KnowledgeFOrResilientsoCiEty

Similar documents
Category Goods: Activities ShowHide Description Reference #

UNESCO/ European Commission - 549RAF5001

Sensing and Modeling of Terrain Features using Crawling Robots

Debenture Servicing Audit

Selection Review Description Estimate Issuance

GOLFZON REAL has superior graphic features

Net Receipts by County

2018 FIVB DEVELOPMENT PROJECTS PLATFORM

Smart Card based application for IITK Swimming Pool management

Status of Mission Agreement (SOMA) on the Establishment and Management of the Sri Lanka Monitoring Mission (SLMM)

CITY OF JOPLIN, MISSOURI

Questions and answers

ASTICT1 - SQA Unit Code H54P 04 Prepare to carry out cleaning operations on information communication technology (ICT) equipment

2018/2019 Ontario Cup Request to Host

R 3 CATEGORIES RANKINGS R

TLN WRO Document. Back to Back CAS support

Adaptation of Formation According to Opponent Analysis

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods

NATIONAL TRANSMISSION CORPORATION CORPORATE SERVICES GROUP TransCo Annex Bldg., Diliman, Quezon City Tel. No /Fax No.

TITLE 11. DEPARTMENT OF JUSTICE NOTICE OF PROPOSED RULEMAKING

Hazard Communication Program

Scottish Golf Conference Digital Solution FAQ. Frequently Asked Questions for Golfers:

ANNUAL PROCUREMENT PLAN FOR ERB DATE FOR. No.

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1.

Sales Quotation For: Tyler Software & Related Services. City of Cape Girardeau Page 1 of 9

CORE MICRO PRODUCTS. FFC/FPC, Board-to-Board, Microminiature Wire-to-Board and Memory Card Connectors

U.S. NATIONAL TARGET CHAMPIONSHIPS & U.S. OPEN / JOAD NATIONAL OUTDOOR CHAMPIONSHIPS

2.00 m x 2.00 m x 3.00 m space allowance Outdoor installation, must be able to withstand the elements

PRINCIPAL INVESTIGATOR S ACKNOWLEDGMENT OF RESPONSIBILITIES

U.S. NATIONAL TARGET CHAMPIONSHIPS & U.S. OPEN / JOAD NATIONAL OUTDOOR CHAMPIONSHIPS

University of Cincinnati. Radiation Safety Committee Operations Guidelines Statement of Policy (RSC Guidelines) RSC Guidelines (revision 5)

Lean Six Sigma Green Belt Project. Amanda Keilholz, Program Manager October 19, 2017

GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT

UTAH HUNTING AND FISHING

How EU law becomes EEA law

USA Water Ski Event Sanction Agreement

Beach Handball Commission Meeting no. 14 of the election period Minutes. Venue: Vienna / AUT Date: 1 September :30 18:30 hrs.

Reviewed: DD Month Management of Closed Radioactive Sources

Distributed Control Systems

The Supplemental Oxygen Guide Version 1.1 Updated 6/26/15 Q&A for Every Supplemental Oxygen User

Report Site Inspection World Para Nordic Skiing (WC / WCH)

OHRP Guidance on Written IRB Procedures

CANADA GAMES COUNCIL REQUEST FOR PROPOSAL

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

2014 FIFA WORLD CUP BRAZIL

Quick Reference Guide. Safety & Risk Management Committee Job Descriptions Hockey Canada Safety Program (HCSP) Guidelines 4.

For running only the scoresheet application without any video features only some very basic hardware / software requirements have to be fulfilled:

U.S. NATIONAL TARGET CHAMPIONSHIPS & U.S. OPEN / JOAD NATIONAL OUTDOOR CHAMPIONSHIPS

FINANCIAL REGULATIONS

STATISTICS AT IIHF EVENTS Hardware / Infrastructure / Staff Requirements 2017 Gemini Light Configuration

The programme is open to all National Olympic Committees (NOCs). However, priority will be given to the NOCs with the greatest needs.

