Apparent Bids for Letting of January 20, 2017

Similar documents
ACTIVE PROJECTS DIRECTORY

MISSOURI DEPARTMENT OF TRANSPORTATION NOTICE OF BID OPENING FOR PROPOSED STATE ROAD WORK BIDS TO BE RECEIVED -- January 19, 2018

The Importance of Cattle to Missouri 2013 Breimyer Seminar



STIP Scoping and Design Projects November Administrative Amendment

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

District LPA Federal Project Number Prefix Program Award Date Project Description NW Caldwell County B BRO 2/7/2017 Bridge Replacement NW City

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15

Taylor Road Resurfacing Project

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000


Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Missouri Combined Stream Spawning Season Sand and Gravel Closures

FDOT Treasure Coast Traffic Report

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

OKLAHOMA DEPARTMENT OF TRANSPORTATION

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)


REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

Highway Construction

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

HIGHWAY CAPITAL IMPROVEMENT PLAN

information, please contact the District 9 Offices at or

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

FDOT Treasure Coast Traffic Report


District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17

Legislative Update Williamsburg Residency

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

The Missouri DA List

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

Bidder Sum Form OK Addenda 1 Bid Deposit Exceptions Restricted to Alternate Remarks

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

Culpeper District. Albemarle County Monthly Report September, 2011

Millsap & Singer - Bids Online Report

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

*REVISED-AWARDED CALL ORDER /09/13

Culpeper District. Albemarle County Monthly Report October, 2011

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15


SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS


Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Kentucky Highway District 7

TRANSPORTATION COMMISSION OF WYOMING

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Single Lane Closures, expect delays. Anticipated Schedule: Start Completion Current Stage: August

Air Quality Analysis for Ozone

IDOT Suspends Non-Emergency Road Work for Memorial Day Holiday Weekend Lanes Opened to Improve Traffic Flow

Day 1 to Jasper Engines, Schwartz s Restaurant and Shoe Tree. 95 miles. Elevation gain/loss: 5648 feet.

Plan Holders Listing October 19, 2018 Letting (1) CN McKinley County

FDOT Treasure Coast Traffic Impact Report

South Portland City Council Position Paper of the City Manager

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)


WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

APPENDIX D COST SUMMARY TABLES

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

New Mexico Transportation Funding Challenges

SC 41/Joe Rouse Intersection Improvements

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

2040 Long Range Plan Projects Draft October 2011

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

The Richland County Transportation Penny Program. September 21, 2015

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

CTH M HIGHWAY PROJECT CTH Q to STH 113

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Highway Committee MINUTES OF MEETING August 22, 2016

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

FDOT Treasure Coast Traffic Impact Report


I-70 DENVER - UTAH INCLUDING BERTHOUD AND LOVELAND PASSES

DISTRICT CONSTRUCTION PROGRAM

Kentucky Transportation Center

Engineering - Bicycle and Pedestrian

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Fall Deer NOPPADOL PAOTHONG. Hunting Regulations and Information MISSOURI DEPARTMENT OF CONSERVATION

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Kentucky s Surface Transportation System

Update January 4, 2016

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

OTO BIKE/PED PLAN REPORT

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Transcription:

Apparent Bids for Letting of January 20, 2017 Letting ID: 170120 Cut-Off Time: 11:00:59 AM A01-170120-A01 NODAWAY ****(1): Job J1P3056B Route 71 NODAWAY County. Bridge painting over White Cloud Creek north of Route B near Bolckow, the total length of improvement being 0.124 miles.****(2): Job J1S0623B Route U NODAWAY County. Bridge painting over 102 River east of Rou... Extreme Sandblasting and Paintin $204,846.00 Omega Coatings & Construction, L $337,837.00 Gulf Coast Contracting of FL, LL $344,374.00 International Rigging Group, LLC $368,565.00 Southeast Bridge FL Corp $472,497.00 472497.00 Monoko, LLC $537,157.00 Widel, Inc. $579,092.00 Thomas Industrial Coatings, Inc. $644,133.37 1000000.00 Euro Paint, LLC $648,602.00 K.V.K. Contracting, Inc. $842,260.00 MODOT Page 1 of 8

