surface outside the requirements of this standard. Page 13

09 Material Requirements Synthetic turf and textile surfaces used to form the playing surface, central areas and synthetic surrounds shall satisfy the following requirements: 09.1.1 Abrasion Resistance of non-filled surfaces When tested in accordance with BS EN 13672 the percentage mass loss after 2000 cycles shall be equal to or less than 5%. 09.1.2 Tuft withdrawal When tested in accordance with ISO 4919 the tuft withdrawal force of tufted carpets shall be greater than 30N. 09.1.3 Tensile properties of carpet When tested in accordance with BS EN ISO 13934 Part 1 the maximum force shall be greater than 15N. 09.1.4 Resistance to artificial weathering Following artificial weathering in accordance with BS EN 14836 the synthetic turf or pile yarn(s), as appropriate, shall satisfy the relevant requirements of Table 5. Table 5 Resistance to Artificial Weathering Property Test Method Requirement Colourfastness ISO 105 AO2 > Grey Scale 3 Tensile strength of yarn BS EN 13864 or BS ISO EN 5079 as appropriate 50% of the tensile strength of the unaged yarn Page 14

09 Material Requirements 09.1.5 Joint strength Where synthetic turf materials are designed to be bonded or stitched together they shall be tested for joint strength in accordance with BS EN 12228 following hot water ageing in accordance with BS EN 13744. The joint strength shall satisfy the requirements of Table 6. Table 6 Joint strength Type of joint Test Method Requirement Stitched or welded BS EN 12228 Method A > 1000N/100mm Bonded joints BS EN 12228 Method B > 25N/100mm 09.1.6 Surface Gloss The surface shall be sufficiently matt to avoid glare. 09.2 Synthetic surfaces Synthetic surfaces shall satisfy the following requirements: 09.2.1 Abrasion resistance When tested in accordance with BS EN 13672 the weight loss after 1000 cycles shall be no greater than 3.0g. 09.2.2 Tensile Strength When tested in accordance with BS EN 12330 the tensile strength of the surface shall be equal to or greater than 0.4Mpa. Page 15

09 Material Requirements 09.2.3 Joint Strength When tested in accordance with BS EN 12228 the strength of welded or stitched joints shall be equal to or greater than 1500N/100mm. 09.2.4 Surface Gloss The surface shall be sufficiently matt to avoid glare. 09.2.5 Resistance to artificial weathering Following artificial weathering in accordance with BS EN 14836 the synthetic surface shall satisfy the relevant requirements of Table 7. Table 7 Resistance to Artificial Weathering Property Test Method Requirement Colourfastness ISO 105 AO2 > Grey Scale 3 Tensile strength BS EN 12330 > 0.4Mpa Abrasion resistance BS EN 13672 <3.0g Page 16

10 Product Identification Each element of an ECB approved non-turf cricket surface shall be identified using the test methods detailed in Table 8. Materials used to subsequently construct non-turf pitches for which the supplier is claiming or implying ECB Approval shall not differ from the approved materials by more than the tolerances stated in Table 8. Table 8 Product identification and consistency Component Characteristic Test method Max variation Artificial turf and pile yarn(s) Mass per unit area ISO 8543 < ± 10% Tufts per unit area ISO 1763 < ± 10% Tuft withdrawal force ISO 4919 < ± 10% Pile length ISO 2549 < ± 5% Pile weight ISO 8543 < ± 10% Pile yarn characterisation DSC Same polymer Under layers Mass per unit area ISO 8543 < ± 10% Thickness BS EN 1969 No less than 90% Polymer composition DSC or Thermo-gravimetric Same polymer analysis Synthetic surfaces Mass per unit area ISO 8543 < ± 10% Aggregate used in performance bases and infills Thickness BS EN 1969 No less than 90% Polymer composition DSC or Thermo-gravimetric analysis Same polymer Particle size EN 933 - Part 1 Similar grading Particle shape pren 14955 Similar shape Bulk density EN 1097-3 + 15% Page 17

Appendix A Site Tests Tests shall be carried out in the positions detailed in Table A1 or in the case of a dispute in the area of concern. Table A1 - Test positions Property Match pitch Practice net Ball rebound Five individual tests across the pitch in each test segment a to j as shown on Figure 1 Five individual tests across the pitch in each test segment a to e as shown on Figure 2 Surface hardness Rotational Resistance Surface hardness (bowler s run-up) Five individual tests across the pitch in segments a, c, e, g, and i as shown on Figure 1 Five individual tests in the positions shown in Figure 2 and test segments d and g shown on Figure 1 Five individual tests in the each position shown in Figure 3 Five individual tests across the pitch in segments a, c and e as shown on Figure 2 Five individual tests across each position shown in Figure 2 and individual tests in each position shown in Figure 3 Five individual tests in the each position shown in Figure 3 The surface regularity of the non-turf surface and synthetic surrounds shall be measured over the entire area; both along the length and across the width. The position and magnitude of any undulations found that exceed the specified maximums shall be recorded and detailed in the test report. The surface regularity of the transition from the non-turf surface or synthetic surrounds to the surrounding natural turf shall be measured along each boundary by placing the 2m straightedge across the transition, with a 0.5m length of the straightedge on the non-turf surface or synthetic surrounds and a 1.5m length of the straightedge on the natural turf surround, as shown in Figure 4. The position and magnitude of any undulations found that exceed the specified maximums shall be recorded and detailed in the test report. Test reports shall detail the orientation of the pitch/practice net so test positions can be subsequently identified. Page 18

Figure 1 tests positions Page 19

Figure 2 tests positions 1.5m a b c d e Page 20

Figure 3 tests positions 1 2 3 4 1m 0.6m 5 6 7 8 9 Page 21

Figure 4 assessment of regularity at transition between natural turf and synthetic surfacing Natural turf Page 22

Appendix B Method of test for determination of surface hardness 1 Principle A cylindrical mass is released from a standard height and its peak deceleration during impact with the surface is recorded. 2 Apparatus A Clegg Impact Soil Tester shall be used. The apparatus consists of a cylindrical compaction hammer with a mass of 2.25kg and a diameter of 50mm attached to a piezoelectric accelerometer which feeds into a peak level digital meter. The peak deceleration of the hammer on impact with the ground shall be displayed in units of gravities. 3 Procedure Ensure that the guide tube is held vertically and drop the compaction hammer down the tube from a height of 450+10mm. After the impact of the hammer on the surface record the peak deceleration in units of gravities. Repeat the procedure fives times in each test position moving the guide tube by at least 100mm so that the compaction hammer does not impact with the surface on the same spot twice. 4 Expression of Results Calculate the mean hardness value of the five individual impacts for each test position. Page 23