Chamber Test Testing Theory

Similar documents
Succeeding with Production Air Leak Testing Methods. Paul Chamberlain President, CEO

Single Pressure/ vacuum decay leak rate, loss, rate of loss, or occlusion tests with standard Cv valves.

628 Differential Pressure Decay Leak Tester

Finding Leak Testing Success Through Calibration and Validation. Paul Chamberlain President, CEO

FlexAct BT (Bag Tester) Validation November, 2015

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Copyright 2007 Uson L.P. All rights reserved. Printed in the U.S.A.

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

PS-425 Pitot-Static/Air Data Tester

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

User s Guide Ver. 2.00

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Draeger Fabius GS Pre-Use Check

PNEUMATIC PRESSURE CONTROLLERS

RAM 4021-DPX Operation Manual

Glove Box Installation Manual

WATER CONTROL SYSTEM QUICK START

Chapter 6 Leak detection

RAM 4021 Operation Manual

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

University of MN, Minnesota Nano Center Standard Operating Procedure

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

STS PECVD Instructions

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual

Touch Screen Guide. OG-1500 and OG Part # T011

KEM Scientific, Inc. Instruments for Science from Scientists

Integrity Testing LifeASSURE BNA045 and BNA065 Series Filter Cartridges

Sizing Pulsation Dampeners Is Critical to Effectiveness

A Reliable and Tracer Gas Independent Leak Detector for Food Packages

Arizona State University NanoFab XACTIX ETCHER. Rev A

CanNeed-DSST-100 Digital Secure Seal Tester --- To evaluate the secure seal quality of PET bottles, glass bottles and cans

COSMO INSTRUMENTS CO., LTD.

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Series 7250 Ruska High-Speed Digital Pressure Controller. GE Sensing. Features

CircuFlow Quick Setup Guide

Pressure Automated Calibration Equipment

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

ATM 322 Basic Pneumatics H.W.6 Modules 5 7

Memorandum Background: Results and Discussion:

The HumiPyc ( Model 2) - Gas Pycnometer; Density, Moisture, Permeation Analyzer; Filter Integrity Tester; RH sensor Calibrator

INSTRUCTION & OPERATION MANUAL. Leakfinder. Model No. GE B. General Motors Evaporative Emissions System Tester (EEST) & Smoke Machine

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

The latest automotive systems require innovative leak test methods and fixturing.

Time-Delay Electropneumatic Applications

Leakfinder INSTRUCTION MANUAL. Diagnostic Smoke Vapor Machine. Model No. WV605. with UltraTraceUV Dye Solution

SX150A. Features. Typical Applications. Description

ASSE International Product (Seal) Listing Program

We agree the CGA publication more adequately reflects the equipment accuracy requirements for performing a pressure test on cylinders.

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

TR Electronic Pressure Regulator. User s Manual

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

CHECK-VALVES Automatically Position Themselves by the Natural Forces of the Conveying Air. A PNEUMATIC CONVEYING SYSTEM PATENT #: 5,160,222

The Helium Leak Detector

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

Burner Management System DEMO Operating instructions

The HumiPyc - Model 1 - Gas Pycnometer; Density, Moisture, Permeation Analyzer; RH sensor Calibrator

Leakfinder INSTRUCTION MANUAL. Diagnostic Smoke Vapor Machine. with UltraTraceUV Dye Solution. Model No. 625-WV608

Procedures for operation of the TA Instruments DSC

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

- Repeat calibration until desired results are reached otherwise set SW2 and SW1-8 open.

Additel761 Series Firmware Updates

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare

Quick Start Setup Instructions for Raven LRC & AgXcel Harness for NH3 Profile plus GX40 Synergist

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

STS ICP-RIE. Scott Munro (2-4826,

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Test Report # Rev 0. Adiabatic Compression With Constant Bleed Valve

Safety Aspects and Design of the Vent Isolation Chamber. Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Vacuum Poppet Valves. Телефон: +7 (499) (многоканальный)

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

Design Envelope Booster. Sequence of operation

Lecture 19 PRESSURE-CONTROL VALVES [CONTINUED]

P/V Vent Presentation - Husky Corporation. Husky P/V Vent Overview NSW Government

PPC2+ BG0002. Operation and Maintenance Manual (Use with PPC2+ Operation and Maintenance Manual) 2001 DH Instruments, Inc.

GCMSD-Headspace Analysis SOP

PANACEA P200 STAINLESS STEEL USER MANUAL

Commercial Practice Test Method Internal Vapor Analysis of Hermetic Devices

HANDBOOK. Squeeze Off Unit SOU 400. Please refer any queries to:

Xactix Xenon Difluoride Etcher

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

Early evap monitors. Photo courtesy Toyota Motor Sales, U.S.A., Inc.; diagram courtesy University of Toyota

v. Size shall be specified on drawings.

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

Vapor Sorption Analyzer

These variables can be accessed by holding the UP button for 5 seconds.

GP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI

GDS OPERATING PROCEDURE

HANDBOOK. Squeeze Off Unit SOU 250. Please refer any queries to:

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

Mass Spec will not Autotune

Easy Nest Kits. Installation Suggestions

bespoke In general health and rehabilitation Breath-by-breath multi-functional respiratory gas analyser In human performance

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results.