A02-170120-A02 SULLIVAN ****(1): Job J1P3155 Route 6 SULLIVAN County. Slide repair various locations between Milan and Green City, the total length of improvement being 0.097 miles.****(2): Job J1P3155B Route 5 SULLIVAN County. Slide repair north of Route MM near Browning, the t... Above And Below Contracting, LLC $659,470.60 Boone Construction Co. $663,580.54 5700000.00 Midwest Heavy Construction, LLC $773,220.25 Phillips Hardy, Inc. $784,850.05 BRS Construction, LLC $931,040.00 Young's General Contracting, Inc $936,247.97 Leavenworth Excavating & Equipme D. W. Mertzke Excavating & Truck $941,795.05 $1,023,689.68 B01-170120-B01 LINCOLN PIKE B02-170120-B02 MARION ****(1): Job J2P3116 Route 61 LINCOLN, PIKE County. Resurfacing and coldmilling on southbound lanes from Route 161 to Route E near Auburn, the total length of improvement being 18.765 miles. ****(1): Job J2S3114 Route 168 MARION County. Bridge replacement Route 168 over US 61 at Palmyra, the total length of improvement being 0.155 miles. CSD Environmental Services, Inc. $1,463,554.02 $3,648,839.92 Magruder Paving, LLC $3,683,313.18 Pace Construction ny $3,965,000.00 Lehman Construction, LLC $1,485,837.30 Emery Sapp & Sons, Inc. $1,570,330.00 Boone Construction Co. $1,576,653.67 5700000.00 $1,596,753.40 Bleigh Construction ny $2,080,552.49 MODOT Page 2 of 8

B03-170120-B03 RALLS ****(1): Job J2S3115 Route P RALLS County. Bridge replacement Route P over Hippo Creek near Route 19, the total length of improvement being 0.182 miles. Boone Construction Co. $567,943.65 5700000.00 Don Schnieders Excavating n $572,735.67 $587,356.00 Bleigh Construction ny $595,696.55 Lehman Construction, LLC $672,497.00 C01-170120-C01 CASS ****(1): Job J4P2360 Route 49 CASS County. Bridge rehabilitation over South Grand River north of Archie, the total length of improvement being 0.56 miles. Capital Paving & Construction, L $4,821,699.46 Clarkson Construction ny $5,684,821.59 Emery Sapp & Sons, Inc. $5,884,454.98 L. G. Barcus and Sons, Inc. $6,094,900.14 Phillips Hardy, Inc. $6,654,485.45 Radmacher Brothers Excavating Co $8,968,426.46 C03-170120-C03 JACKSON C04-170120-C04 CLAY ****(1): Job J4P3128 Route 291 JACKSON County. Resurface and intersection improvements from I-470 to route 50, the total length of improvement being 3.36 miles. ****(1): Job J4P3166 Route 291 CLAY County. Add turn lane and ADA improvements at the intersection of 103rd and 104th street, the total length of improvement being 0.143 miles. Structural Assurance, LLC $9,522,192.06 Superior Bowen Asphalt ny, $2,775,655.48 $3,299,427.79 Ideker, Inc. $3,387,695.77 Mega Industries Corporation $301,522.10 Gunter Construction ny $328,405.30 Freeman Concrete Construction, L $358,700.60 Amino Bros. Co., Inc. $363,088.44 Custom Lighting Services, LLC db $442,646.88 MODOT Page 3 of 8

