Dorset and East Devon Coast World Heritage Site State of Conservation report June 2011 Statement on Site condition.

Similar documents
Appendix to the State of Conservation report June 2010

Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION

Poole Bay & Harbour Coastal Group

Poole Bay, Poole Harbour and Wareham Flood and Coastal Erosion Risk Management. Final Strategy December Aerial photo credit: Kitchenham Ltd

Admiralty Leisure Folio SC5601 East Devon and Dorset Coast, Exmouth to Christchurch

SANDBANKS COAST PROTECTION

storms and coastal defences at chiswell

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions

Australian Coastal Councils Conference

Coastal Change and Conflict

Sustainable Decision Making (SDM) (Foundation and Higher Tier)

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling

Coastal Processes Day Criccieth

GUIDE TO SPOTTING DOLPHINS ALONG DORSET'S JURASSIC COAST

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS

Coastal Processes and Landforms

Reducing regional flood and erosion risk from wave action on the Channel Coast

Chesil Beach, Dorset UK High energy, shingle coastline. Brighton Beach, Sussex UK Pebble beach

Dorset s Fishing Industry

Blyth Estuary Green Travel Project

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

Coastal Processes and Landforms

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING

BETWEEN A ROCK AND A HARD PLACE

Habitat Development: Habitat Boulders Lawson Pier Foreshore Enhancement

Draft Coastal Zone Management Plan for Byron Shire Coastline

Emergency Coastal Protection Works Practical Lessons For The Future From The Past

AMENITY SIGNIFICANCE OF EFFECT TABLES

Coast Survey Stretch 03 Seaview High Street to Sandown Zoo

SHOREHAM BEACH LOCAL NATURE RESERVE

Borough Head to Dinas Fach

Marine Tourism and Angling Development Facilities

START. Whitecliff Recreation Ground, Whitecliff Road, Parkstone, Poole, BH14 8DB CAR PARK PARTICIPANT HOLDING AREA

Environmental Protection on the Gold Coast of Queensland, Australia. 1. What is the appeal of the Gold Coast to tourists?

Llandudno Beach Management Plan and Options Appraisal

Dominica. Wise practices for coping with. i b bea n Se a

1.1 Coastal processes produce landforms

Coastal Morphology Technical Note Lincshore. TN002/L/2013 March Title here in 8pt Arial (change text colour to black) i

COASTAL SYSTEMS WAVE ENERGY

Formation and characteristics of different types of beaches

CHAPTER 8 ASSESSMENT OF COASTAL VULNERABILITY INDEX

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK

Part 9 Specific Land Uses - Foreshore & Waterway Development

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT

Montserrat. Wise practices for coping with. i b bea n Se a

Review of Beach Management Plans and ad-hoc management in Southeast England. Alex Cargo, Uwe Dornbusch. Southern Logo to come

NOAA Fisheries Update:

INTRODUCTION TO COASTAL ENGINEERING

Studland Bay Context and Learning Aims

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

NCCOE EA Coastal Adaptation Guidelines. Section I Emerging Technology Novel Alternative Approaches to Coastal Erosion

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

MARINE ANTIQUITIES SCHEME

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

Our coastline is changing

Chapel Point to Anderby Creek

Management Area 19 Management Area 20 Management Area 21 Management Area 22. Mount s Bay West (The Greeb to Point Spaniard)

Southampton. Our cottage/retirement home: The pre-build phase

LYME BAY HOW IT WORKS. The Reserve is managed by a Consultative Committee; 42 boats fish under voluntary regulation through a code of conduct;

Nevis. Wise practices for coping with

Review of Beach Management Plans and ad-hoc management in Southeast England

COASTS (P.38-45) Management: Hard engineering: Groynes Sea walls Gabions Soft Engineering: Beach replenishment Dune regeneration

Other useful information Nearest Refreshments: In the Victoria Inn or the Lugger Inn, in Chickerell OS Explorer Map: OL15 (Purbeck and South Dorset)

DRAFT. Management Area 19 Management Area 20 Management Area 21 Management Area 22

IYS(18)06_EU UK (Northern Ireland) Report on Planned Actions to Implement the International Year of the Salmon (IYS) Initiative

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017

Maps The maps provided are a guide and are not to scale. Please use OS Explorer Map 120 (Chichester).