Pace and Compass. Teacher Instructions. Overview: Objectives: Materials:

Regulations governing the. EuroLeague Women

Code Basic module and level control complete with optionals code

10 février Procedure and Wild Card Entry Forms for the 2015 FIM Road Racing World Championship Grand Prix

Policy Number: Effective: 07/11/14 Responsible Division: Planning Date: 07/11/2014 FUNCTIONAL CLASSIFICATION AMENDMENT POLICY

LOCATION: Foothill College Pool, El Monte Road, Los Altos Hills, CA

Category Works: Activities ShowHide

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Proposal for a National Road Safety Strategic Plan

Contract # W91QUZ-09-D-0043 AIT IVProject Progress Review (PPR) Lowry. June 5, 2012 Presented by: Joan Rayford, Russ Sanchez Lowry Computer Products

Section 12. Information Technology (IT)

Media Kit NOVEMBER DECEMBER 2017

Now every device for small & medium businesses, at zero upfront

Wade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2. University of Southern Queensland Toowoomba 4350 AUSTRALIA

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION SENATE BILL DRS45071-MQf-19. Short Title: Off-Track Pari-Mutuel Betting. (Public)

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

BIA INDIAN HIGHWAY SAFETY PROGRAM FY2016 LAW ENFORCEMENT GRANT. SECTION A: General Information. This section must be completed for all applicants.

ABC for Lot 1 P 264,000.00

AUTHORITY AND PURPOSE

Adaptability and Fault Tolerance

Introduction to FAST Baptiste ABERT

ICD 10 Transition: What You Don t Already Know and How to Prepare for It!

28 janvier Procedure and Wild Card Entry Forms for the 2016 FIM World Championship Grand Prix

European Technical Standard Order (ETSO)

IIHF UNIFORM PROGRAM GUIDELINES 2014/ /16

AN EVALUATION OF ENCAPSULATED OIL FLOODED SCREW COMPRESSOR SYSTEMS. Nikola Stosic, Ahmed Kovacevic, ian K Smith and Elvedin Mujic

Engineering Design Challenge 3. Mars Colonization. Rules & Game Description

Toronto Public Library

ESAIL D3.1.1 Requirement specifications of the tether test reels

Seamaster 2018 ITTF World Tour SPONSORSHIP IMPLEMENTATION GUIDELINES

BIATHLE & TRIATHLE WORLD TOUR BID DECLARATION

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

DEPARTMENT OF TRANSPORT

17CUP CDP September 27, Joseph Dargel, Planner

TANZANIA BUREAU OF STANDARDS

ExcelDerby User's Manual

Seamaster 2017 ITTF World Tour Media Guidelines

FedRAMP Plan of Actions and Milestones (POA&M) Template Completion Guide. Version 2.0

#19 MONITORING AND PREDICTING PEDESTRIAN BEHAVIOR USING TRAFFIC CAMERAS

Dear Race Directors: We look forward to working with you to make the Illinois Cup series a success. Sincerely, Illinois Cycling Association

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

SERIES SIMULATORS SIMULATORS SIMULATORS

Hot Tubs and Hosepipe Bans (M017)

Oakville, Ontario Case Study

Table of Content IMPORTANT NOTE: Before using this guide, please make sure you have already set up your settings in

POINTS = SINGLE POINTS OF CONTACT SPORTS INTEGRITY

Operating Instructions - Rescue Equipment. RAM Support LRS-T EN Edition (translation of the original operating instructions)

INSTITUTIONAL REVIEW BOARD MANUAL: PURPOSE and POLICIES.

Transcription:

Date: 23-02-2017 Place: TIRANA KnowledgeFOrResilientsoCiEty Procure, install and activate equipment UNIVERSITY OF NOVI SAD

RULES Equipment costs will be reimbursed on the basis of the eligible costs actually incurred. The beneficiaries may not split the purchase of equipment into smaller contracts below the threshold. Furthermore, the equipment must be properly registered in the inventory of the institution concerned. All equipment purchased with the Erasmus+ CBHE funds must bear an Erasmus+ sticker provided by the Agency. VAT is not considered as an eligible project cost. Therefore, the measures for the exemption should be launched sufficiently in advance to the purchase of the equipment.

RULES Compared to the equipment as specified in the original application, minor adaptations in terms of quantity and product in the purchased equipment can be accepted without prior authorization provided that the budgetary ceilings are respected, the corresponding equipment items are eligible, the modification can be justified and is related with the project objectives. In case of significant changes of the equipment to be purchased compared to the equipment as specified in the original application, prior written authorization from the Agency should be given during project implementation.