C05-170120-C05 JACKSON ****(1): Job J4S3131 Route Colbern Road JACKSON County. Bridge deck replacement over Route 470 and Route 291 in Lee's Summit, the total length of improvement being 0.4654 miles. Clarkson Construction ny $5,132,259.68 Phillips Hardy, Inc. $5,237,549.75 L. G. Barcus and Sons, Inc. $6,345,950.36 Comanche Construction, Inc. $6,581,759.84 C07-170120-C07 JACKSON C08-170120-C08 JACKSON D01-170120-D01 MILLER ****(1): Job J4S3134 Route 7 JACKSON County. Bridge rehabilitation over Route 24 in Jackson County, the total length of improvement being 0.1 miles. ****(1): Job J4S3135 Route JACKSON County. Bridge rehabilitation over I-470 at Raytown Road, the total length of improvement being 0.08 miles. ****(1): Job J5P3102 Route 52 MILLER County. Bridge rehabilitation over Route 54 south of Eldon, the total length of improvement being 0.22 miles. Clarkson Construction ny $1,098,157.34 Comanche Construction, Inc. $1,105,717.62 Phillips Hardy, Inc. $1,157,240.50 L. G. Barcus and Sons, Inc. $1,227,076.37 Clarkson Construction ny $1,911,824.40 Phillips Hardy, Inc. $2,033,754.65 Comanche Construction, Inc. $2,186,800.58 L. G. Barcus and Sons, Inc. $2,205,483.06 Widel, Inc. $1,184,003.90 Capital Paving & Construction, L $1,188,879.20 Phillips Hardy, Inc. $1,345,850.40 Don Schnieders Excavating n $1,797,656.85 D02-170120-D02 GASCONADE ****(1): Job J5P3164 Route 50 GASCONADE County. Bridge rehabilitation at the Gasconade River near Mount Sterling, the total length of improvement being 0.14 miles. Lehman Construction, LLC $1,920,918.30 Lehman Construction, LLC $399,544.00 Phillips Hardy, Inc. $480,147.50 MODOT Page 4 of 8

D03-170120-D03 CRAWFORD ****(1): Job J5S3040 Route 19 Lehman Construction, LLC $1,925,513.93 CRAWFORD County. Grading, pavement and bridge replacement over Crooked Phillips Hardy, Inc. $2,138,899.12 Creek on Route 19 near Cherryville, the total length of improvement being 0.17 Capital Paving & Construction, L $2,214,979.11 miles.****(2): Job J5S3143 Route M CRAWFORD County. Grading, pavement Boone Construction Co. $2,319,202.77 5700000.00 and b... Kozeny-Wagner, Inc. $2,380,000.00 D04-170120-D04 CALLAWAY D05-170120-D05 COOPER ****(1): Job J5S3058 Route O CALLAWAY County. 2 Bridge deck replacements at Route O and Route UU over Crows Fork Creek, the total length of improvement being 0.229 miles. ****(1): Job J5S3145 Route B COOPER County. Bridge Redeck Route B over Petite Saline Creek, the total length of improvement being 0.109 miles. Widel, Inc. $649,777.77 Ennis Excavating, LLC $770,902.80 Don Schnieders Excavating n $847,876.07 Capital Paving & Construction, L $875,995.46 Phillips Hardy, Inc. $983,436.15 Lehman Construction, LLC $1,094,935.80 Kozeny-Wagner, Inc. $1,285,593.10 Widel, Inc. $506,275.50 Gene Haile Excavating, Inc. $616,196.02 Lehman Construction, LLC $640,516.30 Don Schnieders Excavating n $645,718.50 Capital Paving & Construction, L $654,682.82 Ennis Excavating, LLC $664,183.80 $729,279.50 F01-170120-F01 ST LOUIS ****(1): Job J6M0261 Route 141 ST LOUIS County. Bridge repair at the intersection with Route 70, the total length of improvement being 0.1 miles. Phillips Hardy, Inc. $777,848.25 St. Louis Bridge Construction Co $453,255.50 MODOT Page 5 of 8