SHOOTING THE FACTS AT YOUR FINGERTIPS

The Sea Geography Notes JC-Learn. JC-Learn. Geography Notes The Sea. 1 P a g e

OECS Regional Engineering Workshop September 29 October 3, 2014

IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW. Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994.

GERALDTON NORTHERN BEACHES STABILISATION PROGRAMME (NBSP)

The Kent Coast Coastal Access Report

Waves- how are they formed and how do they affect the coast?

St Kitts. Wise practices for coping with

CYCLING TIME TRIALS The national governing body for CYCLING time trials

31. Rosses Point Mini-Plan

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

St Brides Bay coastal waters east

SHORELINE MANAGEMENT PLAN REVIEW (SMP2) POOLE & CHRISTCHURCH BAYS HURST SPIT TO DURLSTON HEAD. Scoping Report

CHAPTER 181 MAN-MADE BEACHES MORE THAN 20 YEARS ON FRANCK ROUCH 1 BERNARD BELLESSORT Z

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

East Devon Way Circulars

VLH Ltd, Nereide Ltd, Saltlake Resorts Ltd Proposed Beach Erosion Protection Works at Bel Ombre Environmental Impact Assessment

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072,

Controlling Coastal erosion

Anguilla. Wise practices for coping with. i b bea n Se a

GENERIC ENVIRONMENT RISK ASSESSMENT

Unit 13 A Contrasting UK Locality. Lulworth, Dorset

The Study of Coastal Erosion on the Happisburgh Coast

Map Introduction: Grimsay Map 1

Salmon Five Point Approach restoring salmon in England

Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File:

RANDWICK CITY COUNCIL Residential Discussion Paper SUMMARY DOCUMENT

RI Regulatory Setbacks & Buffers: Coastal Management Issues

SAILING AWAY FROM LONDON

APPROVAL TO GRANT A NEW BUILDING AND A NEW RECREATIONAL LEASE TO THE WORSER BAY BOATING CLUB & THE WORSER BAY LIFE SAVING CLUB

Sustainable Fisheries for Future Generations The Fisheries White Paper

Transcription:

Dorset and East Devon Coast World Heritage Site State of Conservation report June 2011 Statement on Site condition. Twelve of the thirteen Sites of Special Scientific Interest are in favourable condition. Sixty one of the sixty six GCR sites remain in favourable stable condition while the remaining five are declining or in unfavourable condition, representing 7.5% of the GCR interests or 2% of the physical Site. In other words, there are only a number of small, specific problem areas relative to the whole Site. These sites were in this condition before designation as a World Heritage Site and many represent a major challenge if they are to be improved. Summary table for SSSI condition for geological interest: Condition Notes Exe Estuary Budleigh Salterton Cliffs Otter Estuary Ladram to Sidmouth Sidmouth to Beer Coast Axmouth to Lyme Regis Undercliffs West Dorset Coast Chesil and the Fleet Isle of Portland Many of the inland quarry sites that also make up the SSSI are unfavourable and/or declining Portland Harbour Shore Unfavourable Earth science units in the cliff are unfavourable in places South Dorset Coast Purbeck Ridge (East) Areas of the SSSI outside the World Heritage Site boundary are unfavourable. Studland Cliffs The detailed monitoring data based on individual ENSIS units and biological/geological interests can be accessed on line at www.natureonthemap.org.uk. Unfavourable Geological Conservation Review (GCR) sites are: CGR number and interest GCR 51 Aalenian Bajocian (Inferior Oolite) GCR 636 Albian Aptian (Lower Greensand) GCR 724 Portlandian Berriasian (Purbeck Beds) GCR 828 Oxfordian Oxford Clay and Corallian Beds GCR 1297 Kimmeridgian GCR 1298 Kimmeridgian Description and reason for unfavourable status Relates to Burton Cliff Lane outside the Site and which is suffering from vegetation growth. Punfield Cove, north end of Swanage Bay. Interest obscured by vegetation due to a decline in erosion rates. Durlston Bay, Swanage interest obscured due to coastal defences that pre date designation. Defences cover a small proportion of the overall interest and therefore most of the site is favourable. Sandsfoot/Portland Harbour Shore. Decline of coast sections due to construction of the breakwaters together with ad hoc development, coast defence structures and failed buildings/garden debris on the foreshore. Ringstead Bay interest obscured due to coastal defences that pre date designation. The interest is partly obscured by a recharged beach. held in place by terminal groyne. East Fleet to Smallmouth Sands Debris on the foreshore. 1