Higher Education Technical School of Professional Studies in Novi Sad Originaly planned in application Price foreseen Comments PC client x 10 8,000.00 Obligatory Outdoor Handheld GPS GIS Mapping Data Collector Possible change for for other items if 5,000.00 2-5m x 1 VTSNS has no necessity for this item Hand Held Laser Distance Measurer x 1 700.00 Obligatory Digital camera with Tripod x 1 4,000.00 Obligatory Books/Journals/E-books x 10 1,000.00 Obligatory E-book reader x 10 1,000.00 Optional Agent based evaquation simulation software x 1 5,700.00 Conclusons to be made during the meeting-possible changes for other items Laptop computer + external display x 4 4,000.00 Obligatory 29,400.00 *proposed specification of obligatory equipment with characteristics at the end of the presentation

University of Tuzla Originaly planned in application Price foreseen Comments PC client x 10 8,000.00 Obligatory Outdoor Handheld GPS GIS Mapping Data Collector 5,000.00 2-5m x 1 Obligatory Hand Held Laser Distance Measurer x 1 700.00 Obligatory Digital camera with Tripod x 1 4,000.00 Obligatory Books/Journals/E-books x 10 1,000.00 Obligatory E-book reader x 10 1,000.00 Optional Agent based evaquation simulation software x 1 5,700.00 Conclusons to be made during the meeting-possible changes for other items Laptop computer + external display x 4 4,000.00 Obligatory 29,400.00 *proposed specification of obligatory equipment with characteristics at the end of the presentation

University of Banja Luka Originaly planned in application Price foreseen Comments PC client x 10 8,000.00 Obligatory Outdoor Handheld GPS GIS Mapping Data Collector 2-5m x 1 5,000.00 Obligatory Hand Held Laser Distance Measurer x 1 700.00 Obligatory Digital camera with Tripod x 1 4,000.00 Obligatory Books/Journals/E-books x 10 1,000.00 Obligatory E-book reader x 10 1,000.00 Optional Agent based evaquation simulation software x 1 5,700.00 Conclusons to be made during the meeting-possible changes for other items Laptop computer + external display x 4 4,000.00 Obligatory 29,400.00 *proposed specification of obligatory equipment with characteristics at the end of the presentation

Turgut Ozal Education SHA EPOKA University Originaly planned in application Price foreseen Comments PC client x 10 8,000.00 Obligatory Outdoor Handheld GPS GIS Mapping Data Collector 5,000.00 2-5m x 1 Obligatory Hand Held Laser Distance Measurer x 1 700.00 Obligatory Digital camera with Tripod x 1 4,000.00 Obligatory Books/Journals/E-books x 10 1,000.00 Obligatory E-book reader x 10 1,000.00 Optional Agent based evaquation simulation software x 1 5,700.00 Conclusons to be made during the meeting-possible changes for other items Laptop computer + external display x 4 4,000.00 Obligatory 29,400.00 *proposed specification of obligatory equipment with characteristics at the end of the presentation

University of Tirana Originaly planned in application Price foreseen Comments PC client x 10 8,000.00 Obligatory Outdoor Handheld GPS GIS Mapping Data Collector 2-5m x 1 5,000.00 Hand Held Laser Distance Measurer x 1 700.00 Possible change as this is Faculty of Economics-UTA should propose replacement for this item Possible change as this is Faculty of Economics-UTA should propose replacement for this item Digital camera with Tripod x 1 4,000.00 Obligatory Books/Journals/E-books x 10 1,000.00 Obligatory E-book reader x 10 1,000.00 Optional Agent based evaquation simulation software x 1 5,700.00 Possible change as this is Faculty of Economics-UTA should propose replacement for this item Laptop computer + external display x 4 4,000.00 Obligatory 29,400.00 *proposed specification of obligatory equipment with characteristics at the end of the presentation

Procure, install and activate equipment *proposed specification and configuration of obligatory equipment items will be sent by email to all (configuration for UNS) *possible additional equipment: smart board, TV, projector, scanner, printer.

Procure, install and activate equipment Finalizing the equipment specification UTA,EPOKA,UBL,UTZ,VTSNS to deliver a proposed specification of equipment with incorporated changes (as foreseen in previous tables) deadline 10th of March *Please check with the potential suppliers the prices in order to make specification in line with that. *Joint specification must be made in order to send changes to EACEA for approval. Lunching the procurement procedure UNS for Serbia March For BiH who will lead procurement procedure? (April would be good to start ) For AL who will lead procurement procedure? (April would be good to start )

Thank you for your attention Contact info about the presenter: Prof. Dr Sci. Vlastimir Radonjanin, Ass. Prof. Dr Sci. Mirjana Laban radonv@uns.ac.rs mlaban@uns.ac.rs Knowledge FOr Resilient society