INSTALLATION and OPERATION INSTRUCTIONS

Similar documents
FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

UltRo Dual Flow Reverse Osmosis Water System

ASSEMBLY & USE MANUAL

Operation Manual. PEGAS NovoTap, PEGAS NovoTap+

APPS-160 Gen 2 User Manual

accidents which arise due to non-observance of these instructions and the safety information herein.

INSTALLATION INSTRUCTIONS MANUAL ON/OFF SAFETY VALVE/PILOT KIT MODEL GA9050A-1 (F0235)

Your safety and the safety of others are very important.

OPERATING AND MAINTENANCE MANUAL

Model PSI Compressor with 3-Gallon Air Tank 12VDC

XpressFill XF4500 Counter Pressure Filler. Operating Instructions

XpressFill XF2500 Counter Pressure Filler. Operating Instructions

Draught Academy. Name. Date _

CO2 Tank Conversion Kit P.N , P.N , and P.N

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

Installation/Care/Use Manual

PremAire INSTRUCTIONS FOR VORTEX TUBE MODE OF OPERATION

INSTALLATION, CARE & USE MANUAL. EMASMB & LMASMB Surface Mount Bottle Filling Stations

Air Intake Snorkel Kit

Installation and Use Manual

Halsey Taylor Owners Manual

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

RIX COMPRESSORS. MICROBOOST Owner s Manual CONFIGURATION A MB-115 MB-230. November 21, 2002 APPLICABILITY [ A]

XpressFill XF4500C Counter Pressure Can Filler. Operating Instructions

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

36H SERIES Combination Gas Valve

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

TECHNICAL BULLETIN. Sigma-Aldrich Pure-Pac II System. Technical Bulletin AL-236

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Hot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

Helium-Oxygen Blender

Manual Solvent Purification System. Innovative Technology, Inc.

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

REVERSE OSMOSIS WATER FILTRATION SYSTEM MODEL EWR 4075 INSTRUCTION MANUAL

Freedom8 ShoeBox Compressor Manual

Installation Instructions

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

OPERATION MANUAL obl1 OPERATION MANUAL

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

Installation of Your SprayMaster System

VOLUMATIC WATER REGULATOR

Air-Oxygen Blender. Service Manual. Model No. PM5200 Series PM5300 Series (shown)

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual

Operation Manual Piston Sensed Gas Pressure Regulators

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

IMPORTANT SAFETY INFORMATION

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Adjustable. Unloader Valve. O&M Manual. Part #

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

SEAGULL IV X-1F Drinking Water Purification System

Technical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

INSTALLATION INSTRUCTIONS

Float Operated Level Controllers

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

Operation and Maintenance Manual for GENTEC Model 881VR Continuous/Intermittent Digital Suction Regulators

INSTRUCTION MANUAL. January 23, 2003, Revision 0

G92 Series BASOTROL Automatic Pilot Gas Valve

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

Hose Reel Enclosure Retrofit Kit

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Chemical Injection Technologies Installation/Service Bulletin

CLAY DIGGER. Safety, Operating, Maintenance Instructions & Spare Parts List MCD-30A 1" MCD-30A 7/8"

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

INSTALLATION AND SERVICE MANUAL FOR LANCER DISPENSING TOWERS

Build Your Own Flamethrower Step-by-step Manual

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Installation and Service Manual

MB-SP Series Solvent Purification System

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

SERVICE KITS SPECIFICATIONS GENERAL DESCRIPTION. RM052S-XXX-XX Two Post Lift / Ram

PRESSURISED PAINT CONTAINER

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

CSA Sample Draw Aspirator Adapter Operator s Manual

FLUSHMATE III FLUSHMATE FLUSHOMETER - TANK SYSTEM. Owner s Service Manual. 503 Series. 503 Series

book : t95575.fm Seite 1 Mittwoch, September 20, :10 AM. Avensys. Exposed Single Lever Mixer

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

Parker Hannifin Corporation Porter Instrument Division 245 Township Line Road Hatfield, PA USA Tel: Ref Rev.