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

BAM - 3.2: Section Pressure Equipment Pressure Receptacles; Fuel Gas Storage Systems 26 th September 2014

Transcription:

Chamber Test Testing Theory A chamber test is used to find leaks in sealed packaging or sealed devices without an opening to use for filling. To test the part, a technique called meteredvolume fill must be employed. The test works by filling a reference volume to a set pressure, after pneumatic isolation, the pressurized volume is then introduced to the test chamber through an equalization valve. With a known good part in the chamber resulting pressure will equalize to the desired test pressure. This same procedure done with a gross leaking part will not reach this same value due to an increase in total volume. This difference between the test pressures will be used to set the pressure tolerance. A part that doesn t fill to the test pressure within the pressure tolerance is a gross leak and will fail the test. If the part passes this gross test, the testing will continue with typical pressure decay test steps. For example: A reference volume of 100 ml (filled to 10.0psi), and test chamber with a volume of 150 ml, and a part with a volume of 50 ml isolated by a valve. The chamber volume with the part installed is 100 ml. Filled to 10.0psig 100 ml 150 ml CLOSED 50 ml part volume The valve separating the two chambers opens. With a good part in the test chamber the both chambers equalize to 5psig. Equalized to 5.0psig OPEN With a gross leaking part in the test chamber, and the equalization valve open, both chambers equalize to a lower pressure due to the change in volume. Equalized to 4.0psig OPEN

Test Setup Step Definitions: Screen shown from PROG Menu Parameters Button Fast Fill This timer sets the duration of the initial pre-charge of the reference volume. The Timed radio button should be selected F Fill Pressure Not used in this application. Should be set to 0.00 Fill This is the amount of time allowed to equalize the reference volume to the test chamber. If the test pressure is not met, within the tolerance, a hi or low pressure error will occur. Settle This is the time allowed to let the pressure and part to settle from any compliance or thermodynamic effects on the part. If the pressure drops greater than the minus tolerance the tester will indicate the failure by ending the test and giving the failure type (Gross). Test This is the time allowed to watch for a decay of the pressure on the test port. This decay will be compared against the Decay value to determine pass/fail status. Vent The vent step has no impact on the pass fail status, it is mostly employed as a safety step to safely vent any pressure out of the part before the operator removes it from the test fixture. The step runs as a standard vent step. Enable Increase Limit This check box enables a second set of limits to be used. If this box is checked the Evaluate at End of Test box should also be checked. Increase A secondary limit for pass/fail status. Used a the top limit for a min/max condition Decay - This value is the amount of pressure drop during the Test step time that will cause a reject condition.

Evaluate at End of Test This check box will allow the test step to run completely to the end of the timer before evaluating the decay for pass/fail status. Leaving the box unchecked will cause the tester to short cycle when the decay value is reached prior to the timer expiring.

Pneumatic Sequence This example is for pressure chamber test (Chamber). Valve 6 (V6) is activated in the Vacuum Chamber test type (VChamb) During the fast fill timer, valve 4 (V4) opens to allow pressure into the reference volume. The pressure is monitored by a reference sensor (X2). The pressure value is shown on the run screen in the lower right corner. X2 Reference Volume V4 V3 Fast Fill step Pressure X1 Vacuum V6 V2 V1 During the fill timer, the volume of pressurized air is sent to the test port. This pressure is monitored by (X1). The change in total volume will cause a pressure drop from the initial charge. With a good part in the test chamber, the target pressure will be achieved. X2 Reference Volume V4 V3 Fill step Pressure X1 Vacuum V6 V2 V1

If the pressure in the test chamber meets the tolerance settings, all valves close and trap test pressure in the chamber with the pressure sensor (X1) monitoring the decay. X2 Reference Volume V4 V3 Settle/Test steps Pressure X1 Vacuum V6 V2 V1

Setting Test Pressure Place a known good part into the test chamber. During the Fast Fill time the reference volume pressure will be displayed in the lower right corner of the run screen. Adjust the regulator on the back of the machine until the good part yields the test pressure set in the Pressure screen (10.00). This might take a couple of tries to fine tune the process. Do not worry if the test fails at this point, we are setting up the fill parameters for now. Depending on the size of the reference volume and the free space around the part, the required reference volume pressure could be around twice or three times the test pressure. Once the pressure has been adjusted, replace the part in the test chamber with a gross leaking device. Running the test without adjusting the regulator or test times should yield a lower test pressure result. For example a good part gets to 10.0psi test pressure; a part with a gross leak might only get to 9.2psi due to the change of volume in the test chamber. This change of pressure will be used to set the +,- tolerance on the test pressure. In this example you could set the - tolerance to 0.7psi. Any part that doesn t reach 10.0psi ±0.7psi will fail the fill step and be considered a gross leaking failure. A sampling of parts should be run to determine the ± tolerances. With the fill step tolerances set, the settle and test step times and limits can be modified to reach the desired leak rate.

Reference Volume The amount of capacity in the reference volume is critical to the success of the test. Using too large of a volume will not allow for a measurable pressure change due to the change in volume. In the example above the 100 ml reference volume is filled to 10psi a gross leaking part filled to 4.0psi. If the reference chamber volume is reduced the resulting drop of a bad part will be increased. The more differential between a good part and bad part For example: Reference Volume reduced to : 50 cc Test chamber: 100 cc Part volume: 50 cc Test pressure: 5.00psi Reference pressure needed to reach test pressure: 15.0psi A gross leaking part would fill to 3.75psi. For test parts with smaller internal cavities the reference volume should be reduced and the reference pressure should increase. The test chamber part gap should be a small as possible. As with all leak testing, a smaller test volume will allow for more sensitivity to pressure changes and a faster cycle time. Formula used : P 1 * V 1 = P 2 * V 2 P 1 = Initial reference pressure charge V 1 = Total reference volume V 2 = Total volume of reference and test volume P 2 will be the resulting pressure during the normal fill step.

Examples of fixtures Single Piece Chamber (cut away view) Test connection Lifting cylinder Test Part The part is loaded into the nest and slid into test position. The lifting cylinder seals the test chamber against the top plate. (801)264-1000 2442 South 2570 West Salt Lake City, UT 84119 www.zaxisinc.com