The appendix summarises the 2006 to 2011 period. What follows below is an account of what has taken place over the last year; June 2010 to June 2011. Issues measured against Aims 1 and 2 of the World Heritage Site Management Plan WHS Management Plan (WHS MP) Policy No. 1.1. Planning frameworks. The Local Development Frameworks are progressing but no further discussions have been held. The emerging LDF s across the coast vary from district to district in many ways, including the consideration of the WH site. (WHS MP) Policy No 1. 2, 1.3, 1.6: The Shoreline Management Plan review for both the South Devon and Dorset SMP and the Poole and Bournemouth Bays SMP have now been completed and adopted by the operating authorities, the Environment Agency and DEFRA. The plans define coastal management policy for the next 100 years and therefore, by definition, the principal threats to the Site. In many areas previous Hold the Line policy will change to Managed Realignment or No Active Intervention which will favour the natural interests in the long term. In a few areas developing SMP policy may be at odds with the objectives of the Management Plan. Below is a summary of where the conflicts have been identified: SMP Unit 6a35 6a19 6a10 Location Pennington Point Sidmouth East Cliff Lyme Regis East Beach, West Bay Policy: short medium Long Notes (MR: Managed Realignment, HtL: Hold the Line, NAI: No Active Intervention) MR MR MR The unit extends some 400m east of the river HtL HtL MR Involves the construction of a new sea wall and slope stabilisation measures. Planning Permission approved 2010 HtL HtL MR Short term continued beach management moving towards a flood defence barrier in the longer term 6a02 Chesil Beach Htl HtL HtL Extended area of managed realignment in response to major storm events 5g18 (c) Dowmans Place to Castle Cove MR MR HtL Despite the SMP policy, consultant engineers for W&PBC indicate that there will be a need for some form of engineering intervention shortly 5g07 Lulworth Cove (defended MR MR MR Hold the line of existing amenity 5g03 length) Kimmeridge Bay (defended length) MR MR MR Hold the line of existing amenity. Not a big issue. Areas where site condition may well improve over time as a result of SMP policy: Charmouth HtL MR The current defences will no longer be maintained after 25 years and therefore more natural processes are likely to re establish 6g14 Seatown HtL NAI NAI As above 5g10 Ringstead HtL NAI NAI As above 5g01 Durlston Bay NAI As above HtL: Hold the Line, MR: Managed Realignment, NAI: No Active Intervention 2