F02-170120-F02 ST CHARLES ****(1): Job J6P3135 Route 364 ST CHARLES County. Guardrail and guard cable from Route 64 to Mid Rivers Mall Drive, the total length of improvement being 8.355 miles. Collins & Hermann, Inc. $1,111,111.11 D & S Fencing ny Inc. $1,355,372.40 F03-170120-F03 ST LOUIS G01-170120-G01 JASPER G02-170120-G02 WEBSTER G03-170120-G03 NEWTON ****(1): Job J6S2179 Route Various ST LOUIS County. Signals, lighting and ADA improvements at various locations in north St. Louis County, the total length of improvement being 0.554 miles. ****(1): Job J7P2228E Route 171 JASPER County. Bridge replacement bridge over Center Creek near Webb City, the total length of improvement being 0.157 miles. ****(1): Job J7P2228J Route BB WEBSTER County. Bridge replacement 5.0 miles south of Route K over Finley Creek, the total length of improvement being 0.155 miles. ****(1): Job J7P2228K Route 43 NEWTON County. Bridge replacement, optional paving 3.8 miles south of Route 60 over Roark Creek, the total length of improvement being 0.133 miles. Gerstner Electric, Inc. $1,422,175.00 Reinhold Electric, Inc. $1,519,780.90 Meyer Electric ny, Inc. $1,624,467.01 Capital Paving & Construction, L $2,165,356.83 Hartman and ny, Inc. $2,530,825.00 Lehman Construction, LLC $2,541,095.65 Phillips Hardy, Inc. $2,624,085.65 Boone Construction Co. $2,799,172.15 5700000.00 Crossland Heavy Contractors, Inc $2,942,913.70 Lehman Construction, LLC $752,258.95 Hartman and ny, Inc. $783,875.00 Phillips Hardy, Inc. $856,641.40 Capital Paving & Construction, L $899,111.92 Boone Construction Co. $576,417.33 5700000.00 Phillips Hardy, Inc. $652,210.55 Capital Paving & Construction, L $652,387.58 Crossland Heavy Contractors, Inc $744,286.60 Sprouls Construction, Inc. $788,936.90 MODOT Page 6 of 8

G04-170120-G04 GREENE VARIOUS ****(1): Job J7P3166 Route Various VARIOUS County. Resurface on Various routes in the Southwest District, the total length of improvement being 73.665 miles.****(2): Job J8S3090 Route H GREENE County. Resurface from Route WW to Farm Road 100 north of Spri... Blevins Asphalt Construction Com $1,449,690.49 Vance Brothers, Inc. $1,472,210.86 Hutchens Construction Co. $1,596,578.81 G05-170120-G05 GREENE H01-170120-H01 SHANNON H02-170120-H02 BOLLINGER, DUNKLIN, NEW MADRID, STODDARD H04-170120-H04 PERRY ****(1): Job J8S0556 Route H GREENE County. Bridge replacement from 1.3 miles south of Route AA to 1 mile north of Valley Water Mill Road north of Springfield, the total length of improvement being 0.11 miles. ****(1): Job J9P0438 Route 19 SHANNON County. Bridge replacement over Sinking Creek 3 miles south of Route EE, the total length of improvement being 0.242 miles. ****(1): Job J9P3043 Route 51 BOLLINGER County. 1 Bridge replacement over Dry Creek, the total length of improvement being 0.071 miles.****(2): Job J9S3034 Route U NEW MADRID County. 1 Bridge replacement over Dry Run Creek 8.0 miles northeast of Lilbourn,... ****(1): Job J9S3166 Route H PERRY County. Resurface and add shoulders from Route 61 to Route 51 near McBride, the total length of improvement being 6.814 miles. Lehman Construction, LLC $654,475.80 Boone Construction Co. $659,910.98 5700000.00 Hartman and ny, Inc. $698,750.00 Ennis Excavating, LLC $750,751.50 Capital Paving & Construction, L $784,583.92 Phillips Hardy, Inc. $811,682.50 Lehman Construction, LLC $2,868,552.90 Robertson Contractors, Inc. $3,296,642.40 Emery Sapp & Sons, Inc. $3,361,314.00 Fricke Management & Contracting, $3,536,002.20 Penzel Construction ny, Inc $4,054,638.20 Joe's Bridge & Grading, Inc. $4,358,478.95 Robertson Contractors, Inc. $4,504,392.15 $998,388.62 Pace Construction ny $1,079,000.00 MODOT Page 7 of 8

H05-170120-H05 BOLLINGER, PERRY, STE GENEVIEVE (128 Apparent Bids) ****(1): Job J9S3173 Route K BOLLINGER, PERRY County. Resurface from Route O in Perry County to Route 72 in Bollinger County, the total length of improvement being 10.076 miles.****(2): Job J9S3176 Route A STE GENEVIEVE County. Resurface from Route 61 to... Pace Construction ny $786,000.00 Apex Paving Co. $840,219.14 $850,978.26 MODOT Page 8 of 8