I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Similar documents
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

PRESENTATION OUTLINE

Donahue Drive Corridor Traffic Operational Evaluation

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

TECHNICAL MEMORANDUM

Freeway System Considerations

Glenn Avenue Corridor Traffic Operational Evaluation

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Chapter 4 Traffic Analysis

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

Route 7 Corridor Study

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

3.0 PROJECT DESCRIPTION

INTERSTATE 540 IMPROVEMENT STUDY

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Financial Project ID No(s).: and ETDM No(s).: and 14181

FM #: ETDM #: 11241

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Iowa Highway 58 Corridor Improvement Study

DUNBOW ROAD FUNCTIONAL PLANNING

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Project Description Form 8EE

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Operational & Geometrical Analysis Technical Memorandum

Appendix D: Concept Screening

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

FY 2006 TRANSPORTATION CAPITAL PROGRAM

7.0 Preferred Alternative with Service Road Concept

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Washington DC Section of ITE Project Briefing

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

County of Fairfax, Virginia. Department of Transportation

Terwillegar Drive Expressway Draft Concept Plan

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

3.6 Traffic and Transportation/Pedestrian and Bicycle Facilities

Shockoe Bottom Preliminary Traffic and Parking Analysis

Detailed Description of Work

HAMPTON ROADS REGIONAL SAFETY STUDY 2013/2014 UPDATE

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Queensgate Drive Corridor Traffic Study

Part-Time Shoulder Use

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Santa Clara I-280 CORRIDOR STUDY

Short and Long Term Needs

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

CITY OF SPOKANE VALLEY Request for Council Action

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

TABLE TRAFFIC ANALYSIS SCENARIOS

San Tomas Expressway

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Access Routes from US 101 to the Richmond San Rafael Bridge

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

EXHIBIT U THE SCOPE DOCUMENT

Fairfax County Parkway Widening Fairfax County

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Traffic Technical Environmental Study

. Study Overview. . Study Background

Welcome! San Jose Avenue Open House August 25, 2015

Project Description Form 6V

Waterford Lakes Small Area Study

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Transportation Committee Project Priority List

Route 29 Solutions Projects

INNOVATIVE INTERSECTION DESIGN

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Proposed Action, Purpose and Need Technical Memorandum

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011

TABLE OF CONTENTS FEASIBILITY REPORT

State Route 160 (Blue Diamond Highway)

Centerville SGA VIRGINIA BEACH, VA FOLLOW-UP PRESENTATION. Prepared for the City of Virginia Beach December,

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Transcription:

I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Study Overview Interchange Locations

Study Context Follow-up to I-264 Corridor Study (2006) Planning Level Study Not based on survey data Preliminary cost estimates in 2015 dollars Study Purpose to identify appropriate improvements to the facility to adequately accommodate forecasted mainline freeway traffic volumes. Once adopted, the plan for improvements to the I-264 freeway lanes will serve as a guide in the design of improvements to the interstate.

Improvements Context FHWA Conditions on Acceptance of Expressway into Federal Interstate System as I-264 Improvements will bring existing roadway into compliance with current standards Mainline lanes are 11.5 in width vs. 12.0 in width Narrow shoulders Bridge clearance Ramp design speeds I-64 Capacity Widening Add lane or temporary shoulder lane use in each direction on I-264 from Northampton Boulevard to Indian River Road

Network Context For analysis, the network has been modified to add: Improvement associated with I-64/I-264 widening WB I-64 to EB I-264 Construction starting FY 2017 HRTAC Funded Extends to Witchduck Road Relocation of Greenwich Road over I-264 Virginia Beach SGA Recommendations Extension from Bonney Rd to Virginia Beach Blvd over I-264 (CBD/Pembroke SGA) Extension of Sentara Way to Bonney Rd (Rosemont SGA)

Main Lane Line Improvement Configuration

Main Line Lane Configuration

Military Highway Preferred alternative considered future potential LRT access Weave segments are removed Principal deficiencies involve roadway geometry Cost $ 152.6M

I-64 Accommodates HOV lane extensions on I-264 Addresses EB and WB congestion coming from Virginia Beach Can be implemented in stand-alone phases Will require added lanes on I-64 during peak periods Cost $ 466.9M

Newtown Road I-264 widening included I-64/I-264 (HRTAC) associated improvements address deficiencies related to eastbound traffic flow Westbound improvement routes all traffic from Newtown to loop ramp, removing weave with I-64 on-ramp Cost $229.1M

Witchduck Road I-264 widening included I-64/I-264 (HRTAC) associated improvements address deficiencies related to eastbound traffic flow Westbound on and off ramps will function adequately with Witchduck Road widened to 6 lanes. Improvements will not impact LRT extension Cost $361.4M

Independence Boulevard NB Independence to EB & WB I-264 free-flow movement WB Slip ramp access to EB Bonney Road Removes weave movements Does not address congestion at EB off-ramp merge with SB Independence Cost: $465.6M

Freeway Widening Independence-Rosemont Widen to 6 lanes (HOV+5) Cost $ 276.8M

Rosemont Road Tight Diverging Diamond Add Sentara Way connection over I-264 per SGA Plan Close Bonney Road intersection Rosemont widened to 6 lanes in CLRP Cost $459.1M

Laskin Road & Lynnhaven Parkway Lynnhaven Parkway not included in study Prior planning produced preferred improvement alternative Ramps to and from South Great Neck Road were considered Phase 1 of plan implementation

First Colonial Road SPUI (Single Point Urban Interchange) First Colonial Widened to 6 Lanes Combines 2 traffic signals to 1 Removes substandard ramp configuration in SE quadrant Cost: $75.2M

Parks Avenue & Birdneck Road Parks Avenue no improvements needed Birdneck Road minor modification by City in association with Arena

Summary of Alternatives

Summary of Study Key Findings No freeway widening needed east of Rosemont Road No interchange improvements needed at: Parks Avenue Birdneck Road Laskin Road Improvements only to Westbound movements at: Witchduck Road Newtown Road Improvements at Rosemont and at First Colonial predicated on widening of arterial to 6 lanes, and Rosemont includes Sentara Way extension. Independence Boulevard improvements remove weaves and provide for direct movement from northbound Independence to westbound I-264. I-64 interchange addresses most severe deficiencies and can be implemented in stand-alone phases.

Next Steps Individual improvement projects would need to be in CLRP, with identified funding sources and will require approval from FHWA. A typical outline of tasks: o Interchange Modification Report (Required by FHWA & VDOT) Analysis of alternatives Impact assessment Cost Estimates o Environmental Document Public involvement opportunity Preliminary Engineering Public Hearing HRTAC funds scheduled for Agenda discussion in September 2016 PE I-64 / I-264 Interchange ($10 Million)

I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield Planning Director Chris Lawrence AECOM Senior Transportation Engineer