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

PRO SINK -R 1 and 2. Dilution system CONTENTS

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

BRAKE SYSTEM BLEEDING

Operating Instructions Model and Hydrostatic Test Pump

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

WARNING: FOR OUTDOOR USE ONLY

V48 Series 3-Way Pressure-Actuated Water-Regulating Valves With Union Fittings

TWO POST RAM PACKAGE 55 GALLON

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

OPERATION & MAINTENANCE INSTRUCTIONS

V46 Series 2-Way Pressure-Actuated Water-Regulating Valves With Union Fittings

Transcription:

INSTALLATION and OPERATION INSTRUCTIONS FLOJET Beer Pump Panels MODEL NO. 66134-1 66134-2 66134-3 66134-4 IMPORTANT INFORMATION This manual has been prepared to assist you in the operation of Perlick Beer Pump Panel System. We dedicate considerable time to ensure that our products provide the highest level of customer satisfaction. If service is required, your dealer can provide you with a list of qualified service agents. For your own protection, never return merchandise for credit without our approval. We thank you for selecting a Perlick product and assure you of our continuing interest in your satisfaction. Table of Contents Installing the Panel... 2 Panel Diagram... 3 How to Operate the Beer Panel... 4 Beer Pump Diagram... 5 Cleaning Diagram... 6 Cleaning Instructions... 7 Winterizing a System with Beer Pumps... 7 Replacement Parts... 7 8300 West Good Hope Road Milwaukee, WI 53223 Phone 414-353-7060 Fax 414-353-7069 Toll Free 800-558-5592 E-Mail: Perlick@Perlick.com www.perlick.com

Installation Beer Pump Panels Use panel as a template to mark where holes should be drilled on cooler wall. Beer pump panels should not be installed with a height of greater than 5 feet from the cooler floor. A height greater than 5 feet will potentially cause flow issues and require system re-balancing. (Note: Make sure panel is level and pumps are in the vertical position). Drill 9 /64 pilot holes in cooler wall. Use fasteners provided in installation kit to mount the beer pump panel to the cooler wall. Push CO2 supply line over barbed CO2 supply inlet. (See diagram on page 3). Position clamp over joint and tighten. Always use 3 /8 I.D. braided tubing for gas supply line. Gas supply line should have drops going to each panel. (Never connect supply line in a series hook-up. Push beer line (from trunk housing) over barbed liquid outlet on flow reversal valve. (See diagram on page 3). Position clamp over joint and tighten. Push connector hose over liquid inlet on beer pump flow reversal valve inlet fitting. (See diagram on page 3). Position clamp over joint and tighten. (NOTE: Connector hose should not exceed 10 feet in length). Install washer into hex nut on opposite end of connector hose. Connect to top threaded fitting of Perlick Smart Coupler. Important Notes CAUTION: If using CO2 as a pressure supply for pumps, pump exhaust must be vented to a well ventilated area to avoid possible asphyxiation. Never use a single keg to supply more than one beer pump. Using a single keg to supply more than one pump will create flow problems, pump burn out or premature Smart Coupler shut-off. Pump panels should never be installed more than 5 (five) feet above the cooler floor. A height in excess of 5 (five) feet causes additional pressure drop between the keg and pump inlet which may cause degassing or premature Smart Coupler shut-off. Beer pumps must be used in combination with an empty keg sensing device. If an empty keg sensing device is not used premature pump failure will occur. If using compressed air as pressure source to drive pumps, pump and keg regulators need to be seperated. Air must be clean and dry. Cut a piece of CO2 tubing (red 9 /16 vinyl tubing) and push one end onto barbed CO2 outlet to Keg Couplers (See diagram on page3). Position clamp over joint and tighten. Push the other end over the barbed gas inlet on the Perlick Smart Coupler. Position clamp over joint and tighten. 2