The Coastal Pathfinder project led by Dorset County Council has been exploring the issues around changing SMP policy, particularly where that will lead to a change from Hold the Line to Managed Realignment or No Active Intervention. They have been looking at six study sites along the Jurassic Coast; Pennngton Point (Sidmouth), Charmouth, Seatown, Preston Beach Road, Ringstead and North Swanage and will make its report to DEFRA shortly. The Strategic Monitoring Programme has been supported for a further five years and will continue to develop a long term management tool for the coast. Monitoring is to a common standard that will deliver valuable information that will better inform future management. The way rider buoys in particular have proved useful in correlating storm/swell wave events with observed change on the Site. Specific issues and/or actions in 2010/11 The Pines Hotel, North Swanage; Application no. 6/2011/0333. Application for cliff stabilisation works directly in front of the hotel but outside the WHS boundary. The cliff lies within the Purbeck East SSSI and forms part of GCR site 2629 for Wealden stratigraphy which extends into the WHS. No objection on the grounds that the site is compromised by existing coastal management. Construction may create opportunities for study. 28 Burlington Road, Swanage; Application no. 6/2011/0333 (outside the Site but part of the same GCR for the Wealden stratigraphy). Planning application for construction of beach huts turned down. No objection from WHS team or Natural England. Belle View Road, Portland Harbour Shore; Application No. (10/000547/FUL). W&PBC granted planning permission for slope stabilisation works in front of the property. No objection from WHS team because the works lie outside the WHS boundary. Chesil Cove sea wall; W&PBC application to refurbish the base of the sea wall granted. No objection from WHS Team to the works which were undertaken between March and May 2011. West Bay beach management plan and recharge. Beach recharge from Freshwater completed in the autumn of 2010. The EA have completed their plan which includes the option to import shingle from Chard Junction gravel pits under emergency conditions/emergency Powers Act. WHS has expressed concerns and suggested that the flood defence barrier, currently identified as a medium to long term defence within the SMP should in fact be happening now and at a location far enough back to allow the beach to continue to migrate onshore. Charmouth, construction of a slipway across the foreshore. Informal discussions with Charmouth Parish Council over the idea. No formal application made to date. Spittles tip slip (Lyme Regis) clean up operations. WDDC commissioned clean up of the beach in December 2010 and May 2011. Fossil collecting. Digging in situ along Stonebarrow cliffs challenged four times in the autumn. Natural England wrote informal warning to a person seen removing large boulders from Monmouth Beach (may not have been a fossil collector). Monmouth Beach huts, Lyme Regis; Planning application (1/D/10/001891) to move beach huts forward further onto the beach. Advice to Natural England; no impact to the Site. Early ideas to move the powerboat and/or sailing club forward have been opposed by NE and the WHS team at an informal level. 3

Ware Fields, Lyme Regis. Informal meeting (June 2011) to explore possibility of installing drainage above failing cliff threatening beach huts on Monmouth Beach. Branscombe; continued unconsented maintenance of rock armour in front of beach huts to the west. NE to write an informal letter highlighting the requirements to follow planning procedure. Sidmouth Pennington Point coast defence; planning application (11/0904/FUL) for 240m of rock armour, 12m wide and 6m high along the beach east of the Sid, made by residents of Pennington Point. Objection made by WHS team and NE in May 2011. Developments in the setting of the Site (WHS MP) Policy 1.9. A licence has been granted to explore the potential for an offshore wind farm off the Purbeck coast and the developer has been consulting widely on the options. A preferred site has been identified towards the middle of the licensed area. (WHS MP) Policies 1.3, 1.4, 1.5 November 2010: East Devon Golf Club: Informal views sought for realignment of fairways nearest the coast further inland. June 2011; 23A Northview Road Budleigh Salterton (11/1267/FUL). Application to demolish and rebuild existing property near cliff edge. Questions raised on sustainability and long term conflict with coastal erosion but no objection. Application probably reduces visibility of existing building. June 2011: Ladram Bay Holiday Park extension on their inland boundaries. No objection. Landscape issues should be through the East Devon AONB February 2011: Holmside, Higher Sea Lane, Charmouth, (1/D/10/002095), demolition of existing property and construction of two more on cliff top locality. January 2011: Anchor Inn, Seatown, 1/D/10/001957, Comments and questions on sustainability of planning application June 2011: Old Coastguard Caravan site, Burton Bradstock (PRE/11/00159) pre planning opinion. Drainage onto the cliffs is a minor but direct WHS matter, the rest; conversion of caravans into log cabins and moving back from the coast, are landscape matters. December 2010: 27a Old Castle Road, Portland Harbour Shore; a second application to construct two properties rather than one. Identical response to previous; sustainability concerns of developing so close to an unstable cliff plus concerns of intervention in the slope. Pleasure Pier, Weymouth 11/00512/FUL Construction of 53m high observation tower and temporary facilities for the Olympics 11/00429/FULMAJ. (WHS MP) Policy 1.14, 1.15 and 1.16. Quarrying The Coastal Strip, Portland. The modification order remains in place and discussions are ongoing regarding the impact of that order on the companies ability to work the resource. 4