Diagram Beer Pump Panel Diagram 3

How to Operate Beer Pump Panels Adjust primary CO2 regulator by turning adjusting screw counterclockwise until it turns freely, then turn hand valve counterclockwise on CO2 cylinder to the fully open position. Next, turn regulator adjusting screw clockwise until required system pressure plus an additional 15 psig is reached. Note: If CO2 is only being used for kegapplied pressure, adjust to approximately 40 psig. Note: If using air to drive beer pumps, adjust the air compressor output regulator pressure to a minimum of 15 psig. greater than the maximum required system pressure required to operate the beer pumps. Maximum setting 100 psig. Adjust secondary CO2 regulator which supplies the keg pressure located on the beer pump panel to the proper pressure setting. Setting depends on beer brand and temperature. Desired goal is to maintain the natural carbonation in the beer. Open the shutoff valves. Ensure the Probe Valve on the Perlick Smart Coupler is in closed position. See figure 1. Ensure the Beer Pump Flow Reversal/Dispense handle is in the dispense position. Adjust the Secondary Air/ CO2 regulator located on the beer pump panel to a minimum operating pressure of 10 psig. Connect the coupler to a regulated water supply with pressure less than 30 psig. Note: Pump damage may occur with pressure higher than 30 psig. Open the water supply. Then open probe valve on Perlick Smart coupler to the 45 position. See figure 2. The beer pump will slowly pump up the beer line in the trunk housing to set psig. Note: If pump continues to run for longer than expected, check lines for possible leaks at one or more of the connections. Gradually increase secondary regulator pressure to the designed system pressure to achieve a flow rate of one gallon per minute from the dispensing head. Note: Maximum beer pump operating pressure is 90 psig. Open dispensing head faucet to purge air trapped within the tubing. Check all gas and liquid line fittings and connections for leaks. Close probe valve on Perlick Smart Coupler. (See figure 1) and disconnect coupler from regulated water source. Clean beer system. After cleaning and rinsing the system, make sure the beer line is full of cold water (beer dispensing from warm beer lines will be poor quality). Tap fresh keg with Perlick Smart Coupler. Open dispensing head faucet until clear beer flows. Smart Coupler Probe Valve Lever Positions Figure 1 Closed Position Figure 2 45 or Cleaning Position Figure 3 Open Position 4

Diagram #2 Beer Pump 5

Diagram #3 Cleaning Diagram 6

Cleaning Instructions General Information The cleaning of beer lines with the new integral flow reversal feature incorporated into the Perlick Beer Pump gives the line cleaner numerous configurations for line cleaning. Although the Perlick Beer Pump can be used as an in-line pump for moving the solution from the coupler to the faucet due to its capability of working with negative lift, the following is the recommended method for cleaning beer lines with the Perlick Beer Pump with integral flow reversal installed. Cleaning Beer Lines using Smart Couplers Disconnect Smart Coupler from beer connector lines and soak Smart Couplers in cleaning solution. Couple the two beer connectors together using Perlick s double male adapter part # 186 with beer washers. Determine which sets of lines will be cleaned together and rotate the Dispense/Reverse Flow handle to the Reverse Flow position on the line which fluid will be circulated from the faucet, to the tap. Remove the faucet from the line to which the Beer Line Cleaner pump will be connected. Soak faucets and brush clean before reinstalling. Connect Beer Line Cleaner pump to the shank. Follow standard beer line cleaning procedures. Perlick recommends that the lines first be flushed with clean warm water (Water temperature not to exceed 100 degrees). Mix line-cleaning solution per manufacturerís directions. Circulate the solution thoroughly (Time for circulation dependent on length of the system and pump capabilities). Rinse the lines using clean cold water (Ensure all line cleaning solution has been removed from the lines to prevent hazardous results). Disconnect line-cleaning pump and reinstall beer faucets. Reconnect couplers to beer connector lines and return Beer Pump Dispense/ Reverse Flow valve to the dispense position. Reconnect couplers to keg and open dispensing head faucets until clear beer flows. Winterizing Systems with Beer Pumps When a beer system with beer pumps will be shut down for an extended period, clean the system thoroughly. After completing the rinsing step, prepare a mixture of 50% food grade Glycerine and 50% water. Load the lines with this mixture and make sure both ends of the system are closed. Glycerine/water mixture should remain in the lines for the duration of the shutdown period. Replacement Parts 44... Air valve 40115... Regulator body 40129... Regulator body 43553A... Regulator repair kit 63706... Flow reversal valve 63707... Elbow, flow reversal, 2/bag 63708... Fitting, tee, gas, barbed 1 /4 with check valve 63709... Fitting, elbow, gas, barbed 1 /4 with check valve 43817... Beer pump, Flo-Jet, w/co 2 elbow & tee 7

8300 West Good Hope Road Milwaukee, WI 53223 Phone 414-353-7060 Fax 414-353-7069 Toll Free 800-558-5592 E-Mail: Perlick@Perlick.com www.perlick.com