Site improvements The planned removal of the WWII lookout on Peveril Point, Swanage supports WHS MP Policy 2.4. Swanage Town Council has received match funding from the WHS and NE and subject to planning approval, will remove the structure this year. (WHS MP) Policy 2.5, 2.6 and 2.7 Fossil collecting The fossil collecting code of conduct for West Dorset has been in operation for twelve years now and a review and consultation period commenced from June until September 2011. Responses to the consultation will be considered by the SCAG and fossil code working group prior to the development of a reviewed code. The West Dorset code does not apply to the Undercliffs National Nature Reserve but the interests and site are very similar. Concerns regarding a possible decline in the large ammonites on Monmouth Beach are the subject of a specific monitoring programme. Recent discussions suggest that the large ammonites come from specimens typically exposed near the surface of beds such as Grey Ledge (Lang s bed 47) whereas the large, well preserved Coroniceras are contained within the middle of the bed. It is now suggested that the well preserved Coroniceras are not the main source of the large, visible ammonites because the boulders that they are contained in break up before the ammonites are worn through and therefore their collection is not so significant. Early work commissioned from Exeter University studying the movement of boulders on the beach has already shown a considerable break up of large boulders. The decline is more likely to be tourist collecting and the natural balance of supply (i.e. cliff fall) and collection. A new sign has been placed at the entrance to Monmouth Beach requesting that the larger ammonites are left. Natural England has also requested that all large ammonites should not be removed from the beach. Also on Monmouth beach, the very large ichthyosaur discovered as a result of a cliff fall in December 2009 remains in the cliffs. Discussions as to the pros and cons of excavation have split virtually every group down the middle. The SCAG advocates a precautionary approach. We are now waiting for full engineering drawings of the proposed excavation and may take a second opinion before making a decision. The fossil warden has been employed again, now for the fourth year in a row. The post continues to be well received although some comments are emerging suggesting that he should spend more time on the cliffs and less on guided walks. (WHS MP) Policy 2.8 Work to implement the management plan at Horn Park Quarry, near Beaminster has continued with clearance of vegetation and rubble from the quarry surface. The ambition remains to open the site to the public in some form or other. Beaminster museum are putting together a display about Horn Park Quarry with the help of Sam Scriven and using fossils donated by Bob chandler and Alan Holiday. (WHS MP) Policy 2.9 The Collecting Cultures Jurassic Life Project led by the Dorset Museum Service and supported with funding from the Heritage Lottery and Dorset and Devon County Councils, is complete. Eight museums have received improved displays and specimens. Highlights include the large pliosaur skull which has gone to Dorset County Museum, a rare turtle donated by Albion Stone to Portland Museum, two partial plesiosaur specimens, a huge fossil fish and a rare Triassic reptile jaw. The expansion of Lyme Regis Museum remains on hold while funding is continued. The temporary fossil exhibition planned for the Lyme Regis Fossil Festival did not take place due to the high cost and lack of funding. 5

The Fine Family Foundation donated an Epic PRO Gigapan robotic head to the Jurassic Coast Team in the spring of 2011. This follows the units and course funded in 2009 for a number of people in Dorset. Gigapan is a panoramic photographic system capable of capturing huge detail and the JC Team has been using it to capture change and record the site. The new system uses a digital SLR and is capable of much higher resolution, making it applicable for longer/more distant viewpoints. In the long term the images will be used to promote the site and capture change. Conclusions The Site remains in a favourable condition, similar to the condition when it was included on the World Heritage List by UNESCO in December 2001. Specific management initiatives are working well and some spectacular and challenging discoveries have been made (the Weymouth Bay Pliosaur and the Monmouth Beach ichthyosaur for example). The planning application at Pennington Point represents a major challenge to the WHS team and its partners. There appears to have been an increase in planning applications within or adjascent to the Site and a key piece of work this year is in defining how we respond to applications that may or may not affect the setting. Key achievements: The World Heritage Team and its partners have broken new ground in Earth science conservation and management; A fossil code for West Dorset; review under way The Collecting Cultures project; completed SMP completed The tasks for the future: 1. Ongoing monitoring of SSSI s through ENSIS and GCR World Heritage Site team systems. 2. Complete the review of the West Dorset fossil code 3. Develop a position on development that may impact on the setting of the site 4. The ongoing maintenance and development of management initiatives 5. Catalogue of specimens from the Site in museum/university collections 6. Promotion of acquisition of key scientifically important specimens. 7. Mapping the interests and maintaining up to date data Appendix 1 contains a site by site summary of key threats, opportunities or developments along the length of the Site over the last six years. - END